Export to CSV

AG1-384 Transition Sort Retool Results -- Reprioritized to Transition Cycle #1

v1.00 released 2023-12-14 11:01

Twitty's Creek 115 kV

15.42 MW Capacity / 20.0 MW Energy

Introduction

In accordance with Tariff Part VII, Subpart B, section 304, PJM performed load flow analysis (Transition Sort Retool) on all AE1 through AG1 projects that have met eligibility requirements according to Tariff, Part VII, Subpart B, section 303. The purpose of this study is to determine whether a project would be classified as eligible for the Expedited Process (Fast Lane) or if it would be reprioritized to be studied as part of Transition Cycle #1 (TC1) using the criteria from the Expedited Process Eligibility section of Tariff Part VII, section 304. This is not a System Impact Study report.

Below are the results of the study, details of how the study was performed, criterion used in the evaluation of the Expedited Process vs. TC1 determination, and next steps in the interconnection process for your project.

Transition Cycle #1:

The AG1-384 project has not met the Expedited Process Eligibility requirements in Tariff Part VII, Subpart B, section 304 and will therefore be reprioritized to Transition Cycle #1. Please see "Transition Cycle #1 Rules" below.

Transition Sort Retool Study Process and Criteria:

In order to determine Expedited Process vs. Transition Cycle #1 classification, projects which met the Transition Eligibility requirements from Tariff Part VII, Subpart B, section 303 were studied on the base case model that was used for the original System Impact Study analysis. Both a summer peak and light load load flow analysis were performed. Projects that have cost allocation eligibility or are identified as the first to cause a system violation which requires the need for a Network Upgrade with a total estimated cost greater than $5 million will be reprioritized to Transition Cycle #1. All other projects will be eligible for the expedited procedures set forth in Tariff Part VII, Subpart B, section 304 (B).

Expedited Process Eligibility: OATT Tariff Part VII, section 304:

A project is not eligible for the expedited process if it has cost allocation eligibility or is identified as the first to cause, as determined according to Tariff, Part VI, section 217.3, for a Network Upgrade which has a total estimated cost of greater than $5,000,000. Such cost estimate will be based on Transmission Provider's most recently available data.

Not considered in the Transition Sorting: The cost of the Interconnection Facilities is not considered when determining a project's eligibility for the expedited process. Affected Systems upgrade costs are also not considered in the evaluation.

Transition Sort Retool Results Provided:

This report includes a list of:

  1. the overloaded flowgates (overloaded facilities + contingency pair) that the project contributes towards
  2. other interconnection projects that may also contribute to the overloaded facility, and
  3. the total estimated cost for any required Network Upgrades.

Important Notes:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

Next Steps for your project:

Transition Cycle #1 Rules:

Refer to Tariff Part VII, Subpart B, section 304 (C) for the Transition Cycle #1 Project Rules.

Transition Cycle #1 will start no later than one year from the Transition Start Date (July 10, 2023). Transition Cycle #1 will run simultaneously with the expedited process, however Transition Cycle #1, Phase III will not begin until all expedited process projects have been completed.

Projects that are reprioritized to Transition Cycle #1 will not need to re-apply to the Interconnection Cycle Process. Therefore, there is no Application Review Phase for Transition Cycle #1. The cycle process for Transition Cycle #1 includes three Study Phases and three Decision Points:

  1. Phase I System Impact Study and Decision Point I; and
  2. Phase II System Impact Study and Decision Point II; and
  3. Phase III System Impact Study and Decision Point III

Refer to Tariff Part VII, Subpart D, section 307 for the Transition Cycle #1 study process.

General

The Interconnection Customer (IC), has proposed a Solar; Storage generating facility located in the Dominion zone — Charlotte County, Virginia. The installed facilities will have a total capability of 20.0 MW with 15.42 MW of this output being recognized by PJM as Capacity.

Project Information
Queue Number AG1-384
Project Name Twitty's Creek 115 kV
Developer Name CV-Tollhouse LLC
State Virginia
County Charlotte
Transmission Owner Dominion
MFO 20.0 MW
MWE 20.0 MW
MWC 15.42 MW
Fuel Type Solar; Storage
Basecase Study Year 2024

Point of Interconnection

AG1-384 "Twitty's Creek 115 kV" will interconnect with the Dominion transmission system at Twitty's Creek substation, sharing the POI and Attachment Facilities as AG1-272.

