Planning

Backbone Projects

Backbone Projects

Baseline Key Backbone Facilities

PJM baseline upgrade projects are implemented to resolve reliability criteria violations. PJM “backbone” projects are a subset of baseline upgrade projects that have been given the informal designation of “backbone” due to their high degree of visibility within the stakeholder community. Backbone upgrades are on the EHV (Extra High Voltage) system and typically resolve a wide range of reliability criteria violations and market congestion issues. Their permitting and construction status is also typically tracked closely by the stakeholders. This area of the PJM website is intended to facilitate the communication of the status of the backbone upgrades.

Construction Status Database Area

Upgrades to the transmission system are part of PJM's Regional Transmission Expansion Planning (RTEP) process. An outcome of the RTEP process are these Transmission System Upgrades:

  • Expected (normal / emergency) Rating: expected normal continuous rating and long term 4 hour emergency rating based on summer 95 degree F temperature basis

Percent Complete - The percentages should be correlated to the following milestones:

  • EP Status: 0% - 25% - Engineering and Planning (includes engineering, detailed design, materials procurement, resource planning)
  • UC Status:
    • 26% - 100% - Under Construction
    • 26% - 90% - Construction Activities
    • 91% - 100% - Testing and Inspection

Note: In order to properly use this page you must have ActiveX enabled for your browser. Click here for instructions on how to enable ActiveX for Internet Explorer 6.0 and higher.

Engineering / Planning
Under Construction
On Hold - network upgrades associated with a queue project suspension or baselines impacted by an ongoing retool
In-Service - project complete, fully energized and planning criteria met
Help  Info XLS  XML

../../../pub/account/gen-queues/TOUP_planned_backbone.xml
[["b0210.1","5.31.2015","5.31.2017",["Orchard - Churchtown","Install","Transmission Line","Orchard-Cumberland - Install second 230kV line","230","650/800/892 (each)","07/01/2016"],"AEC",["2009","2007","2007-rtep-baseline-assessment","Baseline Load Growth Deliverablility & Reliability","09/22/2005",""],"UC:UC","NJ","70","13.00",["Unknown","PJM MA"]],["b1016","6.1.2017","6.1.2017",["Graceton - Begley","Build","Transmission Line","Rebuild Graceton - Bagley 230 kV as double circuit line using 1590 ACSR. Terminate new line at Graceton with a new circuit breaker.","230","648/802/0(each line)","01/06/2017"],"BGE",["2014","2009","2009-rtep-baseline-assessment","Baseline Load Growth Deliverablility & Reliability","08/02/2009","01/10/2013"],"UC:UC","MD","80","42.60",["Unknown","PJM MA"]],["b1032.1","6.1.2014","12.18.2015",["Marquis-Bixby","Construct","Substation","Construct a new 345/138/69 kV station on the Marquis - Bixby 345 kV line near the intersection with Ross - Highland 69 kV","345/138/69","","11/23/2016"],"AEP",["","2009","2009-rtep-baseline-assessment","Baseline Load Growth Deliverablility & Reliability","09/16/2009","04/12/2012"],"UC:UC","OH","90","89.30",["Unknown","PJM WEST"]],["b1086","6.1.2017","6.1.2017",["Constitution St","Build","Substation","Build a new 115 kV switching station between Orchard St. and Monument St.","115","","07/19/2016"],"BGE",["","2009","2009-rtep-baseline-assessment","Baseline Load Growth Deliverablility & Reliability","10/22/2009",""],"UC:UC","-","50","26.00",["Not Specified","PJM MA"]],["b1118","6.1.2011","10.9.2016",["Beaver Valley","Replace","Circuit Breaker","Replace Beaver Valley 138kV breaker '1B & 3B SS tfmr' with 63kA rated breaker","138","63kA","07/18/2016"],"DL",["2014","2009","2009-rtep-baseline-assessment","Baseline Load Growth Deliverablility & Reliability","11/18/2009",""],"EP:EP","PA","0","0.40",["Unknown","PJM WEST"]],["b1329","5.1.2015","12.30.2016",["Sterling Park/BECO","Install","Circuit Breaker","Install line-tie breakers at Sterling Park substation and BECO substation","230","","07/01/2016"],"Dominion",["","","","TO Criteria Violation","08/25/2010",""],"UC:UC","-","30","4.25",["Not Specified","PJM SOUTH"]],["b1465.1","6.1.2015","6.1.2017",["Sullivan","Install","Transformer","Add a 3rd 2250 MVA 765/345 kV transformer at Sullivan station and 345 kV switching changes at Sullivan/Breed","765/345","2033/ 2608/ 0","10/28/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","10/28/2010",""],"UC:UC","IN","20","37.00",["Unknown","PJM WEST"]],["b1465.5","6.1.2015","6.1.2017",["Sullivan","Change","Substation","Make switching changes at Sullivan 765 kV station","765","","10/28/2016"],"AEP",["0","","","Baseline Load Growth Deliverablility & Reliability","10/28/2010",""],"UC:UC","IN","90","29.50",["Unknown","PJM WEST"]],["b1533","5.31.2015","10.1.2016",["Lycoming - Lock Haven","Rebuild","Transmission Line","Rebuild Lycoming-Lock Haven #1 and Lycoming-Lock Haven #2 69kV lines","69","97/ 124/ 0(each)","07/01/2016"],"PPL",["","","","TO Criteria Violation","03/02/2011",""],"UC:UC","PA","21","23.00",["Unknown","PJM MA"]],["b1572","6.1.2018","6.1.2018",["West Milton - Eldean","Construct","Transmission Line","Construct a new 138 kV line from West Milton to Eldean","138","307 /382 /382","07/11/2016"],"Dayton",["","","","Baseline Load Growth Deliverablility & Reliability","06/09/2011",""],"EP:EP","OH","10","16.00",["Unknown","PJM WEST"]],["b1659","6.1.2015","12.12.2016",["Sorenson","Build","Transformer","Build a Sorenson 765/345 kV transformer and 345 kV work at Sorenson","765/345","2640/ 3040/ 0","11/23/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","08/04/2011","01/12/2012"],"UC:UC","IN","90","45.00",["Unknown","PJM WEST"]],["b1660.1","12.31.2016","9.24.2017",["Cloverdale","Reconfiguration","Circuit Breaker","Cloverdale: install 6 765kV breakers, which includes incremental work for 2 additional breakers (total of 6 installed), reconfigure and relocate miscellaneous facilities, establish 500kV station and 500kV tie with 765kV station.","765/500","","11/29/2016"],"AEP",["0","","","Baseline Load Growth Deliverablility & Reliability","02/07/2013",""],"UC:UC","VA","0","85.00",["Unknown","PJM WEST"]],["b1696","6.1.2017","2.1.2020",["Idylwood","Install","Substation","Install a breaker and a half scheme with a minimum of eight 230 kV breakers for five existing lines at Idylwood 230 kV","230","","08/03/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","06/09/2011","07/26/2016"],"EP:EP","VA","10","80.00",["Unknown","PJM SOUTH"]],["b1696.1","6.1.2017","5.31.2019",["Idylwood","Replace","Circuit Breaker","Replace the Idylwood 230 kV ’25112’ breaker with 50 kA breaker","230","50 kA","12/12/2016"],"Dominion",["","","","Short Circuit","07/14/2016","07/26/2016"],"EP:EP","VA","0","0.35",["Unknown","PJM SOUTH"]],["b1696.2","6.1.2017","5.31.2019",["Idylwood","Replace","Circuit Breaker","Replace the Idylwood 230 kV ’209712’ breaker with 50 kA breaker","230","50 kA","12/12/2016"],"Dominion",["","","","Short Circuit","07/14/2016","07/26/2016"],"EP:EP","VA","0","0.35",["Unknown","PJM SOUTH"]],["b1792","6.1.2016","12.15.2018",["Chase City - Halifax","Rebuild","Transmission Line","Rebuild Line #33 Chase City - Halifax 230kV to a minimum summer emergency rating of 300 MVA","230","300 MVA (SE)","12/05/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","10/28/2011","07/26/2016"],"UC:UC","VA","75","50.20",["Unknown","PJM SOUTH"]],["b1792.1","6.1.2016","12.15.2018",["Halifax","Relocate","Substation","Relocate Halifax switching station out of flood plain","230","","01/20/2017"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b1792.2","6.1.2016","12.15.2018",["Sedge Hill","Build","Substation","Build a new switching station, to be called Sedge Hill, with 230 kV four breaker ring and a 115 kV breaker and a half scheme with seven breakers","230/115","","01/20/2017"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b1806","12.31.2018","12.31.2018",["Wagner","Rebuild","Substation","Rebuild