Dryburg 115 kV

25.2 MW Capacity / 45.0 MW Energy

Introduction

In accordance with Tariff Part VII, Subpart B, section 304, PJM performed load flow analysis (Transition Sort Retool) on all AE1 through AG1 projects that have met eligibility requirements according to Tariff, Part VII, Subpart B, section 303. The purpose of this study is to determine whether a project would be classified as eligible for the Expedited Process (Fast Lane) or if it would be reprioritized to be studied as part of Transition Cycle #1 (TC1) using the criteria from the Expedited Process Eligibility section of Tariff Part VII, section 304. This is not a System Impact Study report.

Below are the results of the study, details of how the study was performed, criterion used in the evaluation of the Expedited Process vs. TC1 determination, and next steps in the interconnection process for your project.

Transition Cycle #1:

The AG1-342 project has not met the Expedited Process Eligibility requirements in Tariff Part VII, Subpart B, section 304 and will therefore be reprioritized to Transition Cycle #1. Please see "Transition Cycle #1 Rules" below.

Transition Sort Retool Study Process and Criteria:

In order to determine Expedited Process vs. Transition Cycle #1 classification, projects which met the Transition Eligibility requirements from Tariff Part VII, Subpart B, section 303 were studied on the base case model that was used for the original System Impact Study analysis. Both a summer peak and light load load flow analysis were performed. Projects that have cost allocation eligibility or are identified as the first to cause a system violation which requires the need for a Network Upgrade with a total estimated cost greater than $5 million will be reprioritized to Transition Cycle #1. All other projects will be eligible for the expedited procedures set forth in Tariff Part VII, Subpart B, section 304 (B).

Expedited Process Eligibility: OATT Tariff Part VII, section 304:

A project is not eligible for the expedited process if it has cost allocation eligibility or is identified as the first to cause, as determined according to Tariff, Part VI, section 217.3, for a Network Upgrade which has a total estimated cost of greater than $5,000,000. Such cost estimate will be based on Transmission Provider's most recently available data.

Not considered in the Transition Sorting: The cost of the Interconnection Facilities is not considered when determining a project's eligibility for the expedited process. Affected Systems upgrade costs are also not considered in the evaluation.

Transition Sort Retool Results Provided:

This report includes a list of:

  1. the overloaded flowgates (overloaded facilities + contingency pair) that the project contributes towards
  2. other interconnection projects that may also contribute to the overloaded facility, and
  3. the total estimated cost for any required Network Upgrades.

Important Notes:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

Next Steps for your project:

Transition Cycle #1 Rules:

Refer to Tariff Part VII, Subpart B, section 304 (C) for the Transition Cycle #1 Project Rules.

Transition Cycle #1 will start no later than one year from the Transition Start Date (July 10, 2023). Transition Cycle #1 will run simultaneously with the expedited process, however Transition Cycle #1, Phase III will not begin until all expedited process projects have been completed.

Projects that are reprioritized to Transition Cycle #1 will not need to re-apply to the Interconnection Cycle Process. Therefore, there is no Application Review Phase for Transition Cycle #1. The cycle process for Transition Cycle #1 includes three Study Phases and three Decision Points:

  1. Phase I System Impact Study and Decision Point I; and
  2. Phase II System Impact Study and Decision Point II; and
  3. Phase III System Impact Study and Decision Point III

Refer to Tariff Part VII, Subpart D, section 307 for the Transition Cycle #1 study process.

General

The Interconnection Customer (IC), has proposed a Solar; Storage generating facility located in the Dominion zone — Halifax County, Virginia. The installed facilities will have a total capability of 45.0 MW with 25.2 MW of this output being recognized by PJM as Capacity.

Project Information
Queue Number AG1-342
Project Name Dryburg 115 kV
Developer Name Staunton Solar LLC
State Virginia
County Halifax
Transmission Owner Dominion
MFO 45.0 MW
MWE 45.0 MW
MWC 25.2 MW
Fuel Type Solar; Storage
Basecase Study Year 2024

Point of Interconnection

AG1-342 "Dryburg 115 kV" will interconnect with the Dominion transmission system. The primary POI is a direct connect to the Dryburg 115 kV substation.