 

Summer Peak Analysis

The Queue Project was evaluated as a 20.0 MW (Capacity 15.42 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential Summer peak period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
Summer Peak Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Initial Loading Final Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 3WILLIS-3FARMVIL 115.0 kV Ckt 1 line
314726 to 314691 ckt 1
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 251.12 % 258.61 % 205.86 B 532.38 15.42
DVP 3WILLIS-3FARMVIL 115.0 kV Ckt 1 line
314726 to 314691 ckt 1
DVP_P1-2: LN 1012-C
CONTINGENCY 'DVP_P1-2: LN 1012-C'
 OPEN BRANCH FROM BUS 965590 TO BUS 964240 CKT 1   /*AG1-427 TAP  115.0 - AG1-285 TAP  115.0
END
Single DC 214.69 % 222.18 % 205.86 B 457.39 15.42
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
DVP_P1-2: LN 235-A
CONTINGENCY 'DVP_P1-2: LN 235-A'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Single AC 204.93 % 207.78 % 182.64 B 379.49 5.3
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 169.58 % 173.5 % 182.64 B 316.88 7.17
DVP 3WILLIS-3FARMVIL 115.0 kV Ckt 1 line
314726 to 314691 ckt 1
Base Case Single AC 126.47 % 129.27 % 186.12 A 240.6 5.37
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
DVP_P1-2: LN 84
CONTINGENCY 'DVP_P1-2: LN 84'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Single AC 165.76 % 171.32 % 269.78 B 462.19 15.42
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P1-2: LN 298
CONTINGENCY 'DVP_P1-2: LN 298'
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Single AC 127.66 % 129.99 % 198.06 B 257.45 4.67
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
DVP_P1-2: LN 84
CONTINGENCY 'DVP_P1-2: LN 84'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Single AC 139.11 % 144.7 % 269.78 B 390.37 15.42
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
Base Case Single AC 119.75 % 121.69 % 176.81 A 215.17 3.43
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 121.96 % 124.87 % 198.06 B 247.32 5.77
DVP 3PAMPLIN-3WILLIS 115.0 kV Ckt 1 line
314713 to 314726 ckt 1
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 138.61 % 143.26 % 331.82 B 475.37 15.42
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
DVP_P1-2: LN 154-A
CONTINGENCY 'DVP_P1-2: LN 154-A'
 OPEN BRANCH FROM BUS 314713 TO BUS 314715 CKT 1   /*3PAMPLIN     115.0 - 3MADSONV     115.0
 OPEN BRANCH FROM BUS 314715 TO BUS 959310 CKT 1   /*3MADSONV     115.0 - AF2-222 TAP  115.0
 OPEN BUS 314715                                   /*3MADSONV     115.0
END
Single AC 132.41 % 137.94 % 269.78 B 372.13 15.42
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
Base Case Single AC 121.36 % 125.29 % 247.22 A 309.75 10.05
DVP 3MADSONV-3PAMPLIN 115.0 kV Ckt 1 line
314715 to 314713 ckt 1
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 122.77 % 126.94 % 369.42 B 468.95 15.42
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P1-2: LN 84
CONTINGENCY 'DVP_P1-2: LN 84'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Single AC 139.84 % 145.49 % 269.78 B 392.49 15.42
DVP 3PAMPLIN-3WILLIS 115.0 kV Ckt 1 line
314713 to 314726 ckt 1
DVP_P1-2: LN 1012-C
CONTINGENCY 'DVP_P1-2: LN 1012-C'
 OPEN BRANCH FROM BUS 965590 TO BUS 964240 CKT 1   /*AG1-427 TAP  115.0 - AG1-285 TAP  115.0
END
Single DC 116.02 % 120.66 % 331.82 B 400.38 15.42
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
DVP_P1-2: LN 298
CONTINGENCY 'DVP_P1-2: LN 298'
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Single AC 101.42 % 105.33 % 269.78 B 284.17 10.72
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
Base Case Single AC 97.03 % 100.97 % 247.22 A 249.62 10.05