Wagner 115kV substation to 80kA","115","80 kA","07/18/2016"],"BGE",["","","","Baseline Load Growth Deliverablility & Reliability","12/15/2011",""],"EP:EP","MD","0","5.80",["Unknown","PJM MA"]],["b1817","6.1.2016","5.31.2017",["East Elkhart","Install","Circuit Breaker","Install (3) 345 kV circuit breakers at East Elkhart station in ring bus designed as a breaker and half scheme","345","","05/31/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","01/12/2012",""],"EP:EP","IN","0","6.00",["Unknown","PJM WEST"]],["b1853.1","6.1.2016","",["Locust Grove","Construct","Distribution Line","Construct a new Locust Grove 34.5 kV feeder","34.5","","07/07/2016"],"JCPL",["","","","TO Criteria Violation","03/08/2012",""],"EP:EP","-","0","0.00",["Not Specified","PJM MA"]],["b1875","6.1.2015","12.14.2018",["Bradley - Tower 117 - McClung","Build","Transmission Line","Build 25 miles of new 138 kV line from Bradley Station through Tower 117 Station and terminating at McClung 138 kV station. Existing 69 kV distribution transformers will be replaced with 138 kV transf","138","296 /413 /0","11/07/2016"],"AEP",["","","","Generator Deactivation","03/19/2012",""],"EP:EP","WV","20","50.00",["Unknown","PJM WEST"]],["b1900","6.1.2015","5.31.2018",["Chichester - Linwood","Add","Transmission Line","Add a 3rd 230 kV transmission line between Chichester and Linwood substations and remove the Linwood SPS","230","","08/03/2016"],"PECO",["","","","Generator Deactivation","05/10/2012","03/07/2013"],"UC:UC","PA","30","51.40",["Unknown","PJM MA"]],["b1905.1","6.1.2015","12.30.2018",["Surrey/Skiffes Creek","Build","Transmission Line","Surry to Skiffes Creek 500 kV Line (7 miles overhead)","500","3464/3464/4200","11/23/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012","11/07/2013"],"UC:UC","VA","30","110.05",["Unknown","PJM SOUTH"]],["b1905.3","6.1.2015","12.30.2018",["Skiffes Creek","Transformer","Substation","Skiffes Creek 500-230 kV Tx and Switching Station","500/230","937.7 /967.2 /1036.4","11/23/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","30","59.83",["Unknown","PJM SOUTH"]],["b1905.4","6.1.2016","1.31.2018",["Skiffes Creek/Whealton","New","Transmission Line","New Skiffes Creek - Whealton 230 kV line","230","1047/1047/1204","02/19/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","0","2.45",["Unknown","PJM SOUTH"]],["b1905.5","6.1.2016","1.31.2018",["Whealton","New","Circuit Breaker","Whealton 230 kV breakers","230","","02/19/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","0","0.32",["Unknown","PJM SOUTH"]],["b1905.6","6.1.2016","1.31.2018",["Yorktown","work","Substation","Yorktown 230 kV work","230","","02/19/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","0","0.12",["Unknown","PJM SOUTH"]],["b1905.7","6.1.2016","1.31.2018",["Lanexa","work","Substation","Lanexa 115 kV work","115","","06/02/2015"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","0","0.05",["Unknown","PJM SOUTH"]],["b1905.9","6.1.2016","1.31.2018",["Kings Mill, Peninmen, Toano, Waller, Warwick","work","Substation","Kings Mill, Peninmen, Toano, Waller, Warwick","115","","06/02/2015"],"Dominion",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","VA","0","0.03",["Unknown","PJM SOUTH"]],["b1912","6.1.2018","1.31.2017",["Landstown, Chesapeake, Fentress, Lynnhaven","Install","Reactive Device","Install four +/- 125 MVAR STATCOM at Landstown, Chesapeake, Fentress, and Lynnhaven","230","500 MVAR","10/31/2016"],"Dominion",["","","","Generator Deactivation","04/27/2012","01/07/2016"],"UC:UC","VA","67","77.00",["Unknown","PJM SOUTH"]],["b1963","12.1.2013","6.1.2017",["Waterford/Muskingum","Build","Transmission Line","Build approximately 1 mile of circuit comprising of 2-954 ACSR to get the rating of Waterford-Muskinum 345 kV higher","345","2584 /2584 /0","12/04/2015"],"AEP",["","","","Generator Deactivation","04/27/2012",""],"UC:UC","-","80","3.50",["Not Specified","PJM WEST"]],["b1994","6.1.2015","6.1.2018",["Lewis Run/Farmers Valley","Convert","Transmission Line","Convert Lewis Run-Farmers Valley to 230 kV using 1033.5 ACSR conductor. Project to be completed in conjunction with new Pierce Book Valley 345/230 kV transformation","230/115","546 /666 /666","05/27/2016"],"PENELEC",["","","","Generator Deactivation","04/27/2012",""],"EP:EP","PA","10","46.80",["Unknown","PJM MA"]],["b2006.1","6.1.2015","5.11.2017",["Lauschtown","Install","Substation","Install Lauschtown 500/230 kV substation (500 kV portion) - Includes 500 kV yard work, 500 kV CBs, and 500 kV line tie-in","500","","11/17/2016"],"PPL",["","","","Generator Deactivation","04/27/2012","12/03/2015"],"UC:UC","PA","10","41.08",["Unknown","PJM MA"]],["b2006.1.1","6.1.2015","6.1.2017",["Lauschtown, TMI - Hosensack","Loop","Transmission Line","Loop the 2026 (TMI - Hosensack 500 kV) line in to the Lauschtown substation and upgrade relay at TMI 500 kV","500","2505/2598/0","11/17/2016"],"ME",["","","","Generator Deactivation","06/05/2014",""],"EP:EP","-","20","5.25",["Not Specified","PJM MA"]],["b2006.2","5.1.2016","5.11.2017",["Lauschtown","Build","Substation","Construct a new 230/69 kV Lauschtown substation. The South Akron - Berks 230 kV line and South Akron - South Reading 230 kV line will terminate into the new 230 kV yard at Lauschtown","230/69","","08/25/2016"],"PPL",["","","","Baseline Load Growth Deliverablility & Reliability","03/02/2011","12/03/2015"],"EP:EP","PA","0","32.53",["Unknown","PJM MA"]],["b2006.3","5.1.2016","5.11.2017",["Lauschtown","Build","Transmission Line","Construct new 69/138 kV transmission from Lauschtown 230/69 kV sub to Brecknock and Honeybrook areas","69/138","","07/01/2016"],"PPL",["","","","Baseline Load Growth Deliverablility & Reliability","03/02/2011","12/03/2015"],"EP:EP","PA","0","19.87",["Unknown","PJM MA"]],["b2020","6.1.2015","12.30.2016",["Amos - Kanawah River","Rebuild","Transmission Line","Rebuild Amos - Kanawah River 138 kV corridor","138","897/ 897/ 0","11/23/2016"],"AEP",["","","","Generator Deactivation","05/10/2012","06/14/2012"],"UC:UC","WV","95","150.00",["Unknown","PJM WEST"]],["b2047","5.1.2015","5.1.2015",["Greenlawn","Replace","Relay","Replace relay at Greenlawn","138","201 /201 /0","10/17/2016"],"AEP",["","","","Generator Deactivation","06/14/2012",""],"EP:EP","OH","0","0.10",["Unknown","PJM WEST"]],["b2135","6.1.2015","12.18.2016",["Falling Branch - Merrimac","Build","Transmission Line","Build a new 138 kV line from Falling Branch to Merrimac and add a 138/69 kV transformer at Merrimac Station","138","296 /413 /0","07/01/2016"],"AEP",["","","","TO Criteria Violation","08/29/2012",""],"UC:UC","VA","40","25.00",["Unknown","PJM WEST"]],["b2139.1","6.1.2015","",["Eagle Point","Upgrade","Bus","Upgrade the required terminal equipment at Eagle Point on the Mickleton - Gloucester 230 kV circuit","230","","06/14/2016"],"Eagle Point",["","","","Generator Deactivation","09/13/2012",""],"EP:EP","NJ","0","0.00",["Unknown","PJM MA"]],["b2141","6.1.2017","6.1.2017",["Byron - Wayne","Construct","Transmission Line","Construct a new Byron to Wayne 345 kV circuit","345","1679/ 2011/ 2280","01/13/2017"],"ComEd",["","","","Baseline Load Growth Deliverablility & Reliability","06/14/2012","09/13/2012"],"UC:UC","IL","85","109.60",["Unknown","Not Specified"]],["b2141.1","6.1.2017","6.1.2017",["Byron","Remove","Special Protection Scheme","Remove Byron SPS upon completion of Byron - Wayne 345 kV","345","","01/13/2017"],"ComEd",["","","","Operational Performance","08/08/2013",""],"EP:EP","-","25","0.00",["Not Specified","PJM WEST"]],["b2145","6.1.2017","6.1.2017",["Richmond","Replace","Conductor","Replace two sections of conductor inside Richmond substation","230","","08/03/2016"],"PECO",["","","","Baseline Load Growth Deliverablility & Reliability","10/12/2012",""],"EP:EP","PA","5","0.03",["Unknown","PJM MA"]],["b2166","6.1.2016","12.31.2016",["Sleepy Hollow","Reconductor","Conductor","Reconductor the Millville – Sleepy Hollow 138kV 