Planning

As of 9:33 a.m. EPT

Competitive Planning Process
  • The PJM competitive planning process affords non-incumbent transmission developers an opportunity to participate in the regional planning and expansion of the PJM bulk electric system.
  • 2019/20 Long-Term RTEP Window 1
     open11.12.2019 closed4.1.2020
    2019/20 Window 1
     open1.12.2019 closed4.15.2019
    2018/19 Long-Term RTEP Window 1
     open11.20.2018 closed3.1.2019
Planning News from Inside Lines
  • Synchrophasor Technology Grows At PJM
    To expand bulk electric system visibility and enable PJM to better detect High Impact Low Frequency dynamic events and perform its reliability obligations, PJM stakeholders endorsed an initiative to expand the installation of synchrophasor technology across the grid. Going forward, the installation of synchrophasor measurement devices will be required for new planning projects (meeting voltage […]
  • Latest Regional Transmission Expansion Plan Changes Approved
    The PJM Board of Managers on Sept. 23, approved the latest updates to the Regional Transmission Expansion Plan, or RTEP, which ensures the reliable flow of electricity for the region it serves. The changes include revisions to the scope of existing baseline projects, as well as the cancellation of an existing project. Costs for baseline […]
Queued Generation Fuel Mix
As of 9:26 a.m. EPT
Total:
65,015 MW
Renewables:
38,003 MW
Generation Interconnection Requests by Fuel Type
As of 9:26 a.m. EPT
Queues Timeline
As of 7.30.2020 2:49 p.m. EPT
Active Studies
As of 5:46 p.m. EPT
Criteria & Guidelines