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P1-2: LN 1045
CONTINGENCY 'DVP_P1-2: LN 1045'
 OPEN BRANCH FROM BUS 313898 TO BUS 314267 CKT 1   /*3BUTCHER CRK 115.0 - 3CHASCTY2    115.0
END
Single AC 98.78 % 100.04 % 198.06 B 198.14 2.49
DVP 3SEDGE HILL-6SEDGE HILL 115.0/230.0 kV Ckt 1 transformer
314696 to 314697 ckt 1
DVP_P1-3: 6SEDGE HILL-TX#2
CONTINGENCY 'DVP_P1-3: 6SEDGE HILL-TX#2'
 OPEN BRANCH FROM BUS 314696 TO BUS 314697 CKT 2   /*3SEDGE HILL  115.0 - 6SEDGE HILL  230.0
END
Single AC 102.51 % 103.55 % 242.52 B 251.12 2.52
DVP 3MADSONV-3PAMPLIN 115.0 kV Ckt 1 line
314715 to 314713 ckt 1
DVP_P1-2: LN 1012-C
CONTINGENCY 'DVP_P1-2: LN 1012-C'
 OPEN BRANCH FROM BUS 965590 TO BUS 964240 CKT 1   /*AG1-427 TAP  115.0 - AG1-285 TAP  115.0
END
Single DC 102.47 % 106.64 % 369.42 B 393.96 15.42
DVP AF2-222 TAP-3MADSONV 115.0 kV Ckt 1 line
959310 to 314715 ckt 1
DVP_P1-2: LN 1012-D
CONTINGENCY 'DVP_P1-2: LN 1012-D'
 OPEN BRANCH FROM BUS 964240 TO BUS 314681 CKT 1   /*AG1-285 TAP  115.0 - 3CHASCTY     115.0
END
Single DC 99.65 % 103.83 % 369.42 B 383.56 15.42
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P1-2: LN 298
CONTINGENCY 'DVP_P1-2: LN 298'
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Single AC 101.83 % 105.77 % 269.78 B 285.34 10.72
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
Base Case Single AC 97.35 % 101.31 % 247.22 A 250.47 10.05
DVP 6ROA VAL-6NORTHAMPTON 230.0 kV Ckt 1 line
314599 to 314266 ckt 1
DVP_P1-2: LN 238-A
CONTINGENCY 'DVP_P1-2: LN 238-A'
 OPEN BRANCH FROM BUS 314282 TO BUS 314435 CKT 1   /*6CARSON      230.0 - 6SAPONY      230.0
 OPEN BRANCH FROM BUS 314435 TO BUS 940480 CKT 1   /*6SAPONY      230.0 - AE2-033 TAP  230.0
 OPEN BUS 314435                                   /*6SAPONY      230.0
 OPEN BUS 923852                                   /*AB2-025 E    230.0
END
Single AC 99.86 % 100.05 % 559.3 B 559.56 1.07
DVP 6CAROLNA-6ROA VAL 230.0 kV Ckt 1 line
314561 to 314599 ckt 1
DVP_P1-2: LN 238-A
CONTINGENCY 'DVP_P1-2: LN 238-A'
 OPEN BRANCH FROM BUS 314282 TO BUS 314435 CKT 1   /*6CARSON      230.0 - 6SAPONY      230.0
 OPEN BRANCH FROM BUS 314435 TO BUS 940480 CKT 1   /*6SAPONY      230.0 - AE2-033 TAP  230.0
 OPEN BUS 314435                                   /*6SAPONY      230.0
 OPEN BUS 923852                                   /*AB2-025 E    230.0
END
Single AC 99.85 % 100.04 % 559.3 B 559.52 1.07
DVP 6ROA VAL-6NORTHAMPTON 230.0 kV Ckt 1 line
314599 to 314266 ckt 1
314435 6SAPONY 230 940480 AE2-033 TAP 230 1
CONTINGENCY '314435 6SAPONY       230  940480 AE2-033 TAP   230  1'  /* Auto-generated
  /* 314435 6SAPONY       230  940480 AE2-033 TAP   230  1
END
Single AC 99.84 % 100.03 % 559.3 B 559.46 1.07
DVP 6CAROLNA-6ROA VAL 230.0 kV Ckt 1 line
314561 to 314599 ckt 1
314435 6SAPONY 230 940480 AE2-033 TAP 230 1
CONTINGENCY '314435 6SAPONY       230  940480 AE2-033 TAP   230  1'  /* Auto-generated
  /* 314435 6SAPONY       230  940480 AE2-033 TAP   230  1
END
Single AC 99.83 % 100.02 % 559.3 B 559.42 1.07
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
DVP_P4-6: CHASE C T342
CONTINGENCY 'DVP_P4-6: CHASE C T342'
 OPEN BUS 313527   /*AB2-043 C      0.6
 OPEN BUS 313528   /*AB2-043 COL   34.5
 OPEN BUS 313529   /*3BLUE STONE  115.0
 OPEN BUS 314267   /*3CHASCTY2    115.0
 OPEN BUS 314518   /*3CHASC_1     115.0
 OPEN BUS 314681   /*3CHASCTY     115.0
 OPEN BUS 924022   /*AB2-043 E O1   0.6
END
Breaker DC 334.25 % 339.56 % 208.7 C 708.66 11.07
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 225.76 % 231.5 % 349.0 C 807.92 20.0
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 225.76 % 231.5 % 349.0 C 807.92 20.0