4.25 miles of 556 ACSR with 795 ACSR, upgrade line risers at Sleepy Hollow, and change 1200 A CT tap at Millville to 800","138","281 /296 /296","11/07/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","11/05/2012",""],"UC:UC","-","60","2.70",["Not Specified","PJM WEST"]],["b2186","5.31.2017","6.1.2017",["Earleys","Install","Transformer","Install a 2nd 230-115kV transformer at Earleys connected to the existing 115kV and 230kV ring busses. Add a 115 kV breaker and 230kV breaker to the ring busses","230/115","187 /208 /228","11/07/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","11/05/2012","07/26/2016"],"EP:EP","-","5","13.00",["Not Specified","PJM SOUTH"]],["b2186.1","5.31.2017","6.1.2017",["Earleys","Replace","Substation","Replace four wood pole structures at Earleys 230 kV, replace two spans of conductor on line #2012 Earleys - Roanoke Valley 230 kV, and add new battery enclosure.","230","608 MVA (STE)","08/03/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b2216","6.1.2016","6.1.2017",["Belmont","Install","Bus","Willow Island: Install a new 138 kV cross bus at Belmont Substation and reconnect and reconfigure the 138 kV lines to facilitate removal of the equipment at Willow Island switching station","138","","08/02/2016"],"APS",["","","","Generator Deactivation","03/07/2013",""],"UC:UC","WV","40","2.00",["Unknown","PJM WEST"]],["b2222.2","6.1.2017","6.1.2017",["Eddystone","Increase Rating","Circuit Breaker","Increase Rating of Eddystone #415 138kV Breaker","138","50kA","08/03/2016"],"PECO",["","","","Baseline Load Growth Deliverablility & Reliability","11/04/2013",""],"EP:EP","-","25","0.50",["Not Specified","PJM MA"]],["b2229","12.1.2016","12.1.2016",["Dequine","Install","Reactive Device","Install a 300 MVAR reactor at Dequine 345 kV","345","300 MVAR","11/07/2016"],"AEP",["","","","Operational Performance","05/09/2013","07/11/2013"],"EP:EP","-","25","8.00",["Not Specified","PJM WEST"]],["b2231","12.1.2015","5.26.2017",["Dumont","Install","Reactive Device","Install 765 kV reactor breaker at Dumont 765 kV substation on the Dumont - Wilton Center line","765","","11/29/2016"],"AEP",["","","","Operational Performance","05/09/2013","07/11/2013"],"UC:UC","IN","10","5.00",["Unknown","PJM WEST"]],["b2236","12.31.2017","12.31.2017",["Buckingham","Install","Reactive Device","50 MVAR reactor at Buckingham 230 kV","230","50 MVAR","08/03/2016"],"PECO",["","","","Operational Performance","05/09/2013","07/11/2013"],"EP:EP","-","5","3.90",["Not Specified","PJM MA"]],["b2269","6.1.2018","6.1.2018",["Susquehanna - Jenkins","Rebuild","Transmission Line","Rebuild approximately 23.7 miles of the Susquehanna - Jenkins 230kV circuit. This replaces a temporary SPS that is already planned to mitigate the violation until this solution is implemented","230","494/ 624/ 0","07/25/2016"],"PPL",["","","","Baseline Load Growth Deliverablility & Reliability","04/11/2013","08/08/2013"],"EP:EP","PA","0","109.50",["Unknown","PJM MA"]],["b2269.1","3.31.2017","12.31.2016",["Stanton","Rearrange","Transmission Line","Rearrange the 230 kV lines out of the Stanton substation.","230","","11/01/2016"],"PPL",["","","","Baseline Load Growth Deliverablility & Reliability","08/08/2013","01/07/2016"],"EP:EP","-","0","2.86",["Not Specified","PJM MA"]],["b2269.2","12.31.2016","3.1.2017",["Mountain","Upgrade","Relay","Upgrade relays at Mountain 230 kV substation.","230","","10/10/2016"],"UGI",["","","","Baseline Load Growth Deliverablility & Reliability","01/07/2016",""],"EP:EP","-","0","0.00",["Not Specified","PJM MA"]],["b2423","6.1.2018","10.6.2017",["Wyoming","Install","Reactive Device","Install a 300 MVAR shunt reactor at AEP's Wyoming 765 kV station","765","300 MVAR","11/29/2016"],"AEP",["","","","Operational Performance","11/07/2013","06/23/2016"],"UC:UC","-","5","25.00",["Not Specified","PJM WEST"]],["b2436","6.1.2015","6.1.2018",["Linden - Marion - Bergen","Convert","Transmission Line (Double Circuit)","PSEG Northern NJ 345 kV Project","345","","03/09/2016"],"PSEG",["","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013",""],"UC:UC","-","26","0.00",["Not Specified","PJM MA"]],["b2436.21","6.1.2015","6.1.2018",["Marion - Bayonne","Convert","Transmission Line","Convert the Marion - Bayonne 'L' 138 kV circuit to 345 kV and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","46","62.71",["Not Specified","PJM MA"]],["b2436.22","6.1.2015","6.1.2018",["Marion - Bayonne","Convert","Transmission Line","Convert the Marion - Bayonne 'C' 138 kV circuit to 345 kV and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","56","47.48",["Not Specified","PJM MA"]],["b2436.33","6.1.2015","6.1.2018",["Bayway - Bayonne","Construct","Transmission Line","Construct a new Bayway - Bayonne 345 kV circuit and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","32","166.32",["Not Specified","PJM MA"]],["b2436.34","6.1.2015","6.1.2018",["North Ave - Bayonne","Construct","Transmission Line","Construct a new North Ave - Bayonne 345 kV circuit and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"EP:EP","-","19","137.87",["Not Specified","PJM MA"]],["b2436.50","6.1.2015","6.1.2018",["North Ave - Airport","Convert","Transmission Line (Double Circuit)","Construct a new North Ave - Airport 345 kV circuit and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","22","74.97",["Not Specified","PJM MA"]],["b2436.60","6.1.2015","6.1.2018",["North Ave - Bayway","Convert","Transmission Line (Double Circuit)","Relocate the underground portion of North Ave - Linden 'T' 138 kV circuit to Bayway, convert it to 345 kV, and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","25","50.20",["Not Specified","PJM MA"]],["b2436.70","6.1.2015","6.1.2018",["Airport - Bayway","Convert","Transmission Line (Double Circuit)","Construct a new Airport - Bayway 345 kV circuit and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","46","94.06",["Not Specified","PJM MA"]],["b2436.81","6.1.2015","12.19.2017",["Linden - North Ave","Relocate","Transmission Line","Relocate the overhead portion of Linden - North Ave 'T' 138 kV circuit to Bayway, convert it to 345 kV, and any associated substation upgrades","345","","03/09/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","07/09/2015"],"UC:UC","-","49","50.28",["Not Specified","PJM MA"]],["b2436.83","6.1.2015","12.19.2017",["Bayway - Linden","Convert","Transmission Line","Convert the Bayway - Linden 'Z' 138 kV circuit to 345 kV and any associated substation upgrades","345","","03/09/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","07/09/2015"],"UC:UC","-","49","50.28",["Not Specified","PJM MA"]],["b2436.84","6.1.2015","6.1.2017",["Bayway - Linden","Convert","Transmission Line","Convert the Bayway - Linden 'W' 138 kV circuit to 345 kV and any associated substation upgrades","345","","03/09/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","07/09/2015"],"UC:UC","-","54","49.43",["Not Specified","PJM MA"]],["b2436.85","6.1.2015","6.1.2017",["Bayway - Linden","Convert","Transmission Line","Convert the Bayway - Linden 'M' 138 kV circuit to 345 kV and any associated substation upgrades","345","","03/09/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","07/09/2015"],"UC:UC","-","54","49.43",["Not Specified","PJM MA"]],["b2436.90","6.1.2015","6.1.2018",["Farragut - Hudson","Relocate","Transmission Line","Relocate Farragut - Hudson 'B' and 'C' 345 kV circuits to Marion 345 kV and any associated substation upgrades","345","","12/22/2016"],"PSEG",["0","","","Baseline Load Growth Deliverablility & Reliability","11/07/2013","12/15/2016"],"UC:UC","-","90","34.70",["Not Specified","PJM MA"]],["b2443","6.1.2020","5.31.2019",["Glebe - Station C","Construct","Transmission Line (Underground)","Construct new underground 230 kV line from Glebe to Station C, rebuild Glebe Substation","230","1047 /1047 /1047","07/05/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","12/11/2013","01/09/2014"],"EP:EP","-","5","155.40",["Not