 

Summer Peak Analysis

The Queue Project was evaluated as a 45.0 MW (Capacity 25.2 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential Summer peak period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
Summer Peak Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Initial Loading Final Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
DVP_P1-2: LN 235-A
CONTINGENCY 'DVP_P1-2: LN 235-A'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Single AC 203.26 % 204.93 % 182.64 B 374.28 3.1
DVP 3CLUBHSE-6CLUBHSE 115.0/230.0 kV Ckt 1 transformer
314562 to 314563 ckt 1
DVP_P1-2: LN 2201
CONTINGENCY 'DVP_P1-2: LN 2201'
 OPEN BRANCH FROM BUS 313725 TO BUS 314563 CKT 1   /*6DRY BREAD   230.0 - 6CLUBHSE     230.0
END
Single AC 177.26 % 178.32 % 182.64 B 325.69 1.94
DVP 3CLUBHSE-6CLUBHSE 115.0/230.0 kV Ckt 1 transformer
314562 to 314563 ckt 1
DVP_P1-2: LN 254
CONTINGENCY 'DVP_P1-2: LN 254'
 OPEN BRANCH FROM BUS 313725 TO BUS 314583 CKT 1   /*6DRY BREAD   230.0 - 6LAKEVEW     230.0
END
Single AC 165.99 % 167.03 % 182.64 B 305.07 1.95
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P1-2: LN 298
CONTINGENCY 'DVP_P1-2: LN 298'
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Single AC 126.56 % 127.66 % 198.06 B 252.85 2.21
CPLE/DVP AC1-221 TAP-6PERSON230 T 230.0 kV Ckt 1 line
927250 to 304070 ckt 1
DVP_P1-2: LN 556-C
CONTINGENCY 'DVP_P1-2: LN 556-C'
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 151.21 % 152.64 % 718.0 B 1095.93 9.4
DVP 6SEDGE HILL-AC1-221 TAP 230.0 kV Ckt 1 line
314697 to 927250 ckt 1
DVP_P1-2: LN 556-C
CONTINGENCY 'DVP_P1-2: LN 556-C'
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 148.67 % 150.19 % 674.92 B 1013.69 9.4
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 2 transformer
314691 to 314692 ckt 2
Base Case Single AC 118.72 % 119.75 % 176.81 A 211.74 1.83
CPLE/DVP AC1-221 TAP-6PERSON230 T 230.0 kV Ckt 1 line
927250 to 304070 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 966360 CKT 1   /*AF1-246 TAP  500.0 - AG1-505 TAP  500.0
END
Single AC 151.33 % 152.77 % 718.0 B 1096.87 9.4
DVP 6SEDGE HILL-AC1-221 TAP 230.0 kV Ckt 1 line
314697 to 927250 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 966360 CKT 1   /*AF1-246 TAP  500.0 - AG1-505 TAP  500.0
END
Single AC 148.69 % 150.21 % 674.92 B 1013.8 9.4
DVP 3CLUBHSE-6CLUBHSE 115.0/230.0 kV Ckt 1 transformer
314562 to 314563 ckt 1
Base Case Single AC 108.68 % 109.72 % 176.81 A 193.99 1.9
DVP 3SEDGE HILL-6SEDGE HILL 115.0/230.0 kV Ckt 1 transformer
314696 to 314697 ckt 1
DVP_P1-3: 6SEDGE HILL-TX#2
CONTINGENCY 'DVP_P1-3: 6SEDGE HILL-TX#2'
 OPEN BRANCH FROM BUS 314696 TO BUS 314697 CKT 2   /*3SEDGE HILL  115.0 - 6SEDGE HILL  230.0
END
Single AC 98.11 % 102.51 % 242.52 B 248.61 10.69
DVP 3CAROLNA-6CAROLNA 115.0/230.0 kV Ckt 1 transformer
314559 to 314561 ckt 1
DVP_P1-2: LN 1017
CONTINGENCY 'DVP_P1-2: LN 1017'
 OPEN BRANCH FROM BUS 313720 TO BUS 314558 CKT 1   /*3NEWSOMS     115.0 - 3BOYKINS     115.0
END
Single AC 99.47 % 100.05 % 239.89 B 240.01 1.42
DVP AE2-291 TAP-3GRIT 115.0 kV Ckt 1 line
942750 to 314694 ckt 1
DVP_P1-2: LN 556-C
CONTINGENCY 'DVP_P1-2: LN 556-C'
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 100.39 % 101.53 % 285.76 B 290.15 3.17
DVP 3GRIT-3OTTER R 115.0 kV Ckt 1 line
314694 to 314712 ckt 1
DVP_P1-2: LN 556-C
CONTINGENCY 'DVP_P1-2: LN 556-C'
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 99.32 % 100.47 % 285.76 B 287.11 3.17
DVP AE2-291 TAP-3GRIT 115.0 kV Ckt 1 line