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P4-6: CHASE C T342
CONTINGENCY 'DVP_P4-6: CHASE C T342'
 OPEN BUS 313527   /*AB2-043 C      0.6
 OPEN BUS 313528   /*AB2-043 COL   34.5
 OPEN BUS 313529   /*3BLUE STONE  115.0
 OPEN BUS 314267   /*3CHASCTY2    115.0
 OPEN BUS 314518   /*3CHASC_1     115.0
 OPEN BUS 314681   /*3CHASCTY     115.0
 OPEN BUS 924022   /*AB2-043 E O1   0.6
END
Breaker DC 253.77 % 257.8 % 221.4 C 570.77 8.92
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 189.95 % 195.68 % 349.0 C 682.93 20.0
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 189.95 % 195.68 % 349.0 C 682.93 20.0
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P4-2: 29822
CONTINGENCY 'DVP_P4-2: 29822'
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 313868 TO BUS 314747 CKT 1   /*6CARTERV     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 314747 CKT 1   /*6BEARGRDN    230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 314747 CKT 2   /*6BEARGRDN    230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315191 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN G1  18.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315192 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN G2  18.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315193 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN S1  22.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314744 TO BUS 314747 CKT 1   /*3BREMO       115.0 - 6BREMO       230.0
 OPEN BUS 314326                                   /*6BEARGRDN    230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 314747                                   /*6BREMO       230.0
 OPEN BUS 315191                                   /*1BEARGRDN G1  18.0
 OPEN BUS 315192                                   /*1BEARGRDN G2  18.0
 OPEN BUS 315193                                   /*1BEARGRDN S1  22.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Breaker AC 191.66 % 194.16 % 221.4 C 429.87 6.05
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 189.95 % 195.68 % 349.0 C 682.93 20.0
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 189.95 % 195.68 % 349.0 C 682.93 20.0
DVP AG1-285 TAP-3CHASCTY 115.0 kV Ckt 1 line
964240 to 314681 ckt 1
DVP_P4-2: 8442
CONTINGENCY 'DVP_P4-2: 8442'
 CHANGE BUS 314713 LOAD BY -100 PERCENT            /*3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker AC 201.74 % 207.62 % 349.0 C 724.61 20.0
DVP 3TWITTYS-3CENTRAL 115.0 kV Ckt 1 line
314722 to 314679 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 148.07 % 153.8 % 349.0 C 536.76 20.0
DVP 3TWITTYS-3CENTRAL 115.0 kV Ckt 1 line
314722 to 314679 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 148.07 % 153.8 % 349.0 C 536.76 20.0
DVP 3CENTRAL-AG1-181 TAP 115.0 kV Ckt 1 line
314679 to 963320 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 146.98 % 152.71 % 349.0 C 532.95 20.0
DVP 3CENTRAL-AG1-181 TAP 115.0 kV Ckt 1 line
314679 to 963320 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 146.98 % 152.71 % 349.0 C 532.95 20.0
DVP AG1-427 TAP-AG1-285 TAP 115.0 kV Ckt 1 line
965590 to 964240 ckt 1
DVP_P4-2: 8442
CONTINGENCY 'DVP_P4-2: 8442'
 CHANGE BUS 314713 LOAD BY -100 PERCENT            /*3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker AC 165.41 % 171.33 % 349.0 C 597.96 20.0
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-6: CAROLIN T122
CONTINGENCY 'DVP_P4-6: CAROLIN T122'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314578 CKT 1   /*3CAROLNA     115.0 - 3HORNRTN     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314585 CKT 1   /*3CAROLNA     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 315126 CKT 1   /*3CAROLNA     115.0 - 1ROARAP2      14.4