Specified","PJM SOUTH"]],["b2443.1","6.1.2020","5.31.2018",["Idylwood","Replace","Circuit Breaker","Replace the Idylwood 230 kV breaker '203512' with 50kA breaker","230","","07/05/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/10/2014",""],"EP:EP","-","0","0.26",["Not Specified","PJM SOUTH"]],["b2443.2","6.1.2020","5.31.2018",["Ox","Replace","Circuit Breaker","Replace the Ox 230 kV breaker '206342' with 63kA breaker","230","","07/05/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/10/2014",""],"EP:EP","-","0","0.27",["Not Specified","PJM SOUTH"]],["b2443.3","6.1.2020","6.1.2020",["Glebe - Station C","Install","Phase Angle Regulator","Construct 230 kV high-side bus and install 800 MVA PAR at Potomac River 230 kV (Station C)","230","","07/19/2016"],"PEPCO",["","","","Baseline Load Growth Deliverablility & Reliability","11/11/2014",""],"EP:EP","-","0","10.00",["Not Specified","PJM MA"]],["b2449","6.1.2017","5.1.2017",["Meadow Lake - Reynolds","Rebuild","Transmission Line","Rebuild the 7-mile 345 kV line between Meadow Lake and Reynolds 345 kV stations","345","971 /1195 /0","10/28/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","01/09/2014",""],"EP:EP","-","5","15.00",["Not Specified","PJM WEST"]],["b2458.6","5.1.2016","12.31.2018",["Carolina - Woodland","Replace","Transmission Line","Replace broken strands at multiple locations along Carolina – Woodland 115kV circuit discovered during construction","115","","08/03/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","7.00",["","PJM SOUTH"]],["b2458.7","5.1.2016","12.31.2018",["Carolina - Jackson","Reconductor","Transmission Line","Reconductor 22.4 miles of Carolina–Jackson 115kV for minimum 174 MVA summer STE rating using existing structures","115","174 MVA (STE)","08/03/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b2496","6.1.2021","6.1.2021",["Franklin","Replace","Transformer","Replace Franklin 115/34.5 kV transformer #2 with 90 MVA transformer","115/34.5","90 MVA","07/13/2016"],"JCPL",["","","","TO Criteria Violation","06/24/2014",""],"EP:EP","-","5","3.00",["Not Specified","PJM MA"]],["b2501","6.1.2014","6.1.2016",["Yager","Construct","Substation","Construct a new 138/69 kV Yager station","138/69","","11/23/2016"],"AEP",["","","","TO Criteria Violation","06/24/2014",""],"UC:UC","-","75","55.00",["Not Specified","PJM WEST"]],["b2501.1","6.1.2014","12.1.2016",["Nottingham - Cloverdale, Nottingham - Harmon","Terminate","Transmission Line","Tap 2-138 kV FE circuits (Nottingham - Cloverdale, Nottingham - Harmon) into the new Yager station","138","","11/02/2016"],"ATSI",["","","","TO Criteria Violation","06/24/2014",""],"UC:UC","-","85","0.00",["Not Specified","PJM WEST"]],["b2502.5","6.1.2014","12.1.2016",["Various 138 kV FE circuits","Terminate","Transmission Line","Tap 6-138 kV FE circuits (Holloway-Brookside, Holloway-Harmon #1 and #2, Holloway-Longview, Holloway-Knox, Holloway-Cloverdale) into the new Nottingham station","138","","11/02/2016"],"ATSI",["","","","TO Criteria Violation","06/24/2014",""],"UC:UC","-","98","0.00",["Not Specified","PJM WEST"]],["b2505","12.30.2017","12.30.2017",["Whitestone - Harmony Village","Install","Transmission Structures","Install structures in river to remove the 115 kV #65 line (Whitestone - Harmony Village 115 kV) from bridge and improve reliability of the line","115","","06/13/2016"],"Dominion",["","","","Operational Performance","06/24/2014","09/25/2014"],"EP:EP","-","1","30.10",["Not Specified","PJM SOUTH"]],["b2542","6.1.2018","",["Loudoun","Replace","Circuit Breaker","Replace the Loudoun 500kV 'H2T502' breaker with a 50kA breaker","500","","10/25/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","10/09/2014",""],"EP:EP","-","0","0.79",["Not Specified","PJM SOUTH"]],["b2543","6.1.2018","6.1.2018",["Loudoun","Replace","Circuit Breaker","Replace the Loudoun 500kV 'H2T584' breaker with a 50kA breaker","500","","10/25/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","10/09/2014",""],"EP:EP","-","0","0.79",["Not Specified","PJM SOUTH"]],["b2545.2","2.1.2016","12.1.2016",["Richwood Hill","Install","Ring Bus","Install a ring bus station with five active positions and two 52.8 MVAR capacitors with 0.941 mH reactors","138","","10/31/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/25/2014",""],"UC:UC","-","95","0.00",["Not Specified","PJM WEST"]],["b2561","6.1.2018","6.1.2018",["Elwood","Install","Circuit Breaker","Install a new 345 kV circuit breaker 5-7 at Elwood substation","345","","06/02/2016"],"ComEd",["","","","Baseline Load Growth Deliverablility & Reliability","09/25/2014",""],"EP:EP","-","0","2.60",["Not Specified","PJM WEST"]],["b2562","6.1.2019","12.31.2017",["Roscoe Bert - Harlem","Install","Conductor","Remove 2.0 miles of wood poles on 138 kV line 17105, erect new steel structures, and install new 1113 kcmil ACSR conductor from Roscoe Bert to Harlem","138","","07/20/2016"],"ComEd",["","","","Baseline Load Growth Deliverablility & Reliability","09/25/2014",""],"EP:EP","-","0","4.60",["Not Specified","PJM WEST"]],["b2563","6.1.2018","12.31.2017",["Crescent, Beaver Valley","Replace","Circuit Breaker","Operate with the Crescent 345/138 kV #3 autotransformer in-service by replacing 8 overdutied 138 kV breakers at Crescent, 3 138 kV breakers at Beaver Valley with 63 kA rated breakers; install #1 secti","138","","07/18/2016"],"DL",["","","","Baseline Load Growth Deliverablility & Reliability","09/25/2014","01/07/2015"],"UC:UC","-","40","7.29",["Not Specified","PJM WEST"]],["b2582","6.1.2018","12.31.2017",["Elmont - Cunningham","Rebuild","Transmission Line","Rebuild the Elmont - Cunningham 500 kV line","500","","11/23/2016"],"Dominion",["","","","TO Criteria Violation","01/07/2015","11/05/2015"],"EP:EP","-","0","106.10",["Not Specified","PJM SOUTH"]],["b2583","6.1.2019","6.1.2019",["Ox","Install","Circuit Breaker","Install 500 kV breaker at Ox Substation to remove Ox Tx#1 from H1T561 breaker failure outage.","500","","11/23/2016"],"Dominion",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","1.24",["Not Specified","PJM SOUTH"]],["b2587","9.1.2018","9.1.2018",["Pierce Brook","Reconfigure","Ring Bus","Reconfigure Pierce Brook 345 kV station to a ring bus and install a 125 MVAR shunt reactor at the substation","345","","10/28/2016"],"PENELEC",["","","","Baseline Load Growth Deliverablility & Reliability","01/07/2015",""],"EP:EP","-","1","5.53",["Not Specified","PJM MA"]],["b2607","6.1.2019","6.1.2019",["Pine Gap","Increase","Relay","Pine Gap Relay Limit Increase","46","","11/29/2016"],"AEP",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM WEST"]],["b2608","6.1.2019","6.1.2019",["Richlands","Upgrade","Relay","Richlands Relay Upgrade","69","","11/29/2016"],"AEP",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","0.20",["Not Specified","PJM WEST"]],["b2609.1","6.1.2019","6.1.2018",["Thorofare","Install","Disconnect Switch","Install two 138 kV MOAB switches at Thorofare Creek substation and one 138 kV breaker at Clendenin substation","138","","12/12/2016"],"AEP",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","1.60",["Not Specified","PJM WEST"]],["b2609.3","6.1.2019","6.1.2019",["Flatwood, Kanawha, Capital Hill, Rutledge","Terminate","Transmission Line","Terminate the Flatwood, Kanawha River and Capitol Hill lines into the new Coco substation","138","","12/12/2016"],"AEP",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","4.60",["Not Specified","PJM WEST"]],["b2609.5","6.1.2019","6.1.2019",["Powell Mountain - Goff Run","Terminate","Transmission Line","Terminate the Powell Mountain and Goff Run lines into the new Chloe substation and perform any associated relay upgrades or modifications required at Powell Mountain and Goff run to accommodate new substation","138","","07/14/2016"],"APS",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","1","0.60",["Not Specified","PJM WEST"]],["b2611.1","6.1.2019","6.1.2019",["Skin Fork Area","New","Substation","New 138/46 kV station near Skin Fork and other components","138/46","","11/29/2016"],"AEP",["","","","TO Criteria Violation","01/07/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM WEST"]],["b2624","12.31.2016","12.31.2018",["Possum Point - Smoketown DP","Rebuild","Transmission Line","Rebuild 115kV Lines #18 and #145 btw. Possum Point Generating Station and NOVEC’s Smoketown DP (approx. 