Capacity market capability of Energy Storage Resources

FERC directed PJM to file an initial brief in a paper hearing on the Capacity market capability of Energy Storage Resources. To that end, PJM is exploring alternatives to the status quo, called the “10 hour rule”. PJM is open to dialogue with any stakeholder group that proposes a method to calculate the capability of Energy Storage Resources in the Capacity market. PJM must file the initial brief on March 11, 2020.

Issue Details

Strategic Focus Area: Operations
Issue Status: Emerging
Stakeholder Body: Market Implementation Committee
Stakeholder Process Status: Education
Issue Catalyst: An Oct. 17, 2019 FERC ruling opened a paper hearing under Section 206 of the Federal Power Act to investigate whether the “10 hour rule” for calculating the capability of Energy Storage Resources in the Capacity market is just and reasonable (FERC calls this rule the “minimum run time requirement”, however it is not related to the PJM energy market parameter called “Minimum Run Time”). PJM requested, and FERC granted, an extension of time on the initial brief in the paper hearing until March 11, 2020.
Date Created: 10.17.2019
MC Approval Date:
Target Completion Date: 3.11.2020
Actual Completion Date:
FERC Filing(s): Yes
Agreement Change(s): Reliability Assurance Agreement
Manual Change(s): No
MC Annual Plan: 2020
Date Documents
2.24.2020 Meeting materials from the MIC Special Session - Capacity Market Capability of Energy Storage Resources meeting
Agenda  PDF
Agenda  DOC
Item 2 - Effective Load Carrying Capability (ELCC)  PDF
Item 3A - ESA PJM Capacity Qualification Method Proposal  PDF
Item 3B - Astrape Consulting 2019 - Capacity Value Storage in PJM  PDF
Item 4 - NRDC - Capacity Value of Storage  PDF
Item 5 - GlidePath Energy Storage Resources Capacity - Presentation  PDF
Item 5 - GlidePath Energy Storage Resources Capacity - Proposal  PDF
Item 6 - IMM Energy Storage Resource Capacity Determination  PDF
Item 7 - Procedural Timing & Effective Load Carrying Capability (ELCC) Next Steps  PDF
4.7.2020 Meeting materials from the CCSTF meeting
Agenda  PDF
Agenda  DOC
Item 2A - Problem Statement  PDF
Item 2B - Issue Charge  PDF
Item 3B - Group Kick Off Presentation  PDF
Item 3 - Draft Work Plan  PDF
Item 4 - Effective Load Carrying Capability  PDF
Item 5 - ELCC at other ISORTOs  PDF
Item 6A - ICAP UCAP  PDF
Item 6B - Transferring Capacity Interconnection Rights  PDF
Item 7 - Discussion  PDF
4.15.2020 Meeting materials from the MIC meeting
Draft Minutes - MIC - 3.11.2020  PDF
3.26.2020 Meeting materials from the MRC meeting
Agenda  PDF
Item 3B - ELCC for Intermittent Resources & Limited Duration Resources - Presentation  PDF
Item 3B - ELCC for Intermittent Resources & Limited Duration Resources - Problem Statement  PDF
Item 3B - ELCC for Intermittent Resources & Limited Duration Resources - Issue Charge  PDF
1.30.2020 Meeting materials from the MIC Special Session - Capacity Market Capability of Energy Storage Resources meeting
Item 2 - Work Plan  PDF
Item 2A - Procedural Timeline for Capacity Market Capability of Energy  PDF
Item 3 - Capacity Market Status Quo Rules for Energy Storage  PDF
Item 4 - Energy Storage Resources in the PJM Queue  PDF
Item 5 - Capability of Energy Storage Resources in Other ISORTOs  PDF
Item 6 - Energy Storage Resource Capability Market Capability Solution Options  PDF
3.4.2020 Meeting materials from the MIC Special Session meeting
Agenda  PDF
Agenda  DOC
Draft Minutes - Special MIC - 2.24.2020  PDF
Item 2 - PJM Motion to the FERC  PDF
Item 3A - Stakeholder Process Next Steps  PDF
Item 3B - Draft Workplan  PDF
Item 4 - Features of ELCC & Results of ELCC Studies  PDF