Committees & Groups

Planning Committee

The Planning Committee (PC) is established under the Operating Agreement WEB | PDF and has the responsibility to review and recommend system planning strategies and policies as well as planning and engineering designs for the PJM bulk power supply system to assure the continued ability of the member companies to operate reliably and economically in a competitive market environment. Additionally, the PC makes recommendations regarding generating capacity reserve requirement and demand-side valuation factors.

Special Session Issues

Capacity Interconnection Rights for ELCC Resources
Critical Infrastructure Stakeholder Oversight
Storage as a Transmission Asset
Merchant Transmission & Offshore Wind (Suspended)

Planning Community

View all issues the PC is currently tracking.

Chair: Dave Souder
Secretary:
 Marilyn Jayachandran

During the meeting, if you are experiencing issues with connectivity or teleconference, please contact Meeting Support. For registration issues, contact PJM.

Roster PDF | Updates

 



Training Video

Community User Guide PDF

Date
Charter PDF
8.12.2016
Single Meeting Voting Proxy  
Long-Term Transmission Planning: Questions on the NOPR for Stakeholder Feedback DOC  

Meeting Materials

 4.12.2022 - Planning Committee

4.11.2022 Agenda  PDF
4.11.2022 Agenda  DOC
5.13.2022 Minutes  PDF
4.6.2022 Draft Minutes - PC - 3.8.2022  PDF
4.5.2022 Item 5 - 2022 Work Plan  PDF
4.5.2022 Item 6A - Manual 14F - Updates  PDF
4.5.2022 Item 6B - Manual 14F - Executive Summary  PDF
4.5.2022 Item 6C - Manual 14F - Redline  PDF
4.5.2022 Item 6D - Manual 14F - Preview  PDF
4.5.2022 Item 7A - Manual 21A - Presentation  PDF
4.5.2022 Item 7B - Manual 21A - Problem Statement  PDF
4.5.2022 Item 7C - Manual 21A - Issue Charge  PDF
4.5.2022 Item 7D - Manual 21A - Revisions - Executive Summary  PDF
4.5.2022 Item 7E - Manual 21A - Revision - Redline  PDF
4.5.2022 Item 7F - Manual 21A - Revision - Clean  PDF
4.5.2022 Item 8 - Interconnection Planning Subcommittee Charter  PDF
4.5.2022 Item 9A - Designated Entity Agreement (DEA) Update  PDF
4.5.2022 Item 9B - DEA - Problem Statement  PDF
4.5.2022 Item 9C - DEA Issue Charge  PDF
4.6.2022 Item 9D - Information Only - OA Definitions C- D  PDF
4.6.2022 Item 9E - Information Only - OA Schedule 6, Section 1.5   PDF
4.7.2022 Item 10A - Draft RSCS Charter - Current  PDF
4.7.2022 Item 10B - Draft RSCS Charter - Redline  PDF
4.5.2022 Item 11 - Capacity Interconnection Rights for ELCC Resources Update  PDF
4.5.2022 Item 12 - Generator Deliverability Proposal Update  PDF
4.5.2022 Item 13 - Interconnection Queue Status Update  PDF
4.5.2022 Item 14A - Informational Only - Manual 03 - Updates  PDF
4.5.2022 Item 14B - Informational Only - Manual 13 - Executive Summary  PDF
4.5.2022 Item 14C - Informational Only - Manual 03 - Revision 61 - Redline  PDF
4.5.2022 Item 14D - Informational Only - Manual 03 - Revision 61 - Preview  PDF
4.5.2022 Item 15 - Reliability Compliance Update  PDF
4.7.2022 Item 16A - Interconnection Customer Coalition Amendment to PJM Transition Proposal  PDF
4.7.2022 Item 16B - Dominion/PSEG/Orsted Friendly Amendment - follow up from 3.23.2022 MRC  PDF
4.11.2022 Item 16C - Information Only - PJM Tariff, Part VIII Site Control - Dominion/PSEG/Orsted Suggested Revision  PDF
4.11.2022 Item 16D - PJM Generation Interconnection Queue Reform PURPA Presentation  PDF
4.14.2022 Posting Score Card  XLS

 3.8.2022 - Planning Committee

3.8.2022 Agenda  PDF
3.8.2022 Agenda  DOC
2.23.2022 Item 3 - Draft Minutes - PC - 2.8.2022  PDF
4.14.2022 Minutes  PDF
3.1.2022 Item 4A - Deactivation Problem Statement - Education  PDF
3.1.2022 Item 4B - Problem Statement Deactivation - Process Timeline  PDF
3.1.2022 Item 4C - Issue Charge Deactivation Process - Process Timeline  PDF
3.1.2022 Item 4D - Information Only - Manual 14D - Revision 59 - Redline  PDF
3.1.2022 Item 4E - Information Only - Manual 14D - Revision 59 - Preview  PDF
3.1.2022 Item 4F - Information Only - OATT Section 113  PDF
3.1.2022 Item 4G - Information Only - OATT Attachment M Appendix  PDF
3.1.2022 Item 5A - Manual 14F Update  PDF
3.1.2022 Item 5B - Manual 14F - Executive Summary  PDF
3.4.2022 Item 5C - Manual 14F - Biennial Review - Redline  PDF
3.4.2022 Item 5D - Manual 14F - Biennial Review - Clean  PDF
3.1.2022 Item 6A - Manual 21A - Extension of Voluntary Unit Specific Data Submission - Presentation  PDF
3.1.2022 Item 6B - Manual 21A - Extension of Voluntary Unit Specific Data Submission - Problem Statement  PDF
3.1.2022 Item 6C - Manual 21A - Extension of Voluntary Unit Specific Data Submission - Issue Charge  PDF
3.1.2022 Item 6D - Manual 21A Revisions - Executive Summary  PDF
3.1.2022 Item 6E - Manual 21A Revisions - Redline  PDF
3.1.2022 Item 6F - Manual 21A Revisions - Clean  PDF
3.1.2022 Item 7 - Capacity Interconnection Rights for ELCC Resources Update  PDF
3.1.2022 Item 8 - Generator Deliverability Proposal - Revised Timeline  PDF
3.1.2022 Item 10A - Documenting the Appropriate UFLS Requirements Applicable to EKPC  PDF
3.1.2022 Item 10B - Information Only - EKPC Problem Statement  PDF
3.1.2022 Item 10C - Information Only - EKPC Issue Charge UFLS  PDF
3.1.2022 Item 11 - PJM Study - Illinois Clean Energy Jobs Act  PDF
3.1.2022 Item 12A - TTMS Charter  PDF
3.1.2022 Item 12B - TTMS Charter - Redline - V2  PDF
3.1.2022 Item 13 - PJM Reliability Compliance Update  PDF
3.11.2022 Posting Score Card  XLS

 2.8.2022 - Long Term Transmission Planning Reform Workshop - Session 1

 2.8.2022 - Planning Committee

2.4.2022 Agenda  PDF
2.4.2022 Agenda  DOC
3.11.2022 Minutes  PDF
1.18.2022 Item 3 - Draft Minutes - OC - 1.11.2022  PDF
2.1.2022 Item 4 - PJM Retiring Use of Weak Encryption of Voting  PDF
2.1.2022 Item 5 - Browserless API Two-Factor Authentication PKI Update  PDF
2.7.2022 Item 6A - IPRTF Transition Proposal Packages Presentation  PDF
2.1.2022 Item 6 - IPRTF Matrix - Version 6  XLS
2.1.2022 Item 6B - Amendment to PJM Transition Proposal IC Coalition  PDF
2.1.2022 Item 7A - TO/TOP Matrix Review - Version 16 - Second Read  PDF
2.1.2022 Item 7B - TO/TOP Matrix - Version 16 - Redline  XLS
2.2.2022 Item 8A - Deactivation Problem Statement Education  PDF
2.1.2022 Item 8B - Deactivation Process Timeline - Problem Statement  PDF
2.1.2022 Item 8C - Deactivation Process Timeline - Issue Charge  PDF
2.1.2022 Item 8D - Information Only - Manual 14D - Revision 59 - Redline  PDF
2.1.2022 Item 8E - Information Only - Manual 14D - Revision 59 - Preview  PDF
2.3.2022 Item 8F - Information Only - OATT Section 113  PDF
2.3.2022 Item 8G - Information Only - OATT Attachment M Appendix  PDF
2.1.2022 Item 9 - PC Special Session - Capacity Interconnection Rights for ELCC Resources  PDF
2.1.2022 Item 10 - Revised Generator Deliverability Proposal Development Timeline  PDF
2.2.2022 Item 11 - Queue Status Update  PDF
2.3.2022 Item 12 - New Jersey Offshore Wind SAA Agreement Filing  PDF
2.1.2022 Item 14 - Reliability Compliance Update  PDF
1.12.2022 TOA-AC Notice of Transmission Owners Consultation with the MC  PDF
2.10.2022 Posting Score Card  XLS

 1.11.2022 - Planning Committee

1.10.2022 Agenda  PDF
1.10.2022 Agenda  DOC
2.10.2022 Minutes  PDF
12.21.2021 Item 3 - Draft Minutes - PC - 12.14.2021  PDF
1.4.2022 Item 4 - 2022 Work Plan  PDF
1.11.2022 Item 5A - IPRTF Presentation  PDF
1.4.2022 Item 5B - IPRTF Matrix - Version 5  XLS
1.6.2022 Item 5B - IPRTF Matrix - Version 6  XLS
1.6.2022 Item 6 - IPRTF/PC First Read Transition - Presentation  PDF
1.5.2022 Item 7A - Deactivation Problem Statement Education  PDF
1.5.2022 Item 7B - Problem Statement Deactivation Process Timeline  PDF
1.4.2022 Item 7C - Deactivation Process Timeline - Issue Charge  PDF
1.5.2022 Item 7D - Information Only - Manual 14D - Version 59 - Redline  PDF
1.5.2022 Item 7E - Information Only - Manual 14D - Version 59 - Preview  PDF
1.4.2022 Item 7F - Information Only - Informational Only - OATT Section 113  PDF
1.4.2022 Item 7G - Information Only - OATT Attachment M - Appendix  PDF
1.4.2022 Item 8A - TO/TOP Matrix Review - Version 16  PDF
1.4.2022 Item 8B - Draft TO/TOP Matrix - Version 16 - Redline  XLS
1.4.2022 Item 9 - Capacity Interconnection Rights for ELCC Resources  PDF
1.5.2022 Item 10 - PC Transmission Planning Resilience Update  PDF
1.5.2022 Item 11 - Attachment M-3 Update  PDF
1.11.2022 Item 11B - M-3 Action Items  XLS
1.4.2022 Item 12 - Reliability Compliance Update  PDF
1.10.2022 Item X - PJM Retiring Use of Weak Encryption for Voting  PDF
1.4.2022 Informational Only - 2021/2022 Long-Term Window 1 - Carbon Impact of Selected Market Efficiency Projects  PDF
1.12.2022 Posting Score Card  XLS

 11.2.2021 - Planning Committee

11.1.2021 Agenda  PDF
11.1.2021 Agenda  DOC
12.17.2021 Minutes  PDF
10.28.2021 Item 3 - Draft Minutes - PC - 10.5.2021  PDF
10.26.2021 Item 4 - Charter  PDF
10.26.2021 Item 5 - 2021-2022 Winter Weekly Reserve Target  PDF
10.26.2021 Item 6A - Manual 14B Update  PDF
10.26.2021 Item 6B - Manual 14B - Executive Summary  PDF
10.26.2021 Item 6C - Manual 14B - Biennial Review - Redline  PDF
10.26.2021 Item 6D - Manual 14B - Biennial Review - Clean  PDF
10.26.2021 Item 6E - PJM M3 EOL  PDF
10.26.2021 Item 7A - Manual 19 - Changes  PDF
10.26.2021 Item 7B - Manual 19 - Executive Summary  PDF
10.26.2021 Item 7C - Manual 19 - Redline  PDF
10.26.2021 Item 7D - Manual 19 - Clean  PDF
11.2.2021 Item 8A - Manual 14F - Revision 8 - Changes  PDF
11.2.2021 Item 8B - Manual 14F - Revision 8 - Executive Summary  PDF
11.2.2021 Item 8C - Manual 14F - Revision 8 - Redline  PDF
11.2.2021 Item 8D - Manual 14F - Revision 8 - Clean  PDF
10.26.2021 Item 9A - Generator Deliverability Test Modifications - Manuals 14A & 14B  PDF
10.26.2021 Item 9B - Generator Deliverability - Problem Statement  PDF
10.26.2021 Item 9C - Generator Deliverability - Issue Charge  PDF
10.26.2021 Item 9D - Executive Summary  PDF
10.26.2021 Item 9E - Manual 14A Update - Redline  PDF
10.26.2021 Item 9F - Manual 14A Update - Clean  PDF
10.26.2021 Item 9G - Manual 14B - Generator Deliverability Updates - Redline  PDF
10.26.2021 Item 9H - Manual 14B - Generator Deliverability Updates - Clean  PDF
10.26.2021 Item 9I - 2020 Light Load Average Temperatures  XLS
10.26.2021 Item 10 - Queue Status Update  PDF
10.26.2021 Item 11 - PC-CIR Update  PDF
10.26.2021 Item 13 - PJM Reliability Compliance Update  PDF
11.3.2021 Posting Score Card  XLS

