or  
  • Sign In
  • Sign In
  • Tools Sign In
  • Calendar
  • Menu
  • Sign In

PJM©

  • about pjm
  • training
  • committees & groups
  • planning
  • markets & operations
  • library

Planning

  • Service Requests
    • Serial Service Request Status
    • Cycle Service Request Status
    • Expedited Process / TC1 Classification
    • Interconnection Process Reform
    • Application & Forms
    • Planning Modeling Submissions (MOD-026, 027 & 032)
    • Generation Deactivations
      • Generator Deactivation Notices
  • Project Status & Cost Allocation
  • Competitive Planning Process
    • Redacted Public Proposals for Current and Closed Windows
    • Pre-Qualification for Designated Entity Status
  • RTEP Development
    • Stakeholder Process
      • Interconnection / Upgrade Requests
      • Regulators
      • Transmission Owners
    • Market Efficiency
    • Baseline Reports
    • Modeling Data
      • Multiregional Modeling Working Group Base Cases
  • Resource Adequacy Planning
    • Effective Load Carrying Capability (ELCC)
    • Reserve Requirement Development Process
    • Load Forecast Development Process
    • Resource Reports & Information
  • Planning Criteria
    • PJM Planning Criteria
    • Transmission Owner Planning Criteria
  • Design, Engineering & Construction
    • Transmission Owner Guidelines
    • Transmission Owner Engineering & Construction Standards
  • Interregional Planning
    • Eastern Interconnection Planning Collaborative (EIPC)
  • Home
  • Planning
  • Design, Engineering & Construction
  • Transmission Owner Engineering & Construction Standards
  • American Electric Power Technical Standards

American Electric Power Technical Standards


Date
Requirements for Connection of New Facilities or Changes to Existing Facilities Connected to the AEP Transmission System PDF
12.31.2024
Approved Contractors & Major Equipment Vendors PDF
12.2.2024
Interconnection Requirements PDF   12.31.2024
Independent Power Producer Option to Build Guidelines PDF
12.11.2023
Standards for Siting, Real Estate, ROW & Environmental Permitting for Interconnection Projects PDF   10.31.2022

6.5.0






Contact Information

Member Community

(866) 400-8980
(610) 666-8980
Member Relations

 

  • Follow us on:
  • InsideLines
  • follow us on facebook
  • rss feed
  • follow us on LinkedIn
  • follow us on Twitter
  • follow us on YouTube
  • follow us on Threads
  • Contact Us
  • Careers
  • Learning Center
  • Glossary
  • RSS Feeds
  • Site Map
  • PJM © 1999-2025 All rights reserved.
  • Legal and Privacy