Planning

As of 11:55 p.m. EPT

Competitive Planning Process
  • The PJM competitive planning process affords non-incumbent transmission developers an opportunity to participate in the regional planning and expansion of the PJM bulk electric system.
  • 2021 Window 3
     open11.3.2021  closed12.8.2021
    2021 Window 2
     open11.3.2021  closed1.22.2022
    2021 Window 1
     open7.2.2021  closed8.31.2021
    2021 SAA Proposal Window
     open4.15.2021  closed9.17.2021
    2020/21 Long-Term Window 1
     open1.11.2021 closed5.11.2021
    2020 Window 4
     open3.3.2021 closed4.2.2021
Planning News from Inside Lines
  • PJM Talks Long-Range Planning at FERC Technical Conference
    Ken Seiler, Vice President – Planning, presented PJM’s perspective on long-range planning Monday at a technical conference called by the Federal Energy Regulatory Commission to explore “Building for the Future Through Electric Regional Transmission Planning and Cost Allocation and Generator Interconnection.” The conference was held as FERC considers its Advance Notice of Proposed Rulemaking (ANOPR) […]
  • PJM Panelists Highlight Transmission Planning and Resilience Focus at NARUC Annual Meeting
    The National Association of Regulatory Utility Commissioners convened its Annual Meeting Nov. 7 through Nov. 10 with the theme Connecting the Dots: Innovative/Disruptive Technology and Regulation. PJM subject matter experts took part in two panel sessions as part of the four-day hybrid virtual and in-person event. The conference’s keynotes and panels spanned key regulatory topics […]
Queued Generation Fuel Mix
As of 11:22 p.m. EPT
Total:
139,637 MW
Renewables:
74,174 MW
Generation Interconnection Requests by Fuel Type
As of 11:22 p.m. EPT
Queues Timeline
As of 7.30.2020 2:49 p.m. EPT
Active Studies
As of 11:23 p.m. EPT
Criteria & Guidelines