942750 to 314694 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 966360 CKT 1   /*AF1-246 TAP  500.0 - AG1-505 TAP  500.0
END
Single AC 100.25 % 101.39 % 285.76 B 289.73 3.17
DVP 3GRIT-3OTTER R 115.0 kV Ckt 1 line
314694 to 314712 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 966360 CKT 1   /*AF1-246 TAP  500.0 - AG1-505 TAP  500.0
END
Single AC 99.19 % 100.33 % 285.76 B 286.69 3.17
DVP 3KERR-3PALMERSPRNG 115.0 kV Ckt 1 line
314702 to 314673 ckt 1
DVP_P1-2: LN 22
CONTINGENCY 'DVP_P1-2: LN 22'
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314571 TO BUS 316125 CKT 1   /*3EATON F     115.0 - AC1-054 TAP  115.0
 OPEN BRANCH FROM BUS 314702 TO BUS 316125 CKT 1   /*3KERR        115.0 - AC1-054 TAP  115.0
 OPEN BUS 314571                                   /*3EATON F     115.0
 OPEN BUS 316125                                   /*AC1-054 TAP  115.0
 OPEN BUS 316126                                   /*AC1-054 MAIN 115.0
 OPEN BUS 316127                                   /*AC1-054 COL2  22.9
 OPEN BUS 316128                                   /*AC1-054 COL1  22.9
 OPEN BUS 316129                                   /*AC1-054 C      0.4
 OPEN BUS 925785                                   /*AC1-054 E      0.4
END
Single AC 101.74 % 102.86 % 138.18 B 142.13 1.56
DVP 3KERR-3PALMERSPRNG 115.0 kV Ckt 1 line
314702 to 314673 ckt 1
DVP_P1-2: LN 556-A
CONTINGENCY 'DVP_P1-2: LN 556-A'
 OPEN BRANCH FROM BUS 314686 TO BUS 314906 CKT 1                /*6CLOVER      230.0 - 8CLOVER      500.0
 OPEN BRANCH FROM BUS 314686 TO BUS 314906 CKT 2                /*6CLOVER      230.0 - 8CLOVER      500.0
 OPEN BRANCH FROM BUS 314686 TO BUS 314906 CKT 3                /*6CLOVER      230.0 - 8CLOVER      500.0
 OPEN BRANCH FROM BUS 314906 TO BUS 945810 CKT 1                /*8CLOVER      500.0 - AF1-246 TAP  500.0
 OPEN BUS 314906                                                /*8CLOVER      500.0
 OPEN BUS 314915                                                /*8CLOVER_STC  500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 314902 TO BUS 965810 CKT 1 /*8CARSON      500.0 - AG1-449 TAP  500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 942930 TO BUS 314936 CKT 1 /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 SET POSTCONTRATING 2858 BRANCH FROM BUS 965810 TO BUS 942930 CKT 1 /*AG1-449 TAP  500.0 - AE2-313 TAP  500.0
 SET POSTCONTRATING 3811 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 314902 TO BUS 965810 CKT 1 /*8CARSON      500.0 - AG1-449 TAP  500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 942930 TO BUS 314936 CKT 1 /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 SET PRECONTRATING 2650 BRANCH FROM BUS 965810 TO BUS 942930 CKT 1 /*AG1-449 TAP  500.0 - AE2-313 TAP  500.0
 SET PRECONTRATING 3533 BRANCH FROM BUS 314935 TO BUS 314936 CKT 1 /*8HERITAGE    500.0 - 8RAWLINGS    500.0
END
Single AC 100.15 % 101.25 % 138.18 B 139.91 1.39
DVP 3FARMVIL-6FARMVIL 115.0/230.0 kV Ckt 1 transformer
314691 to 314692 ckt 1
DVP_P4-2: 29822
CONTINGENCY 'DVP_P4-2: 29822'
 OPEN BRANCH FROM BUS 313867 TO BUS 314747 CKT 1   /*6BREMODIST   230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 313868 TO BUS 314747 CKT 1   /*6CARTERV     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 314747 CKT 1   /*6BEARGRDN    230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 314747 CKT 2   /*6BEARGRDN    230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315191 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN G1  18.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315192 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN G2  18.0