 10.5.2021 - Planning Committee

10.4.2021 Agenda  PDF
10.4.2021 Agenda  DOC
11.3.2021 Minutes  PDF
9.28.2021 Item 3 - Draft Minutes - PC - 8.31.2021  PDF
9.28.2021 Item 4 - Work Plan  PDF
9.28.2021 Item 5 - 2021 RRS Preliminary Assessment Results  PDF
10.1.2021 Item 5B - 2021 PJM Reserve Requirement Study  PDF
10.4.2021 Item X - 2021/2022 Winter Weekly Reserve Target  PDF
10.1.2021 Item 6A - Manual 14B - Update  PDF
10.1.2021 Item 6B - Manual 14B - Executive Summary  PDF
10.5.2021 Item 6C - Manual 14B - Biennial Review - Redline - Post Meeting  PDF
10.5.2021 Item 6D - Manual 14B - Biennial Review - Clean - Post Meeting  PDF
9.28.2021 Item 7A - Manual 19 - Changes  PDF
9.28.2021 Item 7B - Manual 19 - Executive Summary  PDF
9.28.2021 Item 7C - Manual 19 - Redline  PDF
9.28.2021 Item 7D - Manual 19 - Clean  PDF
10.4.2021 Item 8A - Manual 14F - Changes  PDF
10.4.2021 Item 8B - Manual 14F - Executive Summary  PDF
10.4.2021 Item 8C - Manual 14F - Redline  PDF
10.4.2021 Item 8D - Manual 14F - Clean  PDF
9.30.2021 Item 9A - Generator Deliverability Test Modifications - Manual 14A & 14B Update  PDF
9.30.2021 Item 9B - Manual 14A & 14B - Executive Summary  PDF
9.28.2021 Item 9C - Manual 14A Update - Redline (Corrected)  PDF
9.28.2021 Item 9D - Manual 14A Update - Clean  PDF
9.28.2021 Item 9E - Manual 14B - Generator Deliverability Updates - Redline  PDF
9.28.2021 Item 9F - Manual 14B - Generator Deliverability Updates - Clean  PDF
9.28.2021 Item 9G - 2020 Light Load Average Temperature  XLS
9.28.2021 Item 10 - Market Efficiency Process Enhancement Carbon Impact Reporting  PDF
10.5.2021 Item 11 - October PC - Capacity Interconnection Rights for ELCC Resources - Post Meeting  PDF
9.28.2021 Item 13 - Reliability Compliance Update  PDF
9.30.2021 Informational Only - Manual 03 - Revision 60 - Executive Summary  PDF
9.30.2021 Informational Only - Manual 03 - Revision 60 - Presentation  PDF
9.30.2021 Informational Only - Manual 03 - Revision 60 - Redline  PDF
10.6.2021 Posting Score Card  XLS

 9.30.2021 - Interconnection Policy Workshops - Session 6

 9.14.2021 - PC Special Session - State Agreement Approach

 6.24.2021 - Interconnection Policy Workshop - Session 2

 5.18.2021 - Interconnection Policy Workshop - Session 1

 5.11.2021 - Planning Committee

5.4.2021 Agenda  PDF
5.4.2021 Agenda  DOC
6.9.2021 Minutes  PDF
4.12.2021 Item 3 - Draft Minutes - PC - 20210406  PDF
5.4.2021 Item 4A - Interconnection Construction Service Agreement (ICSA) - Superseding Language & Automatic Termination Provision  PDF
5.4.2021 Item 4B - ICSA Superseding Language & Automatic Termination - Problem Statement  PDF
5.4.2021 Item 4C - ICSA Superseding Language & Automatic Termination - Issue Charge  PDF
5.4.2021 Item 4D - Informational Only - OATT Attachment P A2 14.1  PDF
5.4.2021 Item 4E - Information Only - OATT Attachment P - ICSA  PDF
5.4.2021 Item 5A - New Service Req Deficiency - Review Requirement  PDF
5.4.2021 Item 5B - New Service Req Deficiency - Problem Statement  PDF
5.4.2021 Item 5C - New Service Req Deficiency - Issue Charge  PDF
5.4.2021 Item 5D - Informational Only - OATT 36.1  PDF
5.4.2021 Item 5E - Informational Only - OATT 110.1  PDF
5.4.2021 Item 5F - Informational Only - OATT 111.1  PDF
5.4.2021 Item 5G - Informational Only - OATT 112.1  PDF
5.4.2021 Item 5H - Informational Only - OATT 112.1A  PDF
5.4.2021 Item 5I - Informational Only - OATT 112B.1  PDF
5.4.2021 Item 5J - Informational Only - OATT 204.2  PDF
5.4.2021 Item 5J - Informational Only - OATT L M N Definitions  PDF
5.4.2021 Item 6A - Conforming Language - Presentation  PDF
5.4.2021 Item 6B - Manual 14B Conforming Language - Executive Summary  PDF
5.4.2021 Item 6C - Manual 14F Conforming Language - Executive Summary  PDF
5.4.2021 Item 6D - Manual 14B Conforming Language - Clean  PDF
5.4.2021 Item 6E - Manual 14B Conforming Language - Redline  PDF
5.4.2021 Item 6F - Manual 14F Conforming Language - Clean  PDF
5.4.2021 Item 6G - Manual 14F Conforming Language - Redline  PDF
5.4.2021 Item 7A - Manual 21 - Update 15  PDF
5.4.2021 Item 7B - Manual 21 Revision 15 - Executive Summary  PDF
5.4.2021 Item 7C - Manual 21 Revision 15 - Redline  PDF
5.4.2021 Item 7D - Manual 21 Revision 15 - Preview  PDF
5.4.2021 Item 8A - 2021 RSS Assumptions  PDF
5.4.2021 Item 8B - RSS Assumptions Letter 2021 - Redline  PDF
5.4.2021 Item 8C - RSS Assumptions Letter 2021 - Clean  PDF
5.4.2021 Item 9A - Critical Infrastructure Stakeholder Oversight Update  PDF
5.4.2021 Item 9B - Informational Only - CISO March MRC First Read Tariff OA Revisions  PDF
5.4.2021 Item 9C - Informational Only - CISO March MRC Second Read Tariff OA Revisions  PDF
5.4.2021 Item 10 - May PC CIR Update  PDF
5.4.2021 Item 11 - Interconnection Process Reform Task Force Update  PDF
5.10.2021 Item 12 - FERC Order Rejecting ELCC  PDF
5.4.2021 Item 13 - PHI Transmission Facility Rating Change  PDF
5.4.2021 Item 14 - TSS Update  PDF
5.4.2021 Item 15 - PJM Reliability Compliance Update  PDF
4.16.2021 Information Only - Notice of PJM Transmission Owners Consultation with the Members Committee - Regarding Proposed Revisions to the PJM Tariff  PDF
5.13.2021 PC Posting Score Card  XLS

 4.6.2021 - Planning Committee

4.5.2021 Agenda  PDF
4.5.2021 Agenda  DOC
5.13.2021 Minutes  PDF
3.15.2021 Item 3 - Draft Minutes - PC - 3.9.2021  PDF
3.30.2021 Item 5 - PC Work Plan  PDF
3.30.2021 Item 6A - Capacity Interconnection Rights (CIR) for Effective Load Carrying Capability (ELCC) Resources  PDF
3.30.2021 Item 6B - CIR - Problem Statement  PDF
3.30.2021 Item 6C - CIR - Issue Charge - Redline  PDF
3.30.2021 Item 6D - CIR - Issue Charge - Clean  PDF
3.31.2021 Item 7A - Interconnection Process Reform - Presentation  PDF
3.31.2021 Item 7B - Interconnection Process Reform - Problem Statement  PDF
4.5.2021 Item 7C - Interconnection Process Reform - Issue Charge  PDF
4.1.2021 Item 8A - ICSA Superseding Language & Auto Termination  PDF
4.1.2021 Item 8B - Problem Statement  PDF
4.1.2021 Item 8C - Issue Charge  PDF
4.1.2021 Item 8D - Informational Only - OATT Attachment P A2.14.1  PDF
4.1.2021 Item 8E - Informational Only - OATT Attachment P - Interconnection Construction Service Agreement  PDF
4.1.2021 Item 8F - PS Proposed Friendly Amendment - Informational Only - OATT Attachment P A2.14.1  PDF
3.31.2021 Item 9A - MEPETF - Conforming Language - Presentation  PDF
3.31.2021 Item 9B - MEPETF - Manual 14B Conforming Language - Executive Summary  PDF
3.31.2021 Item 9C - MEPETF - Manual 14F Conforming Language - Executive Summary  PDF
3.31.2021 Item 9D - MEPETF - Manual 14B Conforming Language - Clean  PDF
3.31.2021 Item 9E - MEPETF - Manual 14B Conforming Language - Redline  PDF
3.31.2021 Item 9F - MEPETF - Manual 14B Conforming Language - Clean  PDF
3.31.2021 Item 9G - MEPETF - Manual 14F - Conforming Language - Redline  PDF
4.1.2021 Item 10A - New Service Requests - Deficiency Review Requirements  PDF
4.1.2021 Item 10B - New Service Requirement Deficiency - Problem Statement  PDF
4.1.2021 Item 10C - New Service Requirement Deficiency - Issue Charge  PDF
4.6.2021 Item 10D - Informational Only - OATT 36.1  PDF
4.5.2021 Item 10E - Informational Only - OATT 110.1  PDF
4.5.2021 Item 10F - Informational Only - OATT 111.1  PDF
4.5.2021 Item 10G - Informational Only - OATT 112.1  PDF
4.5.2021 Item 10H - Informational Only - OATT 112.1A  PDF
4.5.2021 Item 10I - Informational Only - OATT 112B.1  PDF
4.5.2021 Item 10J - Informational Only - OATT 204.2  PDF
3.31.2021 Item 11A - Manual 21 - Update 15  PDF
3.31.2021 Item 11B - Manual 21 - Revision 15 - Executive Summary  PDF
3.31.2021 Item 11C - Manual 21 - Revision 15 - Redline  PDF
3.31.2021 Item 11D - Manual 21 - Revision 15 - Preview  PDF
3.30.2021 Item 12 - Effective Load Carrying Capability Conforming Manual Language Changes  PDF
3.30.2021 Item 13 - Reliability Compliance Update  PDF
4.1.2021 Item 14A - Posting Timeline Trial  PDF
4.1.2021 Item 14B - Posting Timeline Trial - Supporting Documentation  PDF
3.30.2021 Item 15 - Emerging Technologies Forum Survey  PDF
3.31.2021 Informational Posting - Manual 03 Presentation - Revision 59  PDF
3.31.2021 Informational Posting - Executive Summary Manual 03 - Revision 59  PDF
3.31.2021 Informational Posting - Manual 03 - Revision 59 - Redline  PDF
4.5.2021 Informational Posting - Manual 03 Attachment E Automatic Sectionalizing Schemes Pending Approval & Recent Changes  PDF
4.7.2021 Posting Score Card  XLS

 3.9.2021 - Planning Committee

3.5.2021 Agenda  PDF
3.5.2021 Agenda  DOC
4.7.2021 Minutes  PDF
2.12.2021 Item 3 - Draft Minutes - PC - 2.9.2021  PDF
3.2.2021 Item 4A - Capacity Interconnection Rights for ELCC Resources  PDF
3.2.2021 Item 4B - CIR - Problem Statement - Redline  PDF
3.2.2021 Item 4C - CIR - Issue Charge - Redline  PDF
3.2.2021 Item 4D - CIR - Problem Statement - Clean  PDF
3.2.2021 Item 4E - CIR - Issue Charge - Clean  PDF
3.8.2021 Item 5 - Interconnection Process Reform Presentation  PDF
3.5.2021 Item 5A - Interconnection Process Reform - Problem Statement  PDF
3.5.2021 Item 5B - Interconnection Process Reform - Issue Charge  PDF
3.2.2021 Item 6A - New Service Requests - Deficiency Review Requirements  PDF
3.2.2021 Item 6B - New Service Requests - Review Period - Problem Statement  PDF
3.2.2021 Item 6C - New Service Requests Review Period - Issue Charge  PDF
3.2.2021 Item 6D - Informational Only - Draft OATT 36.1  PDF
3.2.2021 Item 6E - Informational Only - Draft OATT 110.1  PDF
3.2.2021 Item 6F - Informational Only - Draft OATT 111.1  PDF
3.2.2021 Item 6G - Informational Only - Draft OATT 112.1  PDF
3.2.2021 Item 6H - Informational Only - Draft OATT 112.1A  PDF
3.2.2021 Item 6I - Informational Only - Draft OATT 112B.1  PDF
3.2.2021 Item 6J - Informational Only - Draft OATT 204.2  PDF
3.2.2021 Item 7A - Interconnection Construction Service Agreement - Superseding Language & Auto Termination  PDF
3.2.2021 Item 7B - ICSA - Superseding Language & Automatic Termination Provision - Problem Statement  PDF
3.2.2021 Item 7C - ICSA - Superseding Language & Automatic Termination Provision - Issue Charge  PDF
3.2.2021 Item 7D - Informational Only - OATT Attachment P.A2.14.1  PDF
3.2.2021 Item 7E - Informational Only - OATT Attachment P - ISCA  PDF
3.3.2021 Item 8 - Attachment M-3 Update  PDF
3.2.2021 Item 9 - PJM Reliability Compliance Update  PDF
3.10.2021 Posting Score Card  XLS