 OPEN BRANCH FROM BUS 314559 TO BUS 315128 CKT 1   /*3CAROLNA     115.0 - 1ROARAP4      14.4
 OPEN BUS 314559                                   /*3CAROLNA     115.0
 OPEN BUS 314835                                   /*3CAROL_1     115.0
 OPEN BUS 315126                                   /*1ROARAP2      14.4
 OPEN BUS 315128                                   /*1ROARAP4      14.4
END
Breaker AC 150.33 % 151.83 % 199.0 B 302.14 3.08
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 159.48 % 164.21 % 349.0 C 573.11 16.52
DVP 3SEDGE HILL-6SEDGE HILL 115.0/230.0 kV Ckt 2 transformer
314696 to 314697 ckt 2
DVP_P4-2: 3202
CONTINGENCY 'DVP_P4-2: 3202'
 OPEN BRANCH FROM BUS 313852 TO BUS 314716 CKT 1   /*3WELCOTAP    115.0 - 3REEDY C     115.0
 OPEN BRANCH FROM BUS 313852 TO BUS 314718 CKT 1   /*3WELCOTAP    115.0 - 3S BOSTN     115.0
 OPEN BRANCH FROM BUS 313852 TO BUS 314724 CKT 1   /*3WELCOTAP    115.0 - 3WELCO       115.0
 OPEN BRANCH FROM BUS 314696 TO BUS 314697 CKT 1   /*3SEDGE HILL  115.0 - 6SEDGE HILL  230.0
 OPEN BRANCH FROM BUS 314696 TO BUS 314717 CKT 1   /*3SEDGE HILL  115.0 - 3SINAI       115.0
 OPEN BRANCH FROM BUS 314717 TO BUS 314718 CKT 1   /*3SINAI       115.0 - 3S BOSTN     115.0
 OPEN BUS 313852                                   /*3WELCOTAP    115.0
 OPEN BUS 314717                                   /*3SINAI       115.0
 OPEN BUS 314718                                   /*3S BOSTN     115.0
 OPEN BUS 314724                                   /*3WELCO       115.0
END
Breaker AC 156.89 % 158.05 % 279.1 C 441.11 3.26
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-2: 13002
CONTINGENCY 'DVP_P4-2: 13002'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
 OPEN BRANCH FROM BUS 314595 TO BUS 314600 CKT 1   /*3PL HILL     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314600 TO BUS 314615 CKT 1   /*3PLHITP      115.0 - 3SKIPPERS    115.0
 OPEN BUS 314595                                   /*3PL HILL     115.0
 OPEN BUS 314600                                   /*3PLHITP      115.0
END
Breaker AC 129.48 % 130.62 % 199.0 B 259.94 2.69
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-2: 102802
CONTINGENCY 'DVP_P4-2: 102802'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
END
Breaker AC 129.48 % 130.62 % 199.0 B 259.93 2.69
DVP AG1-181 TAP-AG1-427 TAP 115.0 kV Ckt 1 line
963320 to 965590 ckt 1
DVP_P4-2: 8442
CONTINGENCY 'DVP_P4-2: 8442'
 CHANGE BUS 314713 LOAD BY -100 PERCENT            /*3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker AC 167.59 % 173.71 % 349.0 C 606.26 20.0
DVP 3TWITTYS-3CENTRAL 115.0 kV Ckt 1 line
314722 to 314679 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 127.8 % 132.54 % 349.0 C 462.55 16.52
DVP 3CENTRAL-AG1-181 TAP 115.0 kV Ckt 1 line
314679 to 963320 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 126.71 % 131.45 % 349.0 C 458.75 16.52
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 123.45 % 124.87 % 406.0 C 506.98 5.93
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 121.3 % 122.71 % 406.0 C 498.19 5.91
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 119.9 % 121.31 % 406.0 C 492.5 5.91
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 111.64 % 113.05 % 406.0 C 459.0 5.93
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 109.97 % 111.38 % 406.0 C 452.19 5.91
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 108.57 % 109.97 % 406.0 C 446.5 5.91
DVP AG1-105 TAP-3MT LREL 115.0 kV Ckt 1 line
962560 to 314684 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 106.73 % 108.14 % 406.0 C 439.04 5.93
DVP AG1-105 TAP-3MT LREL 115.0 kV Ckt 1 line
