Interregional Data Map

Lake Erie Loop Flow
157.3 MW
07.28.2021 16:09:36 EDT
PJM Real-Time Load: 136,983 MW
 
PJM (MISO): $70.88
6,572 / 5,269 MW
MISO LMP: $49.25
PJM (DEOK): $73.37
Ohio Valley Electric Corporation (OVEC)
281 / 129 MW
Louisville Gas and Electric Company (LGEE)
355 / 1,652 MW
Tennessee Valley Authority (TVA)
4 / 0 MW
CPL Retail Energy West (CPLW)
619 / 32 MW
Duke Energy
603 / 348 MW
CPL Retail Energy East (CPLE)
PJM (Neptune): $43.30
375 / 375 MW
NYISO (Neptune): $46.57
PJM (Linden): $43.82
318 / 315 MW
NYISO (Linden): $49.84
PJM (Hudson): $47.01
561 / 560 MW
NYISO (Hudson): $49.03
PJM (NYISO): $45.41
469 / 345 MW
NYISO LMP: $45.96
LMP Values
(USD)
Interregional Map Legend the direction of actual flow Interregional Map Legend actual flow is from a lower interface price to
a higher interface price
Interregional Map Legend actual flow is from a higher interface price to
a lower interface price
Interregional Map Legend an interface without a corresponding
external interface price
Interregional Map Legend actual flow across interface Interregional Map Legend scheduled flow across interface

This map shows the flow of electricity into and out of PJM.  The details are zone based showing the flow, interfaces, prices and the real-time load (MW).