 12.11.2020 - Interconnection Process Workshop 2 - Stakeholder Presentations

12.8.2020 Agenda  PDF
12.8.2020 Agenda  DOC
12.8.2020 Draft Minutes - PC Process Workshop - 10.30.2020  PDF
12.8.2020 Item 3A - Deral Danis - Queue Workshop ConnectGen  PDF
12.8.2020 Item 3B - Aaron Vander Vorst - Enel PJM Interconnection Reforms  PDF
12.8.2020 Item 3C - Deepesh Rena - Apex Clean Energy  PDF
12.8.2020 Item 3D - Takis Laios - PJM Interconnection Queue Initiative - AEP Challenges & Improvements  PDF
12.9.2020 Item 3E - Geoffrey Underwood - Prospect14  PDF
12.8.2020 Item 3F - Amber Thomas - Exelon Interconnection Challenges  PDF
12.8.2020 Item 3G - Wonbae Choi - PJM Interconnection Workshop  PDF
12.8.2020 Item 3H - John Soininen - Vepser  PDF
12.8.2020 Item 3I - Ken Foladare - Geenex  PDF
12.8.2020 Item 3J - Tom Schmidt - Establishing Retail Electric Service within the Interconnection Process  PDF
12.8.2020 Item 3K - Mike Borgatti - AWEA Comments  PDF
12.8.2020 Item 3L - Valerie Saveri - PPL Electric  PDF
12.8.2020 Item 3M - Jeff Whitehead - Easter Generation  PDF
12.8.2020 Item 3N - Cullen Howe - Sustainable FERC  PDF
12.8.2020 Item 3O - Mike Jacobs - PJM Planning LGIP  PDF
12.8.2020 Item 3P - Brook Knodel - PJM Interconnection Process Challenges & Possible Improvements  PDF
12.8.2020 Item 3Q - Emil Avram - PJM Interconnection Process Dev Power - Gen Comments  PDF
12.8.2020 Item 3R - Arash Ghodsian - EDFR Queue Slides  PDF
12.8.2020 Item 3S - John Brodbeck - EDPR Interconnection  PDF
12.8.2020 Item 3T - Iker Chocarro - RWE PJM Interconnection Workshop  PDF
12.11.2020 Item 3U - Comments from BayWa Solar Projects LLC  PDF

 10.30.2020 - Interconnection Process Workshop 1 - A Review of the Interconnection Process

 10.20.2020 - PC Special Session - Critical Infrastructure Stakeholder Oversight

 10.9.2020 - PC Special Session - Storage as a Transmission Asset

 9.22.2020 - PC Special Session - Post ISA Education Session

 8.17.2020 - PC Special Session - Pre Queue Education Session

 7.7.2020 - Planning Committee

6.30.2020 Agenda  PDF
6.30.2020 Agenda  DOC
8.5.2020 Minutes  PDF
6.8.2020 Item 3 - Draft Minutes - PC - 6.2.2020  PDF
6.30.2020 Item 4 - Work Plan  PDF
7.7.2020 Item 5A - Phasor Measurement Unit (PMU) Placement Plan in RTEP Planning Process  PDF
6.30.2020 Item 5B - Problem Statement - RTEP PMU Placement  PDF
6.30.2020 Item 5C - Issue Charge - RTEP PMU Placement  PDF
7.6.2020 Item 5D - Solution Proposal - Phasor Measurement Unit (PMU) Placement Plan in RTEP Planning Process  PDF
7.6.2020 Item 5E - Manual 14B - Revision 47 - Executive Summary  PDF
7.2.2020 Item 6 - PJM Load Model Selection for 2020 RRS  PDF
7.2.2020 Item 7A - Order 845 Second Compliance FIling Manual 14A, 14B & 14G Changes  PDF
7.2.2020 Item 7B - Executive Summary Manual Changes M14A Revision 27  PDF
7.2.2020 Item 7C - M14A New Services Queue Process - Clean  PDF
7.2.2020 Item 7D - M14A New Services Queue Process - Redline  PDF
7.2.2020 Item 7E - Executive Summary Manual Changes M14B Revision 47  PDF
7.2.2020 Item 7F - M14B PJM Region Transmission Planning Process - Clean  PDF
7.2.2020 Item 7G - M14B PJM Region Transmission Planning Process - Redline  PDF
7.2.2020 Item 7H - Executive Summary Manual Changes M14G Revision 5  PDF
7.2.2020 Item 7I - M14G Generation Interconnection Requests - Clean  PDF
7.2.2020 Item 7J - M14G Generation Interconnection Request - Redline  PDF
7.2.2020 Item 8 - Attachment M-3 Update  PDF
7.7.2020 Item 9 - Recent Load Impacts  PDF
6.30.2020 Item 10 - Manual 14C - Update  PDF
6.30.2020 Item 11 - State Agreement Approach  PDF
6.30.2020 Item 12 - MEPETF Phase 3 Package C1 Capacity Window  PDF
7.6.2020 Item 13 - Immediate-Need Reliability Update  PDF
6.30.2020 Item 14 - Reliability Compliance Update  PDF
7.6.2020 Item 17 - Update on CCSTF  PDF
7.9.2020 Posting Score Card  XLS

 6.19.2020 - PC Special Session - Critical Infrastructure Stakeholder Oversight

 6.2.2020 - Planning Committee

6.1.2020 Agenda  PDF
6.1.2020 Agenda  DOC
7.9.2020 Minutes  PDF
6.1.2020 Item 3 - Draft Minutes - PC - 5.12.2020  PDF
5.27.2020 Item 4A - Manuals 14A / 14E / 14G Changes  PDF
5.27.2020 Item 4B - Manual 14A - Revision 27 - Executive Summary Manual Changes  PDF
5.27.2020 Item 4C - Manual 14A - Preview - Clean  PDF
5.27.2020 Item 4D - Manual 14A - Redline  PDF
5.27.2020 Item 4E - Manual 14E - Revision 8 - Executive Summary Manual Changes  PDF
5.27.2020 Item 4F - Manual 14E - Preview - Clean  PDF
5.27.2020 Item 4G - Manual 14E - Redline  PDF
5.27.2020 Item 4H - Manual 14G - Revision 5 - Executive Summary Manual Changes  PDF
5.27.2020 Item 4I - Manual 14G - Preview - Clean  PDF
5.27.2020 Item 4J - Manual 14G - Redline  PDF
5.27.2020 Item 5A - 2020 Reserve Requirement Study - Assumptions  PDF
5.27.2020 Item 5B - Reserve Requirement Study Assumptions Letter - 2020 - Clean  PDF
5.27.2020 Item 5C - Reserve Requirement Study Assumptions Letter - 2020 - Redline  PDF
5.27.2020 Item 6A - Phasor Measurement Unit RTEP  PDF
5.27.2020 Item 6B - RTEP Phasor Measurement Unit - Problem Statement  PDF
5.27.2020 Item 6C - RTEP Phasor Measurement Unit - Issue Charge  PDF
5.27.2020 Item 6D - PC Solution Proposal - RTEP Phasor Measurement Unit Placement  PDF
5.28.2020 Item 7 - COVID-19 Impacts & Load Forecast  PDF
6.2.2020 Item 7A - Economic Forecast Update - Post Meeting  PDF
5.27.2020 Item 8 - FERC Transmission Orders Requiring Reallocations & Refunds  PDF
6.1.2020 Item 9 - Order 845  PDF
5.27.2020 Item 10 - Competitive Planner  PDF
6.3.2020 Posting Score Card  XLS

 5.12.2020 - Planning Committee

5.8.2020 Agenda  PDF
5.8.2020 Agenda  DOC
6.3.2020 Minutes  PDF
4.24.2020 Item 3 - Draft Minutes - PC - 4.14.2020  PDF
5.5.2020 Item 4A - Storage as a Transmission & Asset - Problem Statement - Clean  PDF
5.5.2020 Item 4B - Storage as a Transmission & Asset - Problem Statement - Redline  PDF
5.5.2020 Item 4C - Storage as a Transmission & Asset - Issue Charge - Clean  PDF
5.5.2020 Item 4D - Storage as a Transmission & Asset - Issue Charge - Redline  PDF
5.5.2020 Item 5A - MEPETF Phase 3 - Presentation  PDF
5.5.2020 Item 5B - MEPETF Problem Statement Matrix  XLS
5.7.2020 Item 6A - Critical Infrastructure Stakeholder Oversight - Updated Redline Issue Charge - Exelon   PDF
5.7.2020 Item 6B - Critical Infrastructure Stakeholder Oversight - Alternate Redline Issue Charge - DC OPC  PDF
5.11.2020 Item 7 - Reference 03.10.2020 Meeting - PC Synchrophasor Informational Update  PDF
5.7.2020 Item 7A - PMU RTEP  PDF
5.7.2020 Item 7B - PC Problem Statement - RTEP PMU Placement  PDF
5.7.2020 Item 7C - PC Issue Charge - RTEP PMU Placement  PDF
5.7.2020 Item 7D - PC Solution Proposal - RTEP PMU Placement  PDF
5.5.2020 Item 8A - 2020 RRS Assumptions  PDF
5.5.2020 Item 8B - RRS Assumptions Letter 2020 - Clean  PDF
5.5.2020 Item 8C - RRS Assumptions Letter 2020 - Redline  PDF
5.6.2020 Item 9A - Manuals 14A / 14E / 14G Changes  PDF
5.6.2020 Item 9B - Manual 14A - Revision 27 - Executive Summary Manual Changes  PDF
5.6.2020 Item 9C - Manual 14A Preview - Clean  PDF
5.6.2020 Item 9D - Manual 14A - Redline  PDF
5.6.2020 Item 9E - Manual 14E - Revision 8 - Executive Summary Manual Changes  PDF
5.6.2020 Item 9F - Manual 14E Preview - Clean  PDF
5.6.2020 Item 9G - Manual 14E - Redline  PDF
5.6.2020 Item 9H - Manual 14G - Revision 5 - Executive Summary Manual Changes  PDF
5.6.2020 Item 9I - Manual 14G Preview - Clean  PDF
5.6.2020 Item 9J - Manual 14G - Redline  PDF
5.7.2020 Item 10 - Exelon TO Planning Criteria  PDF
5.7.2020 Item 11 - AMPT Planning Assumption Update  PDF
5.5.2020 Item 12 - Dominion Planning Criteria Updates  PDF
5.8.2020 Item 13 - FERC Orders on Transmission  PDF
5.5.2020 Item 14 - TSS Update  PDF
5.5.2020 Item 15 - RC Update  PDF
5.7.2020 Item 16 - COVID-19 Load Impact Update  PDF
5.7.2020 Informational Only - PJM MOD-032 General Summary  PDF
5.6.2020 Informational Only - PJM Queue Status Update  PDF
5.8.2020 Informational Only - Proposed Amendments to Attachment M-3 of the PJM Tariff  PDF
5.14.2020 Posting Score Card  XLS

 3.10.2020 - Planning Committee

3.4.2020 Agenda  PDF
3.4.2020 Agenda  DOC
3.3.2020 Safety Procedure Slide  PDF
4.15.2020 Minutes  PDF
2.6.2020 Item 3 - Draft Minutes - PC - 2.4.2020  PDF
3.3.2020 Item 4A - Manual 22 - Revision 18  PDF
3.3.2020 Item 4B - Manual 22 - Revision 18 - Executive Summary  PDF
3.3.2020 Item 4C - Manual 22 - Revision 18 - Redline  PDF
3.3.2020 Item 4D - Manual 22 - Revision 18 - Preview  PDF
3.3.2020 Item 5A - Manual 14A / 14E / 14G - Changes  PDF
3.3.2020 Item 5B - Manual 14A - Revision 26 - Executive Summary Manual Changes  PDF
3.3.2020 Item 5C - Manual 14A - Revision 26 - Clean  PDF
3.3.2020 Item 5D - Manual 14A - Revision 26 - Redline  PDF
3.3.2020 Item 5E - Manual 14A - Revision 7 - Executive Summary Manual Changes  PDF
3.3.2020 Item 5F - Manual 14E - Revision 7 - Redline  PDF
3.3.2020 Item 5G - Manual 14E - Revision 7 - Clean  PDF
3.3.2020 Item 5H - Manual 14G - Revision 4 - Executive Summary Manual Changes  PDF
3.3.2020 Item 5I - Manual 14G - Revision 4 - Redline  PDF
3.3.2020 Item 5J - Manual 14G - Revision 4 - Clean  PDF
3.3.2020 Item 6A - MEPETF Phase 3 - Presentation  PDF
3.3.2020 Item 6B - MEPETF Problem Statement Matrix  XLS
3.3.2020 Item 7 - FERC Order 845 Update  PDF
3.4.2020 Item 8 - ELCC for PC  PDF
3.10.2020 Item 8 - Effective Load Carrying Capability Issue Charge - Post Meeting  PDF
3.6.2020 Item 9 - Storage as a Transmission Asset  PDF
3.3.2020 Item 11 - Reliability Compliance Update  PDF
3.4.2020 Item 12A - PC Synchrophasor Informational Update  PDF
3.4.2020 Item 12B - Resilience  PDF
3.11.2020 Posting Score Card  XLS

