System Maintenance

Interregional Data Map

Lake Erie Loop Flow
114.7 MW
12.12.2025 11:03:44 EDT
PJM Real-Time Load: 110,741 MW
 
PJM (MISO): $43.47
1,273 / 72 MW
MISO LMP: $43.58
PJM (DEOK): $45.04
Ohio Valley Electric Corporation (OVEC)
PJM (EKPC): $44.30
557 / 199 MW
Louisville Gas and Electric Company (LGEE)
PJM (AEP): $44.30
1,048 / 2,171 MW
Tennessee Valley Authority (TVA)
PJM (AEP): $44.30
49 / 0 MW
CPL Retail Energy West (CPLW)
PJM (AEP): $44.30
22 / 388 MW
Duke Energy
PJM (DOM): $44.30
1,911 / 46 MW
CPL Retail Energy East (CPLE)
PJM (Neptune): $49.23
660 / 660 MW
NYISO (Neptune): $49.20
PJM (Linden): $49.52
313 / 315 MW
NYISO (Linden): $49.56
PJM (Hudson): $49.93
660 / 660 MW
NYISO (Hudson): $49.95
PJM (NYISO): $49.12
1,840 / 2,064 MW
NYISO LMP: $49.19
LMP Values
(USD)
< $10
$70-100
$10-20
$100-200
$20-40
$200-500
$40-70
> $500
Interregional Map Legend the direction of actual flow Interregional Map Legend actual flow is from a lower interface price to
a higher interface price
Interregional Map Legend actual flow is from a higher interface price to
a lower interface price
Interregional Map Legend an interface without a corresponding
external interface price
Interregional Map Legend actual flow across interface Interregional Map Legend scheduled flow across interface

This map shows the flow of electricity into and out of PJM.  The details are zone based showing the flow, interfaces, prices and the real-time load (MW).