8.35 miles) to current 115 kV standards with normal continuous summer rating of 353 MVA","115","","10/17/2016"],"Dominion",["","","","TO Criteria Violation","03/09/2015","02/04/2016"],"EP:EP","-","0","24.70",["Not Specified","PJM SOUTH"]],["b2628","12.31.2017","12.30.2019",["Everetts - Leggetts","Rebuild","Transmission Line","Rebuild Everetts – Leggetts 115kV Line #82 Crossroads DP (19.1 miles) to current standards with a summer emergency rating of 353 MVA at 115kV","115","353 MVA (SE)","08/03/2016"],"Dominion",["","","","TO Criteria Violation","03/09/2015","07/26/2016"],"EP:EP","-","0","32.10",["Not Specified","PJM SOUTH"]],["b2633.3","4.1.2019","4.1.2019",["New Freedom","Construct","Reactive Device","Install an SVC at New Freedom 500 kV substation","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","34.45",["Not Specified","PJM MA"]],["b2633.4","4.1.2019","4.1.2019",["Salem","Add","Substation","Add a new 500 kV bay at Salem (Expansion of Salem substation)","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","7.35",["Not Specified","PJM MA"]],["b2633.5","4.1.2019","4.1.2019",["Salem","Add","Transformer","Add a new 500/230 kV autotransformer at Salem","500/230","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","60.65",["Not Specified","PJM MA"]],["b2633.6.2","4.1.2019","4.3.2017",["Deans - East Windsor","Construct","Communication Equipment","Install OPGW on the Deans - East Windsor 500 kV circuit","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2633.6.3","4.1.2019","4.3.2017",["East Windsor - New Freedom","Construct","Communication Equipment","Install OPGW on the East Windsor - New Freedom 500 kV circuit","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","5","0.00",["Not Specified","PJM MA"]],["b2633.6.4","4.1.2019","4.3.2017",["Deans","Implement","Relay","Implement high speed relaying utilizing OPGW on Deans - East Windsor 500 kV at Deans Substation","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2633.6.5","4.1.2019","4.3.2017",["New Freedom","Implement","Relay","Implement high speed relaying utilizing OPGW on East Windsor - New Freedom 500 kV at New Freedom Substation","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2633.7.1","4.1.2019","",["Red Lion - Hope Creek","Construct","Communication Equipment","Install OPGW on the Red Lion - Hope Creek 500 kV line (Delaware Portion)","500","","08/26/2016"],"DPL",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2633.7.3","4.1.2019","5.28.2018",["Hope Creek","Implement","Relay","Implement high speed relaying utilizing OPGW on Red Lion - Hope Creek 500 kV line at Hope Creek Substation","500","","08/26/2016"],"PSEG",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2633.8.1","4.1.2019","",["Orchard","Implement","Relay","Implement high speed relaying utilizing OPGW on Salem - Orchard 500 kV and New Freedom - Orchard 500 kV at Orchard substation","500","","08/26/2016"],"AEC",["","","","Operational Performance","04/28/2015",""],"on-hold:On Hold","-","0","0.00",["Not Specified","PJM MA"]],["b2634","6.1.2015","12.31.2017",["Miami Fort","Convert","Ring Bus","Convert Miami Fort 345 kV substation to a ring bus terminating Feeder 4504, TB 9 and TB10 in separate ring positions","345","","10/17/2016"],"DEOK",["","","","Generator Deactivation","02/12/2015",""],"EP:EP","-","0","8.55",["Not Specified","PJM WEST"]],["b2634.1","5.1.2017","5.1.2017",["Miami Fort - Tanners Creek","Replace","Meter","Replace metering BCT on Tanners Creek CB T2 with a slip over CT with higher thermal rating in order to remove 1193 MVA limit on facility (Miami Fort-Tanners Creek 345 kV line)","345","1409/1409","11/23/2016"],"AEP",["","","","Generator Deactivation","08/13/2015",""],"EP:EP","-","0","0.05",["Not Specified","PJM WEST"]],["b2639","6.1.2018","12.31.2017",["Crescent","Replace","Circuit Breaker","Replace the Crescent 138kV 'NO3 - 4 138' breaker with a 63kA breaker","138","63kA","07/18/2016"],"DL",["","","","Baseline Load Growth Deliverablility & Reliability","07/30/2015",""],"EP:EP","-","0","0.33",["Not Specified","PJM WEST"]],["b2640","6.1.2019","12.31.2017",["Crescent","Replace","Circuit Breaker","Replace the Crescent 138kV 'Z143 SWCKLY' breaker with a 63kA breaker","138","63kA","07/18/2016"],"DL",["","","","Baseline Load Growth Deliverablility & Reliability","07/30/2015",""],"EP:EP","-","0","0.33",["Not Specified","PJM WEST"]],["b2641","6.1.2019","12.31.2017",["Crescent","Replace","Circuit Breaker","Replace the Crescent 138kV 'Z-24 MONTOUR' breaker with a 63kA breaker","138","63kA","07/18/2016"],"DL",["","","","Baseline Load Growth Deliverablility & Reliability","07/30/2015",""],"EP:EP","-","0","0.33",["Not Specified","PJM WEST"]],["b2642","6.1.2019","12.31.2017",["Crescent","Replace","Circuit Breaker","Replace the Crescent 138kV 'Z-28 BEAVER' breaker with a 63kA breaker","138","63kA","07/18/2016"],"DL",["","","","Baseline Load Growth Deliverablility & Reliability","07/30/2015",""],"EP:EP","-","0","0.33",["Not Specified","PJM WEST"]],["b2648","6.1.2015","12.31.2019",["Carolina - Kerr Dam","Rebuild","Transmission Line","Rebuild Line #90 between Carolina and Kerr Dam (38.7 miles) to current standards with a summer emergency rating of 346 MVA at 115kV","115","346 MVA (SE)","08/03/2016"],"Dominion",["","","","TO Criteria Violation","07/29/2015","07/26/2016"],"EP:EP","-","0","58.60",["Not Specified","PJM SOUTH"]],["b2655","12.1.2016","12.31.2017",["Leon","Increase","Substation","Increase the size of the existing Leon 69 kV capacitor bank from 13.2 MVAR to 18.36 MVAR","69","","07/26/2016"],"EKPC",["","","","TO Criteria Violation","07/30/2015",""],"EP:EP","-","0","0.04",["Not Specified","PJM WEST"]],["b2665","6.1.2020","6.1.2019",["Cunningham - Dooms","Rebuild","Transmission Line","Rebuild the Cunningham - Dooms 500 kV line","500","","11/23/2016"],"Dominion",["","","","TO Criteria Violation","08/13/2015",""],"EP:EP","-","0","110.00",["Not Specified","PJM SOUTH"]],["b2666.1","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-11(CHARL1)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.10","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y12(1-1BUS)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.11","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y14(4-1BUS)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.12","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y2(1B-BETHE)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.13","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y21(SHEPJ)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.14","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y22(SHEPHJT)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.2","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-13(BETHEL)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.3","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-18(CHARL2)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.4","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-19(CHARL2)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.5","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-4(4B-2BUS)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.6","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-5(LAYTON)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.7","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-8(HUNTING)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.8","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y-9(SPRINGD)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2666.9","6.1.2020","6.1.2020",["Yukon","Replace","Circuit