 2.4.2020 - Planning Committee

1.31.2020 Agenda  PDF
1.31.2020 Agenda  DOC
1.30.2020 2020 Safety Procedure  PDF
3.11.2020 Minutes  PDF
1.14.2020 Item 3 - Draft Minutes - PC - 1.7.2019  PDF
1.29.2020 Item 4 - 2020 Annual Meeting  PDF
1.29.2020 Item 5A - TO/TOP Matrix - Revision 15 - Committee Updates  PDF
1.29.2020 Item 5B - Draft PJM TO/TOP Matrix - Revision 14  PDF
1.29.2020 Item 5C - Draft PJM TO/TOP Matrix - Revision 14  XLS
2.4.2020 Item 6 - MEPETF - Phase 3 - Presentation  PDF
2.4.2020 Item 6B - MEPETF - Phase 3 Problem Statement Matrix - Post Meeting  XLS
1.30.2020 Item 7A - Manual 22 Update  PDF
1.30.2020 Item 7B - Manual 22 Update - Executive Summary  PDF
1.30.2020 Item 7C - Manual 22 Revision 18 - Redline  PDF
1.30.2020 Item 7D - Manual 22 Revision 18 - Clean  PDF
2.4.2020 Item 8A - Order 845 - PC Manual Updates  PDF
1.30.2020 Item 8B - Manual 14A - Revision 26 - Executive Summary - Manual Changes  PDF
1.30.2020 Item 8C - Manual 14A - Revision 26 - Redline  PDF
1.30.2020 Item 8D - Manual 14A - Revision 26 - Clean  PDF
1.30.2020 Item 8E - Manual 14E - Revision 7 - Executive Summary - Manual Changes  PDF
1.30.2020 Item 8F - Manual 14E - Revision 7 - Redline  PDF
1.30.2020 Item 8G - Manual 14E - Revision 7 - Clean  PDF
1.30.2020 Item 8H - Manual 14G - Revision 4 - Executive Summary - Manual Changes  PDF
1.30.2020 Item 8I - Manual 14G - Revision 4 - Redline  PDF
1.30.2020 Item 8J - Manual 14G - Revision 4 - Clean  PDF
1.29.2020 Item 9A - Manual 12 Updates  PDF
1.29.2020 Item 9B - Manual 12 - Attachment F - Planning Eligibility Criteria - Redlines  PDF
1.30.2020 Item 10 - Designated Entity Design Standard Bi-Annual Review Updates  PDF
1.29.2020 Item 11 - TPL-007-3 GMD Presentation  PDF
1.29.2020 Item 12 - Critical Infrastructure Stakeholder Oversight  PDF
1.29.2020 Item 13 - Reliability Compliance Update  PDF
2.5.2020 Posting Score Card  XLS

 11.14.2019 - Planning Committee

11.7.2019 Agenda  PDF
11.7.2019 Agenda  DOC
12.16.2019 Minutes  PDF
11.12.2019 Item 3 - Draft Minutes - PC - 10.17.2019  PDF
11.7.2019 Item 4 - PC Charter  PDF
11.8.2019 Item 5A - Critical Infrastructure Stakeholder Oversight - PS - Redline  PDF
11.8.2019 Item 5B - Critical Infrastructure Stakeholder Oversight - PS - Clean  PDF
11.8.2019 Item 5C - Critical Infrastructure Stakeholder Oversight - IC - Redline  PDF
11.8.2019 Item 5D - Critical Infrastructure Stakeholder Oversight - IC - Clean  PDF
11.14.2019 Item 5E - Critical Infrastructure - Exelon Proposed Friendly Amendment  PDF
11.7.2019 Item 6A - 2019 Changes to RS Charter  PDF
11.7.2019 Item 6B - RS Charter - Redline  PDF
11.7.2019 Item 6C - RS Charter - Clean  PDF
11.11.2019 Item 7A - Competitive Transmission Proposal Fee - Presentation  PDF
11.7.2019 Item 7B - Executive Summary - Proposal Fee  PDF
11.7.2019 Item 7C - Proposal Fee - Draft OA Language - Redline  PDF
11.8.2019 Item 8A - Presentation - Cost Commitment  PDF
11.7.2019 Item 8B - Executive Summary - Cost Commitment - Manual 14F  PDF
11.7.2019 Item 8C - Manual 14F Language - Cost Commitment  PDF
11.11.2019 Item 8D - PJM Manual 14F Revisions - Monitoring Analytics Comments  PDF
11.7.2019 Item 9A - Manual 19 - Changes  PDF
11.7.2019 Item 9B - Manual 19 - Executive Summary - Manual Changes  PDF
11.7.2019 Item 9C - Manual 19 - Revision 34 - Redline  PDF
11.7.2019 Item 9D - Manual 19 - Revision 34 - Preview  PDF
11.8.2019 Item 10A - Manual 14G - Revisions  PDF
11.11.2019 Item 10B - Manual 14G - Changes - Executive Summary  PDF
11.11.2019 Item 10C - Manual 14G - Revisions - Redline  PDF
11.7.2019 Item 11A - DERRTTF Sunset  PDF
11.7.2019 Item 11B - DERRTTF Sunset  PDF
11.7.2019 Item 12 - Membership Management & Account Manager Update  PDF
11.7.2019 Item 13 - Using Secure Share to Submit Proposals  PDF
11.7.2019 Item 14 - CIR Education  PDF
11.11.2019 Item 15 - Effective Load Carrying Capability (ELCC) Review  PDF
11.7.2019 Item 17 - PJM Queue Status Update  PDF
11.7.2019 Item 18 - Reliability Compliance Update  PDF
11.7.2019 Item 19 - Model Build Activity Update  PDF
11.14.2019 Posting Score Card  XLS

 10.17.2019 - Planning Committee

10.10.2019 Agenda  PDF
10.10.2019 Agenda  DOC
11.14.2019 Minutes  PDF
10.10.2019 Item 3 - Draft Minutes - PC - 9.12.2019  PDF
10.10.2019 Item 4 - Work Plan  PDF
10.10.2019 Item 5 - Communication & Subscription Improvements  PDF
10.10.2019 Item 6A - 2019 Installed Reserve Margin Study Results  PDF
10.10.2019 Item 6B - PJM Reserve Requirement Study - Draft  PDF
10.10.2019 Item 7A - Critical Infrastructure Stakeholder Oversight - Problem Statement  PDF
10.10.2019 Item 7B - Critical Infrastructure Stakeholder Oversight - Issue Statement Revised Redline  PDF
10.10.2019 Item 7C - Critical Infrastructure Stakeholder Oversight - Issue Charge Revised Clean  PDF
10.10.2019 Item 8A - 2019 Changes to RS Charter  PDF
10.10.2019 Item 8B - RS Charter - Redline  PDF
10.10.2019 Item 8C - RS Charter - Clean  PDF
10.22.2019 Item 9A - Competitive Transmission Proposal Fee - Presentation  PDF
10.14.2019 Item 9B - Executive Summary Agreement Changes - Proposal Fee Operating Agreement  PDF
10.10.2019 Item 9C - Proposal Fee Draft OA Language - Redline  PDF
10.22.2019 Item 10A - Manual 14F - Revisions & Cost Containment  PDF
10.14.2019 Item 10B - Manual 14F - Executive Summary Manual Changes - Cost Containment  PDF
10.10.2019 Item 10C - Manual 14F Language - Anticipated Manual 14F Redline between 10.17.2019 & 8.29.2019  PDF
10.10.2019 Item 10D - Manual 14F Language - Anticipated Manual 14F Clean  PDF
10.10.2019 Item 10E - Monitoring Analytics Comments to Anticipated Manual 14F Language  PDF
10.10.2019 Item 11A - Manual 19 Revisions  PDF
10.10.2019 Item 11B - Manual 19 - Executive Summary Manual Changes  PDF
10.10.2019 Item 11C - Manual 19 Revision 34 - Redline  PDF
10.10.2019 Item 13 - Manual 14G - DERS Update  PDF
10.10.2019 Item 14A - DERRTTF Update  PDF
10.10.2019 Item 14B - PJM Guideline for Ride Through Performance - Draft  PDF
10.10.2019 Item 15 - Dayton Power and Light Transmission Planning Criteria Update  PDF
10.10.2019 Item 16 - Duke Energy Ohio and Kentucky Transmission Planning Criteria Update  PDF
10.10.2019 Item 17 - PPL Presentation to PC on FAC-008 Derates  PDF
10.11.2019 Item 18 - Effective Load Carrying Capability (ELCC) Review  PDF
10.14.2019 Item 19 - Project Status & Cost Allocation Page Update  PDF
10.10.2019 Informational Only - Manual 3 - Redline  PDF
10.10.2019 Informational Only - Manual 3 Revision 56 - Executive Summary  PDF
10.10.2019 Informational Only - Manual 3 Revision 56 - Updates  PDF
10.17.2019 Posting Score Card  XLS

 9.20.2019 - PC Special Session - Merchant Transmission & Offshore Wind(Canceled)

 9.12.2019 - Planning Committee

9.9.2019 Agenda  PDF
9.9.2019 Agenda  DOC
10.17.2019 Minutes  PDF
8.14.2019 Item 3 - Draft Minutes - PC - 8.8.2019  PDF
9.5.2019 Item 5A - Transparency & End of Life Planning - Problem Statement  PDF
9.5.2019 Item 5B - Final Draft - AMP/ODEC Transparency & End of Life Planning - Issue Charge  PDF
9.12.2019 Item 5B - AMP/ODEC Transparency & End of Life Planning - Issue Charge - Friendly Amendments - Post Meeting  PDF
9.5.2019 Item 5C - Final Draft - AMP/ODEC Transparency & End of Life Planning - Issue Charge - Redline  PDF
9.5.2019 Item 5D - TRPSTF Education Topics Schedule  PDF
9.6.2019 Item 6A - Competitive Transmission Proposal Fee - Update  PDF
9.9.2019 Item 6B - Competitive Transmission Proposal Fee - OA Redline  PDF
9.5.2019 Item 7 - 2019 RRS Preliminary Assessment Results  PDF
9.5.2019 Item 8A - Critical Infrastructure Stakeholder Oversight - Problem Statement  PDF
9.5.2019 Item 8B - Critical Infrastructure Stakeholder Oversight - Issue Charge  PDF
9.9.2019 Item 9A - Manual 14F - Revisions & Cost Containment  PDF
9.9.2019 Item 9B - Manual 14F - Changes Proposed by the PJM TO's  PDF
9.5.2019 Item 10 - Offshore Wind Update  PDF
9.5.2019 Item 11 - Proposed Load Forecast Changes  PDF
9.5.2019 Item 12 - 2020 Preliminary Budget  PDF
9.5.2019 Item 13 - Model Build Activity Update  PDF
9.6.2019 Item 14 - Capacity Interconnection Rights Education  PDF
9.5.2019 Informational Only - Proposed Attachment M-4 to PJM Tariff  PDF
9.13.2019 PC Posting Score Card  XLS

 6.13.2019 - Planning Committee

6.10.2019 Agenda  PDF
6.10.2019 Agenda  DOC
7.11.2019 Minutes  PDF
5.22.2019 Item 3 - Draft Minutes - PC - 5.16.2019  PDF
6.6.2019 Item 4A - Manual 14G Updates  PDF
6.6.2019 Item 4B - Manual 14G - Executive Summary  PDF
6.11.2019 Item 4C - Manual 14G Revision 2 - Redline  PDF
6.6.2019 Item 4D - Manual 14G Revision 2 - Clean  PDF
6.6.2019 Item 5A - 2019 Reserve Requirement Study (RRS) Assumptions  PDF
6.13.2019 Item 5B - RRS Assumptions Letter - Redline  PDF
6.13.2019 Item 5C - RRS Assumptions Letter - Clean  PDF
6.12.2019 Item 6 - MEPETF Charter  PDF
6.6.2019 Item 7A - Manual 21 Revisions  PDF
6.6.2019 Item 7B - Manual 21 - Executive Summary  PDF
6.6.2019 Item 7C - Manual 21 Revision 14 - Redline  PDF
6.6.2019 Item 7D - Manual 21 Revision 14 - Clean  PDF
6.12.2019 Item 8 - Cost Containment Status & Next Steps  PDF
6.10.2019 Item 9A - RTEP Process Enhancement  PDF
6.10.2019 Item 9B - Manual 14B - Revision 45 - Redline  PDF
6.10.2019 Item 9C - Manual 14B - Revision 45 - Clean  PDF
6.10.2019 Item 9D - Language from MRC Motion to Amend Manual 14B  PDF
6.6.2019 Item 10 - DERRTTF Update  PDF
6.6.2019 Item 11 - FERC Order 845 Implementation Update  PDF
6.6.2019 Item 12A - TSS Update  PDF
6.6.2019 Item 12B - TSS Charter - Redline  PDF
6.6.2019 Item 13 - Model Build Activity Update  PDF
6.6.2019 Item 14 - Multi-User Access for Queue Point  PDF
6.6.2019 Informational Only - Economic Project Cost Allocation Stakeholder Notice - 5.20.2019  PDF
6.13.2019 Posting Score Card  XLS