962560 to 314684 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 105.08 % 106.48 % 406.0 C 432.3 5.91
DVP 3PLYWOOD-3SEDGE HILL 115.0 kV Ckt 1 line
313825 to 314696 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker AC 99.38 % 100.67 % 172.0 C 173.16 2.62
DVP AG1-105 TAP-3MT LREL 115.0 kV Ckt 1 line
962560 to 314684 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 103.67 % 105.08 % 406.0 C 426.61 5.91
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 8432
CONTINGENCY 'DVP_P4-2: 8432'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker DC 114.96 % 116.36 % 406.0 C 472.41 5.93
DVP 3TWITTYS-3CENTRAL 115.0 kV Ckt 1 line
314722 to 314679 ckt 1
DVP_P4-2: 8442
CONTINGENCY 'DVP_P4-2: 8442'
 CHANGE BUS 314713 LOAD BY -100 PERCENT            /*3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker AC 121.88 % 127.74 % 349.0 C 445.8 20.0
DVP 3CENTRAL-AG1-181 TAP 115.0 kV Ckt 1 line
314679 to 963320 ckt 1
DVP_P4-2: 8442
CONTINGENCY 'DVP_P4-2: 8442'
 CHANGE BUS 314713 LOAD BY -100 PERCENT            /*3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker AC 120.85 % 126.72 % 349.0 C 442.26 20.0
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 8432
CONTINGENCY 'DVP_P4-2: 8432'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker DC 103.62 % 105.02 % 406.0 C 426.38 5.93
DVP AG1-105 TAP-3MT LREL 115.0 kV Ckt 1 line
962560 to 314684 ckt 1
DVP_P4-2: 8432
CONTINGENCY 'DVP_P4-2: 8432'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker DC 98.69 % 100.08 % 406.0 C 406.33 5.93
DVP 6CARTERV-AC2-165 TAP 230.0 kV Ckt 1 line
313868 to 933500 ckt 1
DVP_P4-2: 2028T2054-A
CONTINGENCY 'DVP_P4-2: 2028T2054-A'
 OPEN BRANCH FROM BUS 314749 TO BUS 314765 CKT 1   /*6CHARLVL     230.0 - 6MTEAGLE     230.0
 OPEN BRANCH FROM BUS 314749 TO BUS 314772 CKT 1   /*6CHARLVL     230.0 - 6PROFFIT     230.0
 OPEN BRANCH FROM BUS 314759 TO BUS 314772 CKT 1   /*6HOLLYMD     230.0 - 6PROFFIT     230.0
 OPEN BRANCH FROM BUS 961060 TO BUS 314765 CKT 1   /*AF2-397 TAP  230.0 - 6MTEAGLE     230.0
 OPEN BUS 314765                                   /*6MTEAGLE     230.0
 OPEN BUS 314772                                   /*6PROFFIT     230.0
END
Breaker AC 99.98 % 100.28 % 980.0 C 982.79 2.94
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P7-1: LN 22-90
CONTINGENCY 'DVP_P7-1: LN 22-90'
 OPEN BRANCH FROM BUS 314265 TO BUS 314584 CKT 1   /*3FIVEFORKSDP 115.0 - 3LITTLTN     115.0
 OPEN BRANCH FROM BUS 314265 TO BUS 314673 CKT 1   /*3FIVEFORKSDP 115.0 - 3PALMERSPRNG 115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314585 CKT 1   /*3CAROLNA     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314571 TO BUS 316125 CKT 1   /*3EATON F     115.0 - AC1-054 TAP  115.0
 OPEN BRANCH FROM BUS 314584 TO BUS 314585 CKT 1   /*3LITTLTN     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314702 TO BUS 316125 CKT 1   /*3KERR        115.0 - AC1-054 TAP  115.0
 OPEN BUS 314265                                   /*3FIVEFORKSDP 115.0
 OPEN BUS 314571                                   /*3EATON F     115.0
 OPEN BUS 314584                                   /*3LITTLTN     115.0
 OPEN BUS 314585                                   /*3L GASTN     115.0
 OPEN BUS 316125                                   /*AC1-054 TAP  115.0
 OPEN BUS 316126                                   /*AC1-054 MAIN 115.0
 OPEN BUS 316127                                   /*AC1-054 COL2  22.9
 OPEN BUS 316128                                   /*AC1-054 COL1  22.9
 OPEN BUS 316129                                   /*AC1-054 C      0.4
 OPEN BUS 925785                                   /*AC1-054 E      0.4
END
Tower AC 147.9 % 149.38 % 199.0 B 297.26 3.04