Breaker","Replace Yukon 138kV breaker 'Y10(CHRL-SP)' with an 80kA breaker","138","","06/09/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.82",["Not Specified","PJM WEST"]],["b2667","6.1.2020","6.1.2020",["Muskingum","Replace","Bus","Replace the Muskingum 138 kV bus # 1 and 2","138","","11/29/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","0","0.14",["Not Specified","PJM WEST"]],["b2668","6.1.2020","6.1.2020",["Dequine - Meadow Lake","Reconductor","Transmission Line","Reconductor Dequine - Meadow Lake 345 kV circuit #1 utilizing dual 954 ACSR 54/7 cardinal conductor","345","","11/29/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","0","5.10",["Not Specified","PJM WEST"]],["b2672","6.1.2020","6.1.2020",["Seneca Caverns","Change","Current Transformer","Change CT Ratio at Seneca Caverns from 120/1 to 160/1 and adjust relay settings accordingly","Not Specified","","08/02/2016"],"APS",["","","","Baseline Load Growth Deliverablility & Reliability","09/10/2015",""],"EP:EP","-","1","0.01",["Not Specified","PJM WEST"]],["b2687.1","6.1.2018","10.1.2018",["Jacksons Ferry","Install","Reactive Device","Install a +/- 450 MVAR SVC at Jacksons Ferry 765 kV substation","765","","11/29/2016"],"AEP",["0","","","Operational Performance","09/10/2015","11/05/2015"],"EP:EP","-","0","36.50",["Not Specified","PJM WEST"]],["b2687.2","6.1.2018","10.27.2017",["Broadford","Install","Disconnect Switch","Install a 300 MVAR shunt line reactor on the Broadford end of the Broadford - Jacksons Ferry 765 kV line","765","","11/29/2016"],"AEP",["0","","","Operational Performance","09/10/2015","11/05/2015"],"EP:EP","-","0","14.50",["Not Specified","PJM WEST"]],["b2689.1","6.1.2018","6.1.2018",["Woodville - Peters","Reconductor","Transmission Line","Reconductor approximately 7 miles of the Woodville - Peters (Z-117) 138 kV circuit","138","","07/18/2016"],"DL",["","","","Congestion Relief - Economic","09/10/2015",""],"EP:EP","-","10","11.20",["Not Specified","PJM WEST"]],["b2692.1","6.1.2019","6.1.2019",["Nelson, ESS H-471, Quad Cities","Replace","Bus","Replace station equipment at Nelson, ESS H-471 and Quad Cities","345","","10/17/2016"],"ComEd",["","","","Congestion Relief - Economic","09/10/2015",""],"EP:EP","-","0","24.60",["Not Specified","PJM WEST"]],["b2692.2","6.1.2019","6.1.2019",["Cordova, Quad Cities, ESS H-471, Nelson","Upgrade","Transmission Line","Upgrade conductor ratings of Cordova - Nelson, Quad Cities - ESS H-471 and ESS H-471 - Nelson 345 kV lines and mitigating sag limitations","345","","10/17/2016"],"ComEd",["","","","Congestion Relief - Economic","09/10/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM WEST"]],["b2694","6.1.2019","6.1.2019",["Peach Bottom","Increase","Transformer","Increase ratings of Peach Bottom 500/230 kV transformer to 1479 MVA normal/1839 MVA emergency","500/230","","06/02/2016"],"PECO",["","","","Congestion Relief - Economic","09/10/2015",""],"EP:EP","-","0","9.70",["Not Specified","PJM MA"]],["b2698","6.1.2019","6.1.2019",["Cloverdale, Jackson's Ferry","Replace","Relay","Replace relays at AEP's Cloverdale and Jackson's Ferry substations to improve the thermal capacity of Cloverdale - Jackson's Ferry 765 kV line","765","","10/17/2016"],"AEP",["","","","Congestion Relief - Economic","09/10/2015",""],"EP:EP","-","0","0.50",["Not Specified","PJM WEST"]],["b2699.1","6.1.2018","6.1.2018",["Powerton","Replace","Circuit Breaker","Replace 5 Powerton 345 kV CB's with 2 cycle IPO breakers, install one new 345 kV CB; swap line 0302 and line 0303 bus positions; reconfigure Powerton 345 kV bus as single ring configuration","345","","07/20/2016"],"ComEd",["","","","Operational Performance","10/08/2015",""],"UC:UC","-","40","15.00",["Not Specified","PJM WEST"]],["b2699.2","6.1.2018","6.1.2018",["Powerton","Remove","Special Protection Scheme","Remove SPS logic at Powerton that trips generators or sectionalizes bus under normal conditions; minimal SPS logic will remain","345","","01/04/2017"],"ComEd",["","","","Operational Performance","10/08/2015",""],"UC:UC","-","25","0.00",["Not Specified","PJM WEST"]],["b2699.3","6.1.2018","12.31.2017",["Powerton","Replace","Circuit Breaker","Add additional circuit breaker replacement of Powerton 345 kV BT3-4 and some relay revisions","345","","01/04/2017"],"ComEd",["","","","Operational Performance","02/11/2016",""],"UC:UC","","25","2.00",["","PJM WEST"]],["b2702","6.1.2016","6.1.2018",["Hotpatcong","Install","Reactive Device","Install two 175 MVAR reactors at Hopatcong 500 kV","500","","11/09/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","2","36.70",["Unknown","PJM MA"]],["b2703","6.1.2016","4.1.2018",["Bergen","Install","Reactive Device","Install two 100 MVAR reactors at Bergen 230 kV","230","","07/29/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","2","10.60",["Unknown","PJM MA"]],["b2704","6.1.2016","4.1.2018",["Essex","Install","Reactive Device","Install a 50 MVAR and a 100 MVAR reactor at Essex 230 kV","230","","07/29/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","5","16.70",["Unknown","PJM MA"]],["b2705","6.1.2016","4.1.2018",["Marion","Install","Reactive Device","Install two 100 MVAR reactors (variable) at Marion 345 kV","345","","11/09/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","0","23.10",["Unknown","PJM MA"]],["b2706","6.1.2016","6.1.2018",["Bayway","Install","Reactive Device","Install two 100 MVAR reactors (variable) at Bayway 345 kV","345","","07/29/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","10","26.60",["Unknown","PJM MA"]],["b2707","6.1.2016","6.1.2018",["Bayonne","Install","Reactive Device","Install a 100 MVAR reactor at Bayonne 345 kV","345","","10/17/2016"],"PSEG",["","","","Operational Performance","10/08/2015","03/10/2016"],"EP:EP","NJ","0","14.40",["Unknown","PJM MA"]],["b2712","6.1.2018","",["Bergen","Replace","Circuit Breaker","Replace the Bergen 138 kV '40P' breaker with 80kA breaker","138","80kA","12/12/2016"],"PSEG",["","","","Baseline Load Growth Deliverablility & Reliability","09/15/2016",""],"EP:EP","-","0","3.27",["Not Specified","PJM MA"]],["b2713","6.1.2018","",["Bergen","Replace","Circuit Breaker","Replace the Bergen 138 kV '90P' breaker with 80kA breaker","138","80kA","12/12/2016"],"PSEG",["","","","Baseline Load Growth Deliverablility & Reliability","09/15/2016",""],"EP:EP","-","0","3.27",["Not Specified","PJM MA"]],["b2716","12.1.2018","12.1.2018",["Lackawanna","Add","Reactive Device","Add a 200 MVAR shunt reactor at Lackawanna 500 kV substation","500","","09/27/2016"],"PPL",["","","","Operational Performance","12/03/2015",""],"EP:EP","-","0","11.00",["Not Specified","PJM MA"]],["b2717.1","5.31.2016","12.31.2016",["Davis - Rosslyn","de-energize","Transmission Line","De-energize Davis–Rosslyn #179 and #180 69 kV Lines","69","","10/17/2016"],"Dominion",["","","","TO Criteria Violation","11/20/2015",""],"EP:EP","-","0","2.50",["Not Specified","PJM SOUTH"]],["b2717.2","5.31.2016","12.31.2016",["Davis - Rosslyn","Remove","Transmission Structures","Remove splicing and stop joints in manholes","69","","10/17/2016"],"Dominion",["","","","TO Criteria Violation","11/20/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM SOUTH"]],["b2717.3","5.31.2016","12.31.2016",["Davis - Rosslyn","Remove","Transmission Structures","Evacuate and dispose of insulating fluid from various reservoirs and cables","69","","10/17/2016"],"Dominion",["","","","TO Criteria Violation","11/20/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM SOUTH"]],["b2717.4","5.31.2016","12.31.2016",["Davis - Rosslyn","Remove","Communication Equipment","Remove all cable along the approx. 