 5.16.2019 - Planning Committee

5.10.2019 Agenda  PDF
5.10.2019 Agenda  DOC
6.13.2019 Minutes  PDF
4.17.2019 Item 3 - Draft Minutes - PC - 4.11.2019  PDF
5.10.2019 Item 4A - Monitoring Analytics - Problem Statement Discussion  PDF
5.10.2019 Item 4B - Business Cost Analysis - Problem Statement  PDF
5.10.2019 Item 4C - Business Cost Analysis - Issue Charge  PDF
5.9.2019 Item 5A - Manual 7 - Changes  PDF
5.9.2019 Item 5B - Manual 7 - Executive Summary  PDF
5.9.2019 Item 5C - Manual 7 Revision 4 - Redline  PDF
5.10.2019 Item 6A - Manual 14G - Updates  PDF
5.10.2019 Item 6B - Manual 14G - Executive Summary  PDF
5.10.2019 Item 6C - Manual 14G Revision 2 - Redline  PDF
5.10.2019 Item 6D - Manual 14G Revision 2 - Clean  PDF
5.9.2019 Item 7A - 2019 Reserve Requirement Study Assumptions  PDF
5.9.2019 Item 7B - 2019 Reserve Requirement Study Letter - Redline  PDF
5.9.2019 Item 7C - 2019 Reserve Requirement Study Letter - Clean  PDF
5.10.2019 Item 8 - Cost Containment Status and Next Steps  PDF
5.10.2019 Item 9 - Merchant Transmission and Offshore Wind Update  PDF
5.13.2019 Item 11 - Interconnection Queue Status & Statistics Update  PDF
5.17.2019 Item 12 - Model Build Activity Update  PDF
5.20.2019 Item 13 - Geomagnetic Disturbance Update  PDF
5.10.2019 Item 14A - PJM MISO JOA Revisions  PDF
5.10.2019 Item 14B - MISO JOA Section 9.3 - Redline  PDF
5.10.2019 Item 14C - MISO JOA Section 9.4 - Redline  PDF
5.10.2019 Item 15 - Exelon TO Planning Criteria  PDF
5.9.2019 Item 16 - ComEd Quad Cities RAS Removal  PDF
5.10.2019 Item 17 - Multi-User Access for Queue Point  PDF
5.16.2019 Posting Score Card  XLS

 4.24.2019 - PC Special Session - RTEP Process Enhancements

 4.16.2019 - PC Special Session - Merchant Transmission and Offshore Wind

 4.11.2019 - Planning Committee

4.5.2019 Agenda  PDF
4.5.2019 Agenda  DOC
5.16.2019 Minutes  PDF
3.13.2019 Item 3 - Draft Minutes - PC - 3.7.2019  PDF
4.4.2019 Item 4 - Work Plan  PDF
4.4.2019 Item 5A - Manual 21 - Revisions  PDF
4.4.2019 Item 5B - Manual 21 - Executive Summary  PDF
4.4.2019 Item 5C - Manual 21 Revision 13 - Redline  PDF
4.4.2019 Item 5D - Manual 21 Revision 13 - Clean  PDF
4.4.2019 Item 6A - MEPETF Phase 2  PDF
4.4.2019 Item 6B - Manual 14B - Executive Summary  PDF
4.4.2019 Item 6C - Manual 14F - Executive Summary  PDF
4.4.2019 Item 6D - Manual 14B Proposed Changes - Redline  PDF
4.15.2019 Item 6D - Manual 14B Proposed Changes - Redline – Approved Post Meeting  PDF
4.4.2019 Item 6E - Manual 14F Proposed Changes - Redline  PDF
4.4.2019 Item 6F - OA Schedule 6 Section 1.5.7 Phase II - Redline  PDF
4.11.2019 Item 6F - OA Schedule 6 Section 1.5.7 Phase II - Redline - Post Meeting  PDF
4.4.2019 Item 6G - MEPETF Final Proposal Report Phase II  PDF
4.4.2019 Item 7A - BC Analysis Problem Statement  PDF
4.4.2019 Item 7B - BC Analysis Issue Charge  PDF
4.4.2019 Item 8A - Manual 7 - Changes  PDF
4.4.2019 Item 8B - Manual 7 - Executive Summary  PDF
4.4.2019 Item 8C - Manual 7 Revision 4 - Redline  PDF
4.8.2019 Item 9 - Cost Containment Status and Next Steps  PDF
4.8.2019 Item 10 - FERC Order 845 Update  PDF
4.8.2019 Item 11 - DER Ride Through Task Force Update  PDF
4.4.2019 Item 12 - Model Build Activity Update  PDF
4.4.2019 Item 13 - Reliability Compliance Update  PDF
4.10.2019 Item 14 - RTEP Process Enhancements  PDF
4.8.2019 Informational Only - Manual 3 Revision 55 - Non-CEII Redline  PDF
4.11.2019 Posting Score Card  XLS

 3.7.2019 - Planning Committee

3.4.2019 Agenda  PDF
3.4.2019 Agenda  DOC
4.11.2019 Minutes  PDF
2.13.2019 Item 3 - Draft Minutes - PC - 2.7.2019  PDF
2.28.2019 Item 4A - Manual 20 Revisions  PDF
2.28.2019 Item 4B - Manual 20 Executive Summary  PDF
2.28.2019 Item 4C - Manual 20 Revision 10 Redline  PDF
2.28.2019 Item 5A - MEPETF Phase 2  PDF
3.1.2019 Item 5B - Manual 14B Executive Summary  PDF
3.1.2019 Item 5C - Manual 14F Executive Summary  PDF
3.1.2019 Item 5D - Manual 14B Proposed Changes - Redline  PDF
3.1.2019 Item 5E - Manual 14F Proposed Changes - Redline  PDF
3.1.2019 Item 5F - OA Schedule 6 Section 1.5.7 Phase II Redline  PDF
3.4.2019 Item 6A - Manual 21 Changes  PDF
2.28.2019 Item 6B - Manual 21 Executive Summary  PDF
3.1.2019 Item 6C - Manual 21 Revision 13 - Redline  PDF
3.1.2019 Item 6D - Manual 21 Revision 13 - Clean  PDF
3.7.2019 Item 6E1 - ELCC Memo Re: Modern Wind and Solar - Post Meeting  PDF
3.7.2019 Item 6E2 - PJM/ELCC Proposed Method - Post Meeting  XLS
4.11.2019 Item 7 - Cost Containment and Next Steps  PDF
3.4.2019 Item 8A - FERC Order No. 845 Update  PDF
3.4.2019 Item 8B - Reform A4 Dispute Resolution OATT 12.1  PDF
3.4.2019 Item 8C - Reform A4 Dispute Resolution OATT 40  PDF
3.4.2019 Item 8D - Reform B1 Contingent Facilities OATT Definition and 205.2  PDF
3.4.2019 Item 8E - Reform B2 Transparency OATT 36.1.7  PDF
3.4.2019 Item 8F - Reform B4 Generating Facility OATT and RAA Definitions  PDF
2.28.2019 Item 9 - AE2 Queue Update  PDF
2.28.2019 Item 10A - Model Build Activity Update and MOD-032 Update  PDF
3.4.2019 Item 10B - PJM MOD 032 Data Requirements and Procedures - Redline  PDF
2.28.2019 Item 11 - Merchant Transmission and Offshore Wind  PDF
3.4.2019 Item 12 - Modeling of Upgrades in RTEP Cases Problem Statement  PDF
2.28.2019 Item 13 - PJM Homepage Redesign  PDF
3.7.2019 Posting Score Card  XLS

 2.7.2019 - Planning Committee

2.4.2019 Agenda  PDF
2.4.2019 Agenda  DOC
3.7.2019 Minutes  PDF
1.16.2019 Item 3 - Draft Minutes - PC - 1.10.2019  PDF
1.31.2019 Item 4A - TO/TOP Matrix Revision 13 - Committee Updates  PDF
1.31.2019 Item 4B - Draft PJM TO/TOP Matrix Revision 13  PDF
1.31.2019 Item 4C - Draft PJM TO/TOP Matrix Revision 13  XLS
2.1.2019 Item 5 - Offshore Wind Problem Statement Presentation  PDF
1.31.2019 Item 5B - Offshore Wind Problem Statement  PDF
1.31.2019 Item 6A - Deficiency Cure Problem Statement Presentation  PDF
1.31.2019 Item 6B - Deficiency Cure Manual 14A Executive Summary  PDF
1.31.2019 Item 6C - Deficiency Cure Manual 14A Redline  PDF
1.31.2019 Item 6D - Deficiency Cure Manual 14A Clean  PDF
2.7.2019 Item 6E - Deficiency Cure Problem Statement  PDF
1.31.2019 Item 7A - Manual 20 Revisions  PDF
1.31.2019 Item 7B - Manual 20 Executive Summary  PDF
1.31.2019 Item 7C - Manual 20 Revision 10 Redline  PDF
2.4.2019 Item 8 - ELCC Update  PDF
1.31.2019 Item 9 - Cost Containment Status and Next Steps  PDF
1.31.2019 Item 10 - Network Model Alignment Achievements  PDF
2.4.2019 Item 11 - Dynamic Models Submission  PDF
2.4.2019 Item 13A - RTEP Process Enhancements - Modeling of Upgrades in RTEP Cases  PDF
2.1.2019 Item 13B - RTEP Process Enhancements Friendly Amendment  PDF
2.4.2019 Item 14 - Model Build Activity Update  PDF
1.31.2019 Item 15 - The Value of Transmission Paper  PDF
2.4.2019 Item 16 - ComEd Lisle RAS Removal  PDF
2.7.2019 PC Posting Score Card  XLS

 1.18.2019 - PC Special Session: Manual 14B Load and Generator Deliverability

 1.10.2019 - Planning Committee

1.7.2019 Agenda  PDF
1.7.2019 Agenda  DOC
2.7.2019 Minutes  PDF
12.19.2018 Item 3 - Draft Minutes - PC - 12.13.2018  PDF
1.4.2019 Item 4 - Work Plan  PDF
1.4.2019 Item 5A - Manual 14B Updates  PDF
1.4.2019 Item 5B - Manual 14B Executive Summary  PDF
1.4.2019 Item 5C - Manual 14B Redline  PDF
1.4.2019 Item 5D - Manual 14B Clean  PDF
1.9.2019 Item 5E - Manual 14B Additional Clarifications  PDF
1.4.2019 Item 6A - Manual 14G Updates  PDF
1.4.2019 Item 6B - Manual 14G Executive Summary  PDF
1.4.2019 Item 6C - Manual 14G Redline  PDF
1.4.2019 Item 6D - Manual 14G Clean  PDF
1.4.2019 Item 7A - TO/TOP Matrix Revision 13  PDF
1.4.2019 Item 7B - Draft PJM TO/TOP Matrix Revision 13  PDF
1.4.2019 Item 7C - Draft PJM TO/TOP Matrix Revision 13  XLS
1.7.2019 Item 8A - Problem Statement - Offshore Wind Development  PDF
1.7.2019 Item 8B - Offshore Wind Development Problem Statement  PDF
1.7.2019 Item 9A - Deficiency Cure Problem Statement  PDF
1.7.2019 Item 9B - New Service Request - Deficiency Review Problem Statement  PDF
1.7.2019 Item 9C - OATT Redline  PDF
1.7.2019 Item 9D - OATT Clean  PDF
1.4.2019 Item 10 - Cost Containment Status and Next Steps  PDF
1.4.2019 Item 11 - TSA Damping Implementation  PDF
1.4.2019 Item 12 - 2019 Reliability Compliance Update  PDF
1.4.2019 Item 13 - Model Build Activity Update  PDF
1.7.2019 Item 14A - Effective Load Carrying Capability (ELCC) Analysis  PDF
1.4.2019 Item 14B - PJM Manual 21 Changes  PDF
1.10.2019 Posting Score Card  XLS