 OPEN BRANCH FROM BUS 314326 TO BUS 315193 CKT 1   /*6BEARGRDN    230.0 - 1BEARGRDN S1  22.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314744 TO BUS 314747 CKT 1   /*3BREMO       115.0 - 6BREMO       230.0
 OPEN BUS 314326                                   /*6BEARGRDN    230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 314747                                   /*6BREMO       230.0
 OPEN BUS 315191                                   /*1BEARGRDN G1  18.0
 OPEN BUS 315192                                   /*1BEARGRDN G2  18.0
 OPEN BUS 315193                                   /*1BEARGRDN S1  22.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
END
Breaker AC 190.26 % 191.66 % 221.4 C 424.32 3.95
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P4-2: 556T591
CONTINGENCY 'DVP_P4-2: 556T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 195.82 % 197.21 % 684.0 C 1348.9 9.41
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P4-2: 511T556
CONTINGENCY 'DVP_P4-2: 511T556'
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 195.82 % 197.21 % 684.0 C 1348.89 9.41
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 195.77 % 197.15 % 684.0 C 1348.53 9.41
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P4-2: 556T591
CONTINGENCY 'DVP_P4-2: 556T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 193.15 % 194.5 % 699.0 C 1359.58 9.4
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P4-2: 511T556
CONTINGENCY 'DVP_P4-2: 511T556'
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 193.15 % 194.5 % 699.0 C 1359.56 9.4
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker DC 193.09 % 194.45 % 699.0 C 1359.21 9.4
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-6: CAROLIN T122
CONTINGENCY 'DVP_P4-6: CAROLIN T122'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314578 CKT 1   /*3CAROLNA     115.0 - 3HORNRTN     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314585 CKT 1   /*3CAROLNA     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 315126 CKT 1   /*3CAROLNA     115.0 - 1ROARAP2      14.4
 OPEN BRANCH FROM BUS 314559 TO BUS 315128 CKT 1   /*3CAROLNA     115.0 - 1ROARAP4      14.4
 OPEN BUS 314559                                   /*3CAROLNA     115.0
 OPEN BUS 314835                                   /*3CAROL_1     115.0
 OPEN BUS 315126                                   /*1ROARAP2      14.4
 OPEN BUS 315128                                   /*1ROARAP4      14.4
END
Breaker AC 148.23 % 150.33 % 199.0 B 299.16 5.11
DVP 3SEDGE HILL-6SEDGE HILL 115.0/230.0 kV Ckt 2 transformer
314696 to 314697 ckt 2
DVP_P4-2: 3202
CONTINGENCY 'DVP_P4-2: 3202'
 OPEN BRANCH FROM BUS 313852 TO BUS 314716 CKT 1   /*3WELCOTAP    115.0 - 3REEDY C     115.0
 OPEN BRANCH FROM BUS 313852 TO BUS 314718 CKT 1   /*3WELCOTAP    115.0 - 3S BOSTN     115.0
 OPEN BRANCH FROM BUS 313852 TO BUS 314724 CKT 1   /*3WELCOTAP    115.0 - 3WELCO       115.0
 OPEN BRANCH FROM BUS 314696 TO BUS 314697 CKT 1   /*3SEDGE HILL  115.0 - 6SEDGE HILL  230.0
 OPEN BRANCH FROM BUS 314696 TO BUS 314717 CKT 1   /*3SEDGE HILL  115.0 - 3SINAI       115.0
 OPEN BRANCH FROM BUS 314717 TO BUS 314718 CKT 1   /*3SINAI       115.0 - 3S BOSTN     115.0
 OPEN BUS 313852                                   /*3WELCOTAP    115.0