2.5 mile route, swab and cap-off conduits for future use, leave existing communication fiber in place","69","","10/17/2016"],"Dominion",["","","","TO Criteria Violation","11/20/2015",""],"EP:EP","-","0","0.00",["Not Specified","PJM SOUTH"]],["b2719.1","6.1.2017","12.1.2017",["Perth","Expand","Substation","Expand Perth substation and add a 115kV four breaker ring.","115","","12/05/2016"],"Dominion",["","","","TO Criteria Violation","11/20/2015","12/01/2016"],"EP:EP","-","0","8.20",["Not Specified","Not Specified"]],["b2719.2","6.1.2017","12.1.2017",["Hickory Grove, Perth","Extend","Transmission Line","Extend the Hickory Grove DP tap 0.28 miles to Perth and terminate it at Perth.","115","","01/11/2017"],"Dominion",["","","","TO Criteria Violation","11/20/2015","12/01/2016"],"EP:EP","-","0","0.00",["Not Specified","PJM SOUTH"]],["b2719.3","6.1.2017","12.1.2017",["Perth","split","Transmission Line","Split Line #31 at Perth and terminate it into the new ring bus with 2 breakers separating each of the line terminals to prevent a breaker failure from taking out both 115 kV lines.","115","","01/11/2017"],"Dominion",["","","","TO Criteria Violation","11/20/2015","12/01/2016"],"EP:EP","-","0","0.00",["Not Specified","PJM SOUTH"]],["b2720","6.1.2018","",["Loudoun","Replace","Circuit Breaker","Replace the Loudoun 500kV ’H1T569’ breakers with 50kA breaker.","500","","10/17/2016"],"Dominion",["","","","Short Circuit","01/07/2016",""],"EP:EP","-","0","0.90",["Not Specified","PJM SOUTH"]],["b2723.1","6.1.2018","12.31.2016",["Mickleton","Replace","Circuit Breaker","Replace the Mickleton 69kV breaker PCB A with 63kA breaker","69","63 kA","12/12/2016"],"AEC",["","","","Short Circuit","07/26/2016",""],"UC:UC","NJ","50","0.36",["Unknown","PJM MA"]],["b2723.2","6.1.2018","12.31.2016",["Mickleton","Replace","Circuit Breaker","Replace the Mickleton 69kV breaker PCB B with 63kA breaker","69","63 kA","12/12/2016"],"AEC",["","","","Short Circuit","07/26/2016",""],"UC:UC","NJ","50","0.36",["Unknown","PJM MA"]],["b2723.3","6.1.2018","12.31.2016",["Mickleton","Replace","Circuit Breaker","Replace the Mickleton 69kV breaker PCB C with 63kA breaker","69","63 kA","12/12/2016"],"AEC",["","","","Short Circuit","07/26/2016",""],"UC:UC","NJ","50","0.36",["Unknown","PJM MA"]],["b2723.4","6.1.2018","12.31.2016",["Mickleton","Replace","Circuit Breaker","Replace the Mickleton 69kV breaker PCB Q with 63kA breaker","69","63 kA","12/12/2016"],"AEC",["","","","Short Circuit","07/26/2016",""],"UC:UC","NJ","50","0.36",["Unknown","PJM MA"]],["b2725","4.16.2016","12.31.2016",["Lake Avenue","Build","Substation","Build new 345/138 kV Lake Avenue substation w/breaker and a half high side (2 strings), 2-345/138 kV transformers and breaker and a half (2 strings) low side (138 kV). Substation will tie Avon - Beaver 345 kV #1/#2 and Black River - Johnson #1/#2 lines","345/138","","11/09/2016"],"ATSI",["","","","Generator Deactivation","09/12/2013","01/07/2016"],"UC:UC","-","75","40.00",["Not Specified","PJM WEST"]],["b2727","6.1.2018","6.1.2018",["South Canton","Replace","Circuit Breaker","Replace the South Canton 138 kV breakers 'K', 'J','J1', and 'J2' with 80 kA breakers.","138","80 kA","12/12/2016"],"AEP",["","","","Short Circuit","07/26/2016",""],"EP:EP","OH","0","1.20",["Unknown","PJM WEST"]],["b2728","6.1.2019","12.30.2017",["Loretto - Wilton Center","Mitigation Work","Transmission Line","Mitigate sag limitations on Loretto - Wilton Center 345 kV Line and replace station conductor at Wilton Center","345","","10/17/2016"],"ComEd",["","","","Congestion Relief - Economic","01/07/2016","02/11/2016"],"EP:EP","-","35","11.50",["Not Specified","PJM WEST"]],["b2731","8.1.2016","",["","Convert","Transmission Line","Convert the Sunnyside - East Sparta - Malvern 23 kV sub-transmission network to 69 kV. The lines are already built to 69 kV standards.","69","","10/28/2016"],"AEP",["","","","TO Criteria Violation","02/04/2016",""],"on-hold:On Hold","","0","5.70",["","PJM WEST"]],["b2732.1","6.1.2020","6.1.2020",["Dresden","Cut In","Transmission Line","Cut-in of line 93505 Tazewell - Kendall 345 kV line into Dresden","345","","09/26/2016"],"ComEd",["","","","Generator Deactivation","02/11/2016",""],"EP:EP","","0","17.00",["","PJM WEST"]],["b2735","6.1.2018","",["Warren","Replace","Circuit Breaker","Replace the Warren 115kV ’NO.2 XFMR’ breaker with 40kA breaker","115","40 kA","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.23",["Unknown","PJM MA"]],["b2736","6.1.2018","",["Warren","Replace","Circuit Breaker","Replace the Warren 115 kV ’Warren#1’ breaker with 40 kA breaker","115","40 kA","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.23",["Unknown","PJM MA"]],["b2737","6.1.2018","",["Warrem","Replace","Circuit Breaker","Replace the Warren 115 kV ’A TX#1’ breaker with 40 kA breaker","115","40 kA","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.23",["Unknown","PJM MA"]],["b2738","6.1.2018","",["Warren","Replace","Circuit Breaker","Replace the Warren 115 kV ’A TX#2’ breaker with 40 kA breaker","115","40 kA","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.23",["Unknown","PJM MA"]],["b2739","6.1.2018","",["Warren","Prepare","Circuit Breaker","Replace the Warren 115 kV 'Warren#2’ breaker with 40 kA breaker","115","40 kA","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.23",["Unknown","PJM MA"]],["b2740","6.1.2018","",["Hooversville","Revise Reclosing","Circuit Breaker","Revise the reclosing of the Hooversville 115 kV ’Ralphton’ breaker","115","","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.01",["Unknown","PJM MA"]],["b2741","6.1.2018","",["Hooversville","Revise Reclosing","Circuit Breaker","Revise the reclosing of the Hooversville 115 kV ’Statler HIll’ breaker ","115","","12/12/2016"],"PENELEC",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.01",["Unknown","PJM MA"]],["b2742","6.1.2017","",["Hoytdale","Replace","Circuit Breaker","Replace the Hoytdale 138 kV '83-B-26' and '83-B-30' breakers with 63 kA breakers","138","63 kA","12/12/2016"],"ATSI",["","","","Short Circuit","07/26/2016",""],"EP:EP","PA","0","0.41",["Unknown","PJM WEST"]],["b2743.1","6.1.2020","6.1.2020",["Conemaugh - Hunterstown","Build","Substation","Tap the Conemaugh - Hunterstown 500 kV line & create new Rice 500 kV & 230 kV stations. Install two 500/230 kV transformers, operated together.","230/500","900N/1200E min perXF","10/28/2016"],"Transource",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","39.81",["","PJM MA"]],["b2743.2","6.1.2020","",["Conemaugh - Hunterstown","Tie","Substation","Tie in new Rice substation to Conemaugh-Hunterstown 500 kV","500","","11/01/2016"],"PENELEC",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","6.11",["","PJM MA"]],["b2743.3","6.1.2020","",["Conemaugh - Hunterstown","Upgrade","Bus","Upgrade terminal equipment at Conemaugh 500 kV: on the Conemaugh - Hunterstown 500 kV circuit ","500","","11/01/2016"],"PENELEC",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","0.20",["","PJM MA"]],["b2743.4","6.1.2020","",["Conemaugh - Hunterstown","Upgrade","Bus","Upgrade terminal equipment at Hunterstown 500 kV: on the Conemaugh - Hunterstown 500 kV circuit ","500","","11/01/2016"],"ME",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","0.20",["","PJM MA"]],["b2743.5","6.1.2020","6.1.2020",["Rice - Ringgold","Build","Transmission Line (Double Circuit)","Build new 230 kV double circuit line between Rice and Ringgold 230 kV, operated as a single circuit.","230","1660N/1660E min","11/17/2016"],"Transource",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","72.88",["","PJM MA"]],["b2743.6","6.1.2020","",["Ringgold","Reconfigure","Substation","Reconfigure the Ringgold 230 kV substation to double bus double breaker scheme ","230","","11/01/2016"],"APS",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","7.87",["","PJM WEST"]],["b2743.6.1","6.1.2020","",["Ringgold","Replace","Transformer","Replace the two Ringgold 230/138 kV transformers","138/230","339N/398E","11/01/2016"],"APS",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","6.26",["","PJM WEST"]],["b2743.7","6.1.2020","",["Ringgold - Catoctin","Reconductor/rebuild","Transmission Line","Rebuild/Reconductor the Ringgold - Catoctin 138 kV circuit and upgrade terminal equipment