 12.21.2018 - PC Special Session - ELCC Analysis of Intermittent Resources

 10.16.2018 - PC Special Session - Order 845 Compliance Requirements

 8.28.2018 - TO Hosted Meeting - New Supplemental Planning Process

 8.20.2018 - PC Special Session - Compliance Requirements for Order 845

 8.9.2018 - Planning Committee

8.7.2018 Agenda  PDF
8.7.2018 Agenda  DOC
9.13.2018 Minutes  PDF
7.18.2018 Item 3 - Draft Minutes - PC - 7.12.2018  PDF
8.2.2018 Item 4A - Manual 14B Attachment C Deliverability Revisions  PDF
8.2.2018 Item 4B - Executive Summary Manual 14B Updates  PDF
8.2.2018 Item 4C - Manual 14B Attachment C Load Deliverability Revisions - Redline  PDF
8.2.2018 Item 4D - Manual 14B Attachment C Load Deliverability Revisions - Clean  PDF
8.2.2018 Item 5A - Manual 14C Proposed Changes  PDF
8.2.2018 Item 5B - Executive Summary Manual 14C Revisions  PDF
8.2.2018 Item 5C - Manual 14C - Redline  PDF
8.2.2018 Item 6A - MEPETF Packages  PDF
8.3.2018 Item 6B - MEPETF - OA Revisions  PDF
8.3.2018 Item 6C - Executive Summary - Manual 14B Changes  PDF
8.3.2018 Item 6D - Manual 14B - Redline  PDF
8.6.2018 Item 6E - MEPETF Package H - AEP  PDF
8.6.2018 Item 7A - Manual 14F Updates - Rev 2  PDF
8.2.2018 Item 7B - Executive Summary - Manual 14F Updates  PDF
8.6.2018 Item 7C - Manual 14F - Redline 2  PDF
8.2.2018 Item 8A - Institute of Electric and Electronic Engineers Standard 1547 and Reliable Integration of Distributed Energy Resources  PDF
8.2.2018 Item 8B - Draft Problem Statement - Smart Inverter Frequency and Voltage Ride-Through and Trip Settings  PDF
8.2.2018 Item 8C - Draft Issue Charge - Smart Inverter Frequency and Voltage Ride-Through and Trip Settings  PDF
8.7.2018 Item 9A - PJM Manual 21 Changes  PDF
8.2.2018 Item 9B - Executive Summary Manual 21  PDF
8.2.2018 Item 9C - Manual 21 Revision 13 - Redline  PDF
8.2.2018 Item 9D - Manual 21 Revision 13 - Clean  PDF
8.2.2018 Item 10 - Cost Containment Update and Next Steps  PDF
8.2.2018 Item 11A - IPSAC Presentation  PDF
8.2.2018 Item 11B - Joint Operating Agreement 9.3 IPSAC Redlines  PDF
8.7.2018 Item 11C - Joint Operating Agreement 9.4 IPSAC Redlines  PDF
8.2.2018 Item 13A - Planning Modeling update  PDF
8.2.2018 Item 13B - Link to Recording for August 2018 Model Build Activity Update  PDF
8.2.2018 Item 14A - Reliability Compliance Update  PDF
8.2.2018 Item 14B - Link to Recording for August 2018 Reliability Compliance Update  PDF
8.9.2018 PC Posting Score Card  XLS

 7.12.2018 - Planning Committee

7.5.2018 Agenda  PDF
7.5.2018 Agenda  DOC
8.9.2018 Minutes  PDF
6.13.2018 Item 3 – Draft Minutes – PC – 6.7.2018  PDF
7.5.2018 Item 4 - PC Work Plan  PDF
8.9.2018 Item 5A - Manual 14A Division  PDF
7.5.2018 Item 5B - Executive Summary Manual 14A - 14G  PDF
7.5.2018 Item 5C - Manual 14A Redline  PDF
7.5.2018 Item 5D - Manual 14A Clean  PDF
7.5.2018 Item 5E - Manual 14G Clean with References  PDF
7.5.2018 Item 6 - PJM Load Model Selection for 2108 RRS  PDF
7.5.2018 Item 7A - Manual 14B ATT C Load Deliv Revisions  PDF
7.5.2018 Item 7B - Executive Summary Manual 14B Updates  PDF
7.5.2018 Item 7C - Manual 14B ATT C Load Deliv Revisions Redline  PDF
7.5.2018 Item 7D - Manual 14B ATT C Load Deliv Revisions Clean  PDF
7.5.2018 Item 8A - PJM Relay Philosophy Document Revisions  PDF
7.5.2018 Item 8B - PJM Relay Philosophy Redline  PDF
7.5.2018 Item 9A - Manual 14C Proposed Changes  PDF
7.5.2018 Item 9B - Manual 14C Revision - Executive Summary  PDF
7.5.2018 Item 9C - Manual 14C Redline  PDF
7.11.2018 Item 10A - MEPETF Packages July - Updated  PDF
7.5.2018 Item 11A - Manual 14F Updates  PDF
7.5.2018 Item 11B - Executive Summary - Manual 14F Updates  PDF
7.5.2018 Item 11C - Manual 14F Redline  PDF
7.5.2018 Item 11D - Manual 14F Clean  PDF
7.6.2018 Item 11E - MEPETF M-14 Update - July  PDF
7.6.2018 Item 11F - Executive Summary - Manual Changes MEPETF  PDF
7.11.2018 Item 11G - Manual 14F for MEPETF Draft Redline - Updated  PDF
8.9.2018 Item 12 - Cost Commitment Update & Next Steps  PDF
7.5.2018 Item 13 - Security Initiatives - High-Level Overview  PDF
7.10.2018 Item 14 - PC, TEAC & SRRTEP Meeting Information  PDF
7.5.2018 Item 15A - Resilience Discussion  PDF
8.9.2018 Item 16 - Revised Supplemental Planning Process  PDF
7.10.2018 Item 17 - Order 845 Compliance Update  PDF
7.5.2018 Item 18 - Dominion Energy Carolina 54 RAS Removal  PDF
7.5.2018 Item 19 - Reliability Compliance Update  PDF
7.5.2018 Item 20A - Planning Modeling Update  PDF
7.5.2018 Item 20B - July 2018 Model Build Activity Update - Link to Recording  PDF
7.12.2018 PC Posting Score Card  XLS

 6.7.2018 - Planning Committee

5.31.2018 Agenda  PDF
5.31.2018 Agenda  DOC
7.12.2018 Minutes  PDF
5.10.2018 Item 3 – Draft Minutes – PC – 5.3.2018  PDF
5.31.2018 Item 4A - Manual 20 Updates  PDF
5.31.2018 Item 4B - Executive Summary Manual 20 Updates  PDF
5.31.2018 Item 4C - Manual 20 Section 3.3 Updates  PDF
5.31.2018 Item 5A - 2018 RRS Assumptions  PDF
5.31.2018 Item 5B - RRS Assumptions Letter 2018  PDF
5.31.2018 Item 6A - Manual 14A Division  PDF
5.31.2018 Item 6B - Executive Summary Manual 14A - Manual 14G  PDF
6.4.2018 Item 6C - Manual 14A - Redline  PDF
6.4.2018 Item 6D - Manual 14A - Clean  PDF
6.4.2018 Item 6E - Manual 14G - Clean with References  PDF
6.1.2018 Item 7 - PJM Load Model Selection for 2018 RRS  PDF
5.31.2018 Item 8 - TO Ratings Process & Reporting  PDF
6.4.2018 Item 11A - PJM Project Proposal Template  PDF
6.4.2018 Item 11B - PJM Project Proposal Template  XLS
6.4.2018 Item 12A - Manual 14B Att C Load Deliv Revisions  PDF
6.4.2018 Item 12B - Manual 14B Att C Load Deliv Revisions - Redline  PDF
6.4.2018 Item 12C - Manual 14B Att C Load Deliv Revisions - Clean  PDF
5.31.2018 Item 14 - MEPETF Update  PDF
6.4.2018 Item 15 - PSEG Planning Criteria Updates  PDF
5.31.2018 Item 16 - AEP Planning Criteria Updates  PDF
6.4.2018 Item 17 - Final Rule - Generator Interconnection Reforms  PDF
5.31.2018 Item 18 - Planning Modeling Update & MOD-032 Update  PDF
5.31.2018 Item 20A - 2018 RC Updates for Committees  PDF
5.31.2018 Item 20B - Link to Recording for June 2018 Reliability Compliance Update  PDF
6.7.2018 Posting Score Card  XLS

 5.3.2018 - Planning Committee

4.30.2018 Agenda  PDF
4.30.2018 Agenda  DOC
6.7.2018 Minutes  PDF
4.11.2018 Item 3 – Draft Minutes – PC – 4.5.2018  PDF
4.26.2018 Item 4A - Manual 14A Updates - Attachment F & G  PDF
4.26.2018 Item 4B - Executive Summary Manual 14A - Attachment F & G  PDF
4.26.2018 Item 4C - Manual 14A Updates - Attachment F & G - Redline  PDF
4.26.2018 Item 4D - Manual 14A Updates - Attachment F & G - Clean  PDF
4.26.2018 Item 5A - PJM Manual 7 Revision 3  PDF
4.26.2018 Item 5B - PJM Manual 7 Revision 3 - Redline  PDF
4.26.2018 Item 6A - PJM Relay Testing Subcommittee  PDF
4.26.2018 Item 6B - Relay Testing & Maintenance Practices - Redline  PDF
4.26.2018 Item 6C - Relay Testing & Maintenance Practices - Clean  PDF
4.26.2018 Item 6D - PJM Requirements for BES End to End Protection Testing 1.0  PDF
4.26.2018 Item 7A - TO-TOP Matrix Version 12 - Committee Updates  PDF
4.26.2018 Item 7B - Draft PJM TO-TOP Matrix Version 12 TOA-AC  PDF
4.26.2018 Item 7C - Draft PJM TO-TOP Matrix Version 12  XLS
4.30.2018 Item 8A - Manual 20 Updates  PDF
4.27.2018 Item 8B - Executive Summary Manual 20 Updates  PDF
4.27.2018 Item 8C - Manual 20, Section 3.3 Updates - Redline  PDF
4.27.2018 Item 9A - 2018 RRS Assumptions  PDF
4.27.2018 Item 9B - RRS Assumptions Letter 2018  PDF
4.26.2018 Item 10A - Special PC Cost Containment May PC Update  PDF
4.30.2018 Item 10B1 - Enhanced PJM Project Proposal Templates  PDF
4.30.2018 Item 10B2 - PJM Enhanced Project Proposal Template  XLS
4.30.2018 Item 10B3 - Special PC Cost Containment Proposal  PDF
4.30.2018 Item 10B4 - Special PC Cost Containment Options & Solutions Matrix  XLS
5.4.2018 Item 10B5 - Motion - Version 2 - Presented  PDF
4.26.2018 Item 11 - PJM Interconnection Queue Status Statistics Update  PDF
4.30.2018 Item 12 - TEAC & SRRTEP Meeting Information  PDF
4.26.2018 Item 13 - TO Ratings Process & Reporting  PDF
4.26.2018 Item 14 - Contact Management Stakeholder Presentation  PDF
4.26.2018 Item 15A - Planning Modeling Update & MOD-032 Update  PDF
4.26.2018 Item 15B - Link to Recording for May 2018 Model Build Activity Update  PDF
4.30.2018 Item 15C - MOD-026-027 Process Update  PDF
4.30.2018 Item 15D - Link to Recording for May 2018 MOD-026-027 Process Update  PDF
4.26.2018 Item 16A - 2018 RC Updates for Committees  PDF
4.26.2018 Item 16B - Link to Recording for May 2018 Reliability Compliance Update  PDF
5.4.2018 PC Posting Score Card  XLS

 4.5.2018 - Planning Committee Meeting

3.29.2018 Agenda  PDF
3.29.2018 Agenda  DOC
5.4.2018 Minutes  PDF
3.29.2018 Item 3 - PC Work Plan  PDF
3.14.2018 Item 4 – Draft Minutes – PC – 3.8.18  PDF
3.29.2018 Item 5A - Manual 14A - Presentation  PDF
3.29.2018 Item 5B - Manual 14A Revisions - Executive Summary  PDF
3.29.2018 Item 5C - Manual 14A Revisions - Redline  PDF
3.29.2018 Item 05D - Manual 14A Revisions - Clean  PDF
3.29.2018 Item 6 - MEPETF Charter  PDF
3.29.2018 Item 7A - Manual 14A Updates - Attachment F & G  PDF
3.29.2018 Item 7B - Executive Summary Manual 14A - Attachment F & G  PDF
3.29.2018 Item 7C - Manual 14A Updates - Attachment F & G - Redline  PDF
3.29.2018 Item 7D - Manual 14A Updates - Attachment F & G - Clean  PDF
3.29.2018 Item 8A - PJM Manual 7 Revision 3  PDF
4.2.2018 Item 8B - PJM Manual 7 Revision 3 - Redline  PDF
3.29.2018 Item 9A - PJM Relay Testing Subcommittee  PDF
3.29.2018 Item 9B - Relay Testing & Maintenance Practices - Redline  PDF
3.29.2018 Item 9C - Relay Testing & Maintenance Practices - Clean  PDF
3.29.2018 Item 9D - PJM Requirements for BES End to End Protection Testing 1.0  PDF
3.29.2018 Item 10A - TO-TOP Matrix V12 Committee Updates  PDF
3.29.2018 Item 10B - Draft Matrix Version 12  PDF
3.29.2018 Item 10C - Draft PJM TO TOP Matrix Version 12  XLS
3.29.2018 Item 11 - Cost Containment Update  PDF
3.29.2018 Item 14 - Interface Definition Changes  PDF
3.29.2018 Item 15 - ComEd Transmission Planning Criteria Change  PDF
3.29.2018 Item 16 - UP North RAS Removal - PJM Presentation  PDF
3.29.2018 Item 17 - AMP Presentation on Facility Ratings  PDF
3.29.2018 Item 18 - Planning Modeling Update & MOD-032 Update  PDF
3.29.2018 Item 19 - 2018 Reliability Compliance Update  PDF
3.29.2018 Information Only - Manual 3 Revision 53 Redline  PDF
4.6.2018 PC Posting Score Card  XLS