Light Load Analysis

The Queue Project was evaluated as a 20.0 MW (Capacity 15.42 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

(No impacts were found for this analysis)

System Reinforcements

The table below lists all network upgrades which resolve the identified overloaded facilities in this report.

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
  3. Reinforcements previously identified by Transmission Owners for violations on lower voltage facilities are included in this report. Transmission Owner analysis will be updated as part of the Expedited Process and Transition Cycle 1 retools.
System Reinforcements
RTEP ID Title Total Cost
n7766 Rebuild 115 kV Line #1012 From AD2-063 Tap-AG1-181 Tap-Central-Twitty's Creek-AF2-222 Tap-Madsonav $24,835,000
n7821 Wreck and rebuild 115 kV line #1012 from Chase City to AG1-285 Tap $13,400,000
n7819 Wreck and rebuild 115 kV line #84 from Willis to Farmville to a double circuit. $20,050,000
n6246 Add additional 230/115 kV transformer (#3) for Circuit 1 at Farmville substation $6,000,000
n7550 Add additional 230/115 kV transformer (#4) for Circuit 2 at Farmville substation. $6,000,000
(TBD) Reconductor 20 miles with single 795 ACSS-TW per phase, replace breaker, disconnect switches, wave trap, line switch $60,000,000
s2614 For DEV portion, rebuild 4.7 miles of 115 kV Line 45 from Kerr Dam to GW King Tap with 768 ACSS. $6,123,000
n7667 Rebuild 115 kV Line #33 from Mt. Laurel -AC1-105 Tap -Sedge Hill. $16,590,000
n7664 Rebuild 115 kV Line#33 From AG1-105 Tap -Mt. Laurel. $3,850,000
n7827 Rebuild 115 kV line #154 from Madisonville to Pamplin. $7,905,000
n7826 Rebuild 115 kV line #84 from Willis Mountain to Pamplin. $20,730,000
n7680 Rebuild 6.65 miles of 115 kV Line 151 from Plywood to Sedge Hill with 636 ACSR. $8,645,000
n7687 Add additional 230/115 kV transformer at Sedge Hill substation. $6,000,000
n8254 Rebuild 4.06 miles of 230 kV Line 2060 from Carolina to Roanoke Valley with 2-636 ACSR. $10,150,000
n8256 Rebuild 230 kV Line #2027 from Carterville to AC2-165 Tap. $19,175,000
n8253 Rebuild 2.87 miles of 230 kV Line 2012 from Roanoke Valley to Northampton with 2-636 ACSR. $7,175,000
n7823 Wreck and rebuild 115 kV line#1012 from AG1-427 Tap to AG1-285 Tap $3,150,000

Attachments

Conclusion

The Transition Sort load flow retool results indicate that AG1-384 is not eligible for the Expedited Process per PJM Tariff Part VII, Subpart B, section 304 (A) will be reprioritized to Transition Cycle #1. See next steps for your project in the "Introduction" section above.