on both ends","138","370N/452E","11/01/2016"],"APS",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","47.22",["","PJM WEST"]],["b2744","6.1.2020","12.31.2018",["Carson - Rogers Rd","Rebuild","Transmission Line","Rebuild the Carson - Rogers Rd 500 kV circuit","500","","11/23/2016"],"Dominion",["0","","","Baseline Load Growth Deliverablility & Reliability","05/12/2016",""],"EP:EP","VA","0","48.50",["Unknown","PJM SOUTH"]],["b2745","6.1.2020","",["Chesterfield - Lakeside","Rebuild","Transmission Line","Rebuild 21.32 miles of existing line between Chesterfield - Lakeside 230 kV","230","","10/18/2016"],"Dominion",["0","","","Baseline Load Growth Deliverablility & Reliability","05/12/2016",""],"EP:EP","VA","0","22.00",["Unknown","PJM SOUTH"]],["b2746.1","6.1.2018","5.1.2018",["Ridge Rd - Kerr Dam","Rebuild","Transmission Line","Rebuild Line #137 Ridge Rd - Kerr Dam 115 kV, 8.0 miles, for 346 MVA summer emergency rating","115","346 MVA","12/12/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","39.00",["","PJM SOUTH"]],["b2746.2","6.1.2018","5.1.2018",["Ridge Rd - Chase","Rebuild","Transmission Line","Rebuild Line #1009 Ridge Rd - Chase City 115 kV, 9.5 miles, for 346 MVA summer emergency rating","115","346 MVA","12/12/2016"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b2746.3","6.1.2018","5.1.2018",["Ridge Rd","Install","Capacitor","Install a 25 MVAR 115kV capacitor bank at Ridge Road","115","25 MVAR","01/17/2017"],"Dominion",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","0","0.00",["","PJM SOUTH"]],["b2747","6.1.2018","",["Gordonsville","Install","Motor Operated Disconnect Switch","Install a Motor Operated Switch and SCADA control between Dominion’s Gordonsville 115kV bus and FirstEnergy’s 115kV line","115","","12/12/2016"],"Dominion",["","","","Operational Performance","07/26/2016",""],"EP:EP","","0","0.35",["","PJM SOUTH"]],["b2748","6.2.2017","",["Tiffany","Install","Capacitor","Install two 28 MVAR capacitors at Tiffany 115 kV substation","115","28 MVAR","12/12/2016"],"PENELEC",["","","","TO Criteria Violation","07/26/2016",""],"EP:EP","PA","0","2.50",["Unknown","PJM MA"]],["b2749","6.1.2017","",["West Boyertown","Replace","Relay","Replace relay at West Boyertown 69 kV station on the West Boyertown - North Boyertown 69 kV circuit","69","","12/12/2016"],"ME",["","","","TO Criteria Violation","07/26/2016",""],"EP:EP","PA","0","0.05",["Unknown","PJM MA"]],["b2751","6.1.2016","12.15.2017",["Hays Road - SW 1403","Rebuild","Transmission Line","Rebuild/Resag the H440 – H440 Tap 138 kV Line 16914-2 (Hays Road - SW 1403 138 kV)","138","197/197/226","01/05/2017"],"RMU",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016",""],"EP:EP","","20","3.50",["","PJM WEST"]],["b2752.1","6.1.2020","6.1.2020",["Peachbottom - TMI","Build","Substation","Tap the Peach Bottom – TMI 500 kV line & create new Furnace Run 500 kV & 230 kV stations. Install two 500/230 kV transformers, operated together.","230/500","900N/1200E min perXF","11/14/2016"],"Transource",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","44.66",["","PJM MA"]],["b2752.2","6.1.2020","6.1.2020",["Peachbottom - TMI","Tie","Substation","Tie in new Furnace Run substation to Peach Bottom-TMI 500 kV","500","","10/27/2016"],"PECO",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","5.50",["","PJM MA"]],["b2752.3","6.1.2020","6.1.2020",["Peachbottom - TMI","Upgrade","Bus","Upgrade terminal equipment and required relay communication at Peach Bottom 500 kV: on the Peach Bottom - TMI 500 kV circuit ","500","","11/11/2016"],"PECO",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","2.00",["","PJM MA"]],["b2752.4","6.1.2020","",["Peachbottom - TMI","Upgrade","Bus","Upgrade terminal equipment and required relay communication at TMI 500 kV: on the Peach Bottom - TMI 500 kV circuit ","500","","11/11/2016"],"ME",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","2.00",["","PJM MA"]],["b2752.5","6.1.2020","6.1.2020",["Furnace Run - Conastone","Build","Transmission Line (Double Circuit)","Build new 230 kV double circuit line between Furnace Run and Conastone 230 kV, operated as a single circuit.","230","2400N/2400E min","11/17/2016"],"Transource",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","39.72",["","PJM MA"]],["b2752.6","6.1.2020","6.1.2020",["Conastone","Install/Upgrade","Bus","Conastone 230 kV substation tie-in work (install a new circuit breaker at Conastone 230 kV and upgrade any required terminal equipment to terminate the new circuit)","230","2400N/2400E min","10/27/2016"],"BGE",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","4.12",["","PJM MA"]],["b2752.7","6.1.2020","6.1.2020",["Conastone - Northwest","Reconductor and rebuild","Transmission Line","Reconductor/Rebuild the two Conastone - Northwest 230 kV lines and upgrade terminal equipment on both ends","230","1100N/1327E each","10/27/2016"],"BGE",["","","","Congestion Relief - Economic","05/12/2016","06/09/2016"],"EP:EP","","0","45.88",["","PJM MA"]],["b2753.1","1.1.2019","1.1.2019",["George Washington","Install and Replace","Substation","Replace existing George Washington station 138 kV yard with GIS 138 kV breaker and a half yard in existing station footprint. Install 138 kV revenue metering for new IPP connection.","138","","12/22/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","07/26/2016","12/15/2016"],"EP:EP","","0","0.00",["","PJM WEST"]],["b2755","6.1.2018","12.31.2018",["Newark Airport","Build","Not Specified","Build a third 345 kV source into Newark Airport","345","","01/13/2017"],"PSEG",["","","","TO Criteria Violation","07/14/2016",""],"EP:EP","","0","35.00",["","PJM MA"]],["b2758","6.1.2016","6.1.2021",["Dooms – Valley","Rebuild","Transmission Line","Rebuild Line #549 Dooms – Valley 500kV","500","Planned: 3464/4300/4900","01/13/2017"],"Dominion",["","","","TO Criteria Violation","10/06/2016","01/12/2017"],"EP:EP","","0","58.16",["","PJM SOUTH"]],["b2759","6.1.2016","6.1.2021",["Mt. Storm – Valley","Rebuild","Transmission Line","Rebuild Line #550 Mt. Storm – Valley 500kV","500","Planned: 3464/4300/4900","01/13/2017"],"Dominion",["","","","TO Criteria Violation","10/06/2016","01/12/2017"],"EP:EP","","0","225.00",["","PJM SOUTH"]],["b2766.1","6.1.2021","",["Conastone","Upgrade","Substation","Upgrade substation equipment at Conastone 500 kV (on the Peach Bottom – Conastone 500 kV circuit) to increase facility rating to 2826 MVA normal and 3525 MVA emergency","500","Planned: 2826N/3525E","12/12/2016"],"BGE",["","","","Baseline Load Growth Deliverablility & Reliability","10/06/2016",""],"EP:EP","","0","2.70",["","PJM MA"]],["b2766.2","6.1.2021","",["Peach Bottom","Upgrade","Substation","Upgrade substation equipment at Peach Bottom 500 kV (on the Peach Bottom – Conastone 500 kV circuit) to increase facility rating to 2826 MVA normal and 3525 MVA emergency","500","Planned: 2826N/3525E","12/12/2016"],"PECO",["","","","Baseline Load Growth Deliverablility & Reliability","10/06/2016",""],"EP:EP","","0","4.30",["","PJM MA"]],["b2767","6.1.2021","",["Homer City","Move","Transformer","Construct a new 345 kV breaker string with three (3) 345 kV breakers at Homer City and move the North autotransformer connection to this new breaker string","345","","01/03/2017"],"PENELEC",["","","","Baseline Load Growth Deliverablility & Reliability","10/06/2016",""],"EP:EP","","0","6.60",["","PJM MA"]],["b2776","6.1.2021","6.1.2021",["Dequine - Meadow Lake","Reconductor","Transmission Line","Reconductor the entire Dequine - Meadow Lake 345 kV circuit #2","345","","12/12/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","11/03/2016",""],"EP:EP","","0","6.60",["","PJM WEST"]],["b2777","6.1.2021","6.1.2021",["Dequine - Eugene","Reconductor","Transmission Line","Reconductor the enitre Dequine - Eugene 345 kV circuit #1","345","","12/12/2016"],"AEP",["","","","Baseline Load Growth Deliverablility & Reliability","11/03/2016",""],"EP:EP","","0","22.19",["","PJM WEST"]]]