 3.8.2018 - Planning Committee Meeting

3.6.2018 Agenda  PDF
3.6.2018 Agenda  DOC
4.5.2018 Minutes  PDF
2.14.2018 Item 2 – Draft Minutes – PC – 2.8.2018  PDF
3.1.2018 Item 3A - Manual 14B Revisions  PDF
3.1.2018 Item 3B - Executive Summary - Manual 14B  PDF
3.1.2018 Item 3C - Manual 14B Revision 41 - Redline  PDF
3.1.2018 Item 3D - Manual 14B Revision 41 - Clean  PDF
3.1.2018 Item 3E - Transformer Loading Changes Under New Generator Deliverability Rules  XLS
3.5.2018 Item 4 - Manual 12 Revision 38 - Redline  PDF
3.1.2018 Item 5A - Manual 14A Revisions  PDF
3.1.2018 Item 5B - Executive Summary - Manual 14A  PDF
3.1.2018 Item 5C - Manual 14A Revision 22 Full Manual - Clean  PDF
3.1.2018 Item 5D - Manual 14A Revision 22 Full Manual - Redline  PDF
3.5.2018 Item 6A - Manual 21 Revisions  PDF
3.2.2018 Item 6B - Executive Summary - Manual 21  PDF
3.2.2018 Item 6C - Manual 21 Revision 13 - Redline  PDF
3.1.2018 Item 7 - MEPETF Charter  PDF
3.1.2018 Item 8 - Cost Containment Update  PDF
3.1.2018 Item 9 - Manual 14A-14G Language Updates  PDF
3.5.2018 Item 10 - TEAC & SRRTEP Meeting Information  PDF
3.6.2018 Item 11A - Do No Harm Assessment - PJM  PDF
3.6.2018 Item 11B - Do No Harm Discussion - AMP  PDF
3.2.2018 Item 12A - Planning Modeling Update & MOD-032 Update  PDF
3.2.2018 Item 12B - PJM MOD-032 Data Requirements & Procedures 2018 - Redline  PDF
3.1.2018 Item 13 - 2018 Reliability Compliance Update  PDF
3.1.2018 Item 14 - Davis Creek RAS Removal - PJM Presentation  PDF
3.9.2018 PC Posting Score Card  XLS

 2.8.2018 - Planning Committee Meeting

2.1.2018 Agenda  PDF
2.1.2018 Agenda  DOC
3.8.2018 Minutes  PDF
1.17.2018 Item 1 - Draft Minutes - PC - 1.11.2018  PDF
2.1.2018 Item 3A - Transmission Service & Upgrade Requests  PDF
2.1.2018 Item 3B - Pages from Manual 14A Revision 21 - Redline  PDF
2.1.2018 Item 3C - Pages from Manual 14E Revision 5 - Redline  PDF
2.1.2018 Item 4A - Manual 2 Changes  PDF
2.1.2018 Item 4B - Executive Summary - Manual 2 Revision 14  PDF
2.1.2018 Item 4C - Manual 2 - Redline  PDF
2.1.2018 Item 5A - Manual 14B Changes  PDF
2.1.2018 Item 5B - Executive Summary - Manual 14B  PDF
2.1.2018 Item 5C - Manual 14B Revision 41 - Redline  PDF
2.1.2018 Item 5D - Manual 14B Revision 41 - Clean  PDF
2.1.2018 Item 6A - DEDSTF Charter Revision & Final Report  PDF
2.1.2018 Item 6B - DEDSTF Final Report  PDF
2.1.2018 Item 6C - DEDSTF Charter Revisions - Clean  PDF
2.1.2018 Item 6D - DEDSTF Charter Revisions - Redline  PDF
2.5.2018 Item 7A - Manual 14A Changes  PDF
2.5.2018 Item 7B - Manual 14A Changes - Redline  PDF
2.14.2018 Item 7C - Manual 14A Changes Full Manual - Redline  DOC
2.6.2018 Item 8 - Cost Commitment Update  PDF
2.7.2018 Item 9 - Multiple Entities Behind One POI - Order 807 Scenarios  PDF
2.5.2018 Item 10 - Manual 21 Changes  PDF
2.7.2018 Item 11 - Manual 12 Revision 38 - Redline  PDF
2.5.2018 Item 12 - TEAC & SRRTEP Meeting Information  PDF
2.8.2018 Item 12A – AMP Comments on TEAC & SRRTEP Meeting Information  PDF
2.2.2018 Item 13 - PJM.com Generation Deactivations Update  PDF
2.1.2018 Information Only - Planning Modeling Update  PDF
2.1.2018 Information Only - Reliability Compliance Update  PDF
2.2.2018 Information Only - RTEP IARR Upgrades 2018-2019  PDF
2.12.2018 PC Posting Report Card  XLS

 1.11.2018 - Planning Committee Meeting

1.8.2018 Agenda  PDF
1.8.2018 Agenda  DOC
2.9.2018 Minutes  PDF
12.20.2017 Item 2 - Draft Minutes - PC - 12.14.2017  PDF
1.8.2018 Item 5 - Market Efficiency Process Problem Statement & Issue Charge  PDF
2.14.2018 Item 5 - Market Efficiency Process Problem Statement & Issue Charge - Revised  PDF
1.4.2018 Item 6A - Manual 14F & OA Changes  PDF
1.4.2018 Item 6B - Executive Summary - Manual 14F  PDF
1.9.2018 Item 6C - Manual 14F - Redline  PDF
1.4.2018 Item 6D - Cost Cap Draft OA Changes  PDF
1.5.2018 Item 7A - Transmission Service & Upgrade Requests  PDF
1.5.2018 Item 7B - Manual 14A - Revision 21 - Redline  PDF
1.5.2018 Item 7C - Manual 14E - Revision 5 - Redline  PDF
1.4.2018 Item 8A - Manual 02 Changes  PDF
1.4.2018 Item 8B - Executive Summary - Manual 2  PDF
1.4.2018 Item 8C - Manual 2 - Redline  PDF
1.4.2018 Item 9A - Manual 14B Changes  PDF
1.4.2018 Item 9B - Executive Summary - Manual 14B  PDF
1.4.2018 Item 9C - Manual 14B Revision 41 - Redline  PDF
1.4.2018 Item 9D - Manual 14B Revision 41 - Clean  PDF
1.5.2018 Item 10A - DEDSTF Charter Revision & Final Report  PDF
1.8.2018 Item 10B - DEDSTF Charter Revisions - Clean  PDF
1.8.2018 Item 10B - DEDSTF Charter Revisions - Redline  PDF
1.9.2018 Item 10C - DEDSTF - Final Report  PDF
1.9.2018 Item 11 - Manual 14A Division  PDF
1.8.2018 Item 12 - Planning Modeling Update  PDF
1.4.2018 Item 13 - NERC & Regional Coordination Update  PDF
1.8.2018 Item 14 - TEAC & SRRTEP Information  PDF
1.8.2018 Item 15 - Manual 12, Version 38 Redline  PDF
1.17.2018 Posting Score Card  XLS

 11.9.2017 - Planning Committee Meeting

11.2.2017 Agenda  PDF
11.2.2017 Agenda  DOC
11.21.2017 Item 2 - Draft Minutes - PC - 10.12.2017  PDF
11.9.2017 Item 3A - Designated Entity Design Standards Task Force Presentation  PDF
11.2.2017 Item 3B - DECSTF Document  PDF
11.2.2017 Item 3C - DEDSTF Document  PDF
11.2.2017 Item 4A - Transmission Service & Upgrade Requests Presentation  PDF
11.2.2017 Item 4B - Definitions & TOC  PDF
11.2.2017 Item 4C - Tariff II - III  PDF
11.8.2017 Item 4D - 29.2A Determination of ATC New Section  PDF
11.2.2017 Item 4E - Part IV Interconnections with Transmission & Preamble  PDF
11.2.2017 Item 4F - 36.3 Upgrade Feasibility Study New Section  PDF
11.2.2017 Item 4G - 200 Applicability  PDF
11.2.2017 Item 4H - 203.1 Cost Responsibility  PDF
11.2.2017 Item 4I - 204.1 Completed Applications  PDF
11.2.2017 Item 4J - 204.2 Upgrade  PDF
11.2.2017 Item 4K - 205.2 Scope of Studies  PDF
11.2.2017 Item 4I - Attachment N 1  PDF
11.2.2017 Item 4M - Upgrade Request Form Template Attachment EE  PDF
11.2.2017 Item 4N - Attachment FF  PDF
11.2.2017 Item 4O - Attachment MM New Form  PDF
11.8.2017 Item 5 – Market Efficiency Problem Statement & Issue Charge  PDF
11.6.2017 Item 6 - Light Load Analysis Update  PDF
11.8.2017 Item 7 – Grid Resilience in System Planning  PDF
11.2.2017 Item 8 - Planning Modeling Update  PDF
11.2.2017 Item 9 - Review of PJM Summer 2017 Loads  PDF
11.2.2017 Item 10 - NRC Update Slides for Committees  PDF
11.2.2017 Item 11 - Furnace Run Substation  PDF
11.2.2017 Item 12 - Conemaugh Rice Substation  PDF
11.10.2017 PC Posting Report Card  XLS

 11.3.2017 - Special Planning Committee Meeting: CETO/CETL Education

 10.12.2017 - Planning Committee Meeting

10.9.2017 Agenda  PDF
10.9.2017 Agenda  DOC
9.20.2017 Draft Minutes - PC - 9.14.2017  PDF
10.5.2017 Item 3 - 2017 IRM Study  PDF
10.6.2017 Item 3A - 2017 PJM Reserve Requirement Study  PDF
10.5.2017 Item 4A - Executive Summary Manual 14B  PDF
10.5.2017 Item 4B - Manual 14B Changes  PDF
10.5.2017 Item 4C - Manual 14B V140 Clean  PDF
10.5.2017 Item 4D - Manual 14B V140 Redline  PDF
10.5.2017 Item 5A - Executive Summary Manual 19 Changes  PDF
10.5.2017 Item 5B - Manual 19 Changes  PDF
10.5.2017 Item 5C - Manual 19 V32 Redline  PDF
10.5.2017 Item 6A - Transmission Service & Upgrade Requests  PDF
10.5.2017 Item 6B - Definitions & TOC Draft Redline  PDF
10.5.2017 Item 6C - Tariff II III Draft Redline  PDF
10.5.2017 Item 6D - 29.2A Determination of ATC Draft Redline  PDF
10.5.2017 Item 6E - Part IV Interc w Trans & Preamble Draft Redline  PDF
10.5.2017 Item 6F - 36.3 Upgrade Feasibility Study Draft Redline  PDF
10.5.2017 Item 6G - 200 Applicability Draft Redline  PDF
10.5.2017 Item 6H - 203.1 Cost Responsibility Draft Redline  PDF
10.5.2017 Item 6I - 204.1 Completed Applications Draft Redline  PDF
10.5.2017 Item 6J - 204.2 Upgrade Draft Redline  PDF
10.5.2017 Item 6K - 205.2 Scope of Studies Draft Redline  PDF
10.5.2017 Item 6L - Attachment N-1 Draft Redline  PDF
10.5.2017 Item 6M - Upgrade Request Form Template - Attachment EE Draft Redline  PDF
10.5.2017 Item 6N - Attachment FF Draft Redline  PDF
10.5.2017 Item 6O - Attachment MM Draft Redline  PDF
10.5.2017 Item 7A - Designated Entity Design Standards Task Force  PDF
10.5.2017 Item 7B - Designated Entity Design Standards Task Force Document Version 2.0 Redline  PDF
10.5.2017 Item 7C - Designated Entity Design Standards Task Force Document Version 2.0 Clean  PDF
10.9.2017 Item 9 - Grid Resilience in System Planning  PDF
10.5.2017 Item 10 - Planning Modeling Update  PDF
10.5.2017 Item 11 - N&RC Update  PDF
10.9.2017 Item 12 - PJM.com Update  PDF
10.5.2017 Informational - Manual 03 Changes  PDF
10.5.2017 Informational - Manual 03 Executive Summary  PDF
10.5.2017 Informational - Manual 03 V52 Non-CEII Version Redline  PDF
10.12.2017 PC Posting Report Card  XLS

 8.30.2017 - Special PC: CETL Procedural Updates Meeting

 7.18.2017 - Special PC Session: Consideration of Cost Cap/Containment Provisions for Competitive Proposals

 7.13.2017 - Planning Committee Meeting

7.10.2017 Agenda  PDF
7.10.2017 Agenda  DOC
8.10.2017 Minutes  PDF
6.14.2017 Item 2 – Draft Minutes – PC – 6.8.2017  PDF
7.10.2017 Item 3 – Load Model Selection  PDF
7.6.2017 Item 4A – Manual 14B & Operating Agreement Updates – TEAC Redesign  PDF
7.6.2017 Item 4B – Draft Manual 14B – Redline  PDF
7.6.2017 Item 4C – Draft Manual 14B – Clean  PDF
7.6.2017 Item 4D – Manual 14B – Executive Summary  PDF
7.6.2017 Item 5A – TO-TOP Matrix Version 11 Updates  PDF
7.6.2017 Item 5B – Draft PJM TO-TOP Matrix Version 11  PDF
7.6.2017 Item 5C – Draft PJM TO-TOP Matrix Version 11  XLS
7.10.2017 Item 6A – Manual 14A Updates  PDF
7.6.2017 Item 6B – Draft Manual 14A – Redline  PDF
7.6.2017 Item 6C – Draft Manual 14A – Clean  PDF
7.6.2017 Item 6D – Manual 14A – Executive Summary  PDF
7.10.2017 Item 7A - Manual 14B Updates  PDF
7.10.2017 Item 7B - Draft Manual 14B - Redline  PDF
7.10.2017 Item 7C - Draft Manual 14B - Clean  PDF
7.10.2017 Item 7D - Manual 14B - Executive Summary  PDF
7.10.2017 Item 8 – Grid Resilience in System Planning  PDF
7.10.2017 Item 9 – Winter Season Resource Adequacy & Capacity Requirements  PDF
7.10.2017 Item 10 - Class Average Wind and Solar Capacity Factors  PDF
7.10.2017 Item 11 - Geomagnetic Disturbance (GMD) Update  PDF
7.10.2017 Item 12 - TPL-001-4 Spare Equipment Strategy Update  PDF
7.10.2017 Item 13 - Planning Community Tool Update  PDF
7.6.2017 Item 14 – NERC & Regional Coordination Update  PDF
7.11.2017 Item 15 – PPL EU – New 500 kV Line Designation  PDF
8.10.2017 PC Posting Report Card  XLS

 6.8.2017 - Planning Committee Meeting

6.5.2017 Agenda  PDF
6.5.2017 Agenda  DOC
5.11.2017 Item 2 - Draft Minutes - PC - 5.4.2017  PDF
6.1.2017 Item 3A - PJM Manual 14F  PDF
6.1.2017 Item 3B - Draft New PJM Manual 14F - Redline  PDF
6.1.2017 Item 3C - Draft New PJM Manual 14F - Clean  PDF
6.1.2017 Item 3D - Manual 14F - Executive Summary  PDF
6.1.2017 Item 4A - Designated Entity Design Standards Task Force Presentation  PDF
6.1.2017 Item 4B - Designated Entity Design Standards Task Force Document  PDF
6.2.2017 Item 5A – Manual 14C Revisions  PDF
6.2.2017 Item 5B – Manual 14C Revisions – Redline  PDF
6.2.2017 Item 5C – Manual 14C Revisions – Executive Summary  PDF
6.1.2017 Item 6A - Reserve Requirement Study (RRS) Assumptions  PDF
6.1.2017 Item 6B - RRS Assumptions Letter 2017  PDF
6.1.2017 Item 7A - Manual 20 Updates  PDF
6.1.2017 Item 7B - Manual 20 - Redline  PDF
6.1.2017 Item 7C - Manual 20 - Executive Summary  PDF
6.1.2017 Item 8 - PJM Load Model Selection for 2017 RRS  PDF
6.7.2017 Item 9A - Manual 14B & Operating Agreement - TEAC Redesign  PDF
6.7.2017 Item 9B - Draft Manual 14B - Redline  PDF
6.7.2017 Item 9C - Draft Manual 14B - Clean  PDF
6.5.2017 Item 9D - Manual 14B - Executive Summary  PDF
6.5.2017 Item 10 - Manual 14A Updates  PDF
6.5.2017 Item 11 - Light Load Reliability Criteria Update  PDF
6.2.2017 Item 12 – Grid Resilience in System Planning  PDF
6.2.2017 Item 13 – CETL Calculation Discussion  PDF
6.1.2017 Item 15 - NERC & Regional Coordination Update  PDF
6.1.2017 Item 16 - AEP FERC Form 715 Updates  PDF
6.1.2017 Item 17 - PSEG FERC Form 715 Summary  PDF
6.7.2017 Informational – PJM Hosting Siemens Training  PDF
6.8.2017 PC Posting Report Card  XLS
7.15.2017 Minutes  PDF

 5.24.2017 - Special PC Session: Consideration of Cost Cap/Containment Provisions for Competitive Proposals

 5.4.2017 - Planning Committee Meeting

5.2.2017 Agenda  PDF
5.2.2017 Agenda  DOC
6.8.2017 Minutes  PDF
4.19.2017 Item 2 – Draft Minutes – PC – 4.13.2017  PDF
5.3.2017 Item 3A – Less Than $5M Queue Cost Allocation & Alternate Queue  PDF
5.3.2017 Item 3B – Draft Manual 14A – Less than $5M Cost Allocation – Redline  PDF
5.3.2017 Item 3C – Draft Tariff Language – Less than $5M Cost Allocation – Redline  PDF
5.3.2017 Item 3D – Draft Manual 14A – Alternate Queue – Redline  PDF
5.3.2017 Item 3E – Draft Tariff Language – Alternate Queue – Redline  PDF
5.3.2017 Item 3F – Manual 14A – Executive Summary  PDF
4.28.2017 Item 4A – Manual 14F – Competitive Planning Process  PDF
5.1.2017 Item 4B – Draft Manual 14F – Redline  PDF
5.1.2017 Item 4C – Draft Manual 14F – Clean  PDF
4.28.2017 Item 4D – Manual 14F – Executive Summary  PDF
4.28.2017 Item 5A – DEDSTF Presentation  PDF
4.28.2017 Item 5B – DEDSTF Protection Subgroup Document  PDF
4.28.2017 Item 5C – DEDSTF Lines Subgroup Document  PDF
5.1.2017 Item 5D – DEDSTF Substation Subgroup Document  PDF
4.28.2017 Item 6A – Manual 14C Revisions  PDF
4.28.2017 Item 6B – Manual 14C Revisions – Redline  PDF
4.28.2017 Item 6C – Manual 14C Revisions – Executive Summary  PDF
5.1.2017 Item 7A – Reserve Requirement Study Assumptions  PDF
5.1.2017 Item 7B – 2017 RRS Assumptions Letter  PDF
5.2.2017 Item 8A – Manual 20 Updates  PDF
5.2.2017 Item 8B – Manual 20 – Redline  PDF
5.2.2017 Item 8C – Manual 20 – Executive Summary  PDF
5.1.2017 Item 9 – Winter Season Resource Adequacy & Capacity Requirements  PDF
5.2.2017 Item 10 - 2017 RTEP Proposal Window Update  PDF
5.1.2017 Item 11 - Multiregional Modeling Working Group & MOD-032 Update  PDF
4.28.2017 Item 12 – PJM Interconnection Queue Status Update  PDF
4.28.2017 Item 13 – NERC and Regional Coordination Update  PDF
4.28.2017 Item 14 – Linwood RAS Removal  PDF
5.4.2017 Information Only – CETL Calculation Discussion Timeline  PDF
5.4.2017 PJM Modeling and Support MMWG Schedule 2017  XLS
5.5.2017 PC Posting Report Card  XLS

 4.13.2017 - Planning Committee Meeting

4.7.2017 Agenda  PDF
4.7.2017 Agenda  DOC
5.4.2017 Minutes  PDF
4.7.2017 Information Only - Draft Manual 3 - Updates  PDF
4.7.2017 Informational Only - Manual 3 - Executive Summary  PDF
4.7.2017 Information Only - Manual 3 - Updates  PDF
3.15.2017 Item 2 - Draft Minutes - PC - 3.9.2017  PDF
4.7.2017 Item 3A - Manual 14B - Updates  PDF
4.7.2017 Item 3B - Draft Manual 14B - Redline  PDF
4.7.2017 Item 3C - Draft Manual 14B - EE Edits Only - Redline  PDF
4.7.2017 Item 3D - Draft Manual 14B - Clean  PDF
4.7.2017 Item 3E - Manual 14B - Executive Summary  PDF
4.7.2017 Item 4A - Manual 14F - Competitive Planning Process  PDF
4.7.2017 Item 4B - Manual 14F - Redline  PDF
4.7.2017 Item 4C - Manual 14F - Clean  PDF
4.7.2017 Item 4D - Manual 14F - Executive Summary  PDF
4.7.2017 Item 5A - DEDSTF Presentation  PDF
4.7.2017 Item 5B - DESTF Protection Subgroup Document  PDF
4.7.2017 Item 5C - DEDSTF Lines Subgroup Document  PDF
4.10.2017 Item 5D – DEDSTF Substation Subgroup Document  PDF
4.7.2017 Item 6A – Less than $5M Queue Cost Allocation & Alternate Queue  PDF
4.7.2017 Item 6B – Draft Manual 14A – Less than $5M Cost Allocation – Redline  PDF
4.7.2017 Item 6C – Draft Tariff Language – Less than $5M Cost Allocation – Redline  PDF
4.7.2017 Item 6D – Draft Manual 14A – Alternate Queue – Redline  PDF
4.7.2017 Item 6E – Draft Tariff Language – Alternate Queue – Redline  PDF
4.7.2017 Item 6F – Manual 14A – Executive Summary  PDF
4.7.2017 Item 9 - EQSTF Tariff Clean Up  PDF
4.7.2017 Item 10 - UCSA Definitions Change  PDF
4.10.2017 Item 11 - CETL Calculation Discussion  PDF
4.11.2017 Item 12A – TEAC Redesign Update  PDF
4.11.2017 Item 12B – 12 Month RTEP Cycle Structure & Timing  PDF
4.11.2017 Item 12C – 18 Month RTEP Cycle Structure & Timing  PDF
4.10.2017 Item 13 – Planning Community Tool  PDF
4.10.2017 Item 14 – MMWG & MOD-032 Update  PDF
4.7.2017 Item 15 - TO Load Forecasting  PDF
4.7.2017 Item 16 - NERC & Regional Coordination Update  PDF
4.7.2017 Item 17 - PPL Transmission Planning Criteria Update  PDF
4.7.2017 Item 18 - ITCI Planning Criteria  PDF
4.7.2017 Item 19 - BGE Remedial Action Scheme Retirement  PDF
4.7.2017 Item 20 - Automatic Sectionalizing Schemes  PDF
4.7.2017 Item 21 - Manual 14D - Solar Slides  PDF
4.10.2017 Item 21B - Proposed Tariff Changes - Solar  PDF
4.13.2017 PC Posting Report Card  XLS
5.5.2017 Information Only - Manual 03v451 Updates  PDF
5.5.2017 Information Only - Manual 03v49 – Draft Redline  PDF
5.5.2017 Information Only - Manual 03v51 - Executive Summary  PDF

 11.3.2016 - Planning Committee Meeting

 10.18.2016 - PC: New Service Request Study Methods

 9.16.2016 - New Service Request Cost Allocation & Study Methods

 9.2.2016 - Special PC Session: Order 1000

 8.11.2016 - Planning Committee Meeting

 7.14.2016 - Planning Committee Meeting

 4.29.2016 - Special PC Session: Order 1000 Lessons Learned

 2.23.2016 - Special PC Session: Order 1000 Lessons Learned

 8.28.2015 - Long Term Firm Transmission Service (PC)

 6.30.2015 - Long Term Firm Transmission Service (PC)

 3.27.2015 - Firm Injection Rights and Firm Withdrawal Rights Meeting (PC)

 2.12.2015 - Planning Committee Meeting

 8.15.2014 - Energy Storage Participation in RPM Discussion (PC) Meeting(Canceled)

 8.7.2014 - Planning Committee Meeting

 6.5.2014 - Planning Committee Meeting

 3.6.2014 - Planning Committee Meeting

 12.4.2013 - Energy Storage Participation in RPM Discussion (PC) Meeting

 7.12.2012 - Planning committee Meeting

 6.14.2012 - Planning Committee Meeting

 1.12.2012 - Planning Committee Meeting

 12.15.2011 - Planning Committee Meeting

Materials submitted to PJM by PJM Members or any other stakeholder for posting on PJM.com shall not imply support or endorsement by PJM Interconnection.