 OPEN BUS 314717                                   /*3SINAI       115.0
 OPEN BUS 314718                                   /*3S BOSTN     115.0
 OPEN BUS 314724                                   /*3WELCO       115.0
END
Breaker AC 150.1 % 156.89 % 279.1 C 437.87 19.03
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-2: 13002
CONTINGENCY 'DVP_P4-2: 13002'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
 OPEN BRANCH FROM BUS 314595 TO BUS 314600 CKT 1   /*3PL HILL     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314600 TO BUS 314615 CKT 1   /*3PLHITP      115.0 - 3SKIPPERS    115.0
 OPEN BUS 314595                                   /*3PL HILL     115.0
 OPEN BUS 314600                                   /*3PLHITP      115.0
END
Breaker AC 127.6 % 129.48 % 199.0 B 257.67 4.43
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P4-2: 102802
CONTINGENCY 'DVP_P4-2: 102802'
 OPEN BRANCH FROM BUS 313722 TO BUS 314559 CKT 1   /*3OCCONEECHEE 115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 313723 TO BUS 314559 CKT 1   /*3PECAN       115.0 - 3CAROLNA     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314561 CKT 1   /*3CAROLNA     115.0 - 6CAROLNA     230.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314600 CKT 1   /*3CAROLNA     115.0 - 3PLHITP      115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314835 CKT 1   /*3CAROLNA     115.0 - 3CAROL_1     115.0
END
Breaker AC 127.6 % 129.48 % 199.0 B 257.67 4.43
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 116.41 % 123.45 % 406.0 C 501.22 29.38
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 114.33 % 121.3 % 406.0 C 492.49 29.32
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 112.92 % 119.9 % 406.0 C 486.8 29.32
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 15832
CONTINGENCY 'DVP_P4-2: 15832'
 OPEN BRANCH FROM BUS 313755 TO BUS 314701 CKT 1   /*3FLAT CREEK  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 313755 TO BUS 314707 CKT 1   /*3FLAT CREEK  115.0 - 3MORAN       115.0
 OPEN BRANCH FROM BUS 314519 TO BUS 314701 CKT 1   /*3LONEPINE_1  115.0 - 3LONEPN      115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314707 CKT 1   /*3FARMVIL     115.0 - 3MORAN       115.0
 OPEN BUS 313755                                   /*3FLAT CREEK  115.0
 OPEN BUS 314519                                   /*3LONEPINE_1  115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314707                                   /*3MORAN       115.0
END
Breaker DC 104.65 % 111.64 % 406.0 C 453.27 29.38
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-5: FARMVIL L432
CONTINGENCY 'DVP_P4-5: FARMVIL L432'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 103.0 % 109.97 % 406.0 C 446.48 29.32
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 235T298
CONTINGENCY 'DVP_P4-2: 235T298'
 OPEN BRANCH FROM BUS 313802 TO BUS 314268 CKT 1   /*6PRINCE EDW  230.0 - 6BRIERY      230.0
 OPEN BRANCH FROM BUS 313802 TO BUS 314692 CKT 1   /*6PRINCE EDW  230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314268 TO BUS 934620 CKT 1   /*6BRIERY      230.0 - AD1-088 TAP  230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314692 CKT 1   /*6BUCKING     230.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314677 TO BUS 314747 CKT 1   /*6BUCKING     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 1   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314692 CKT 2   /*3FARMVIL     115.0 - 6FARMVIL     230.0
 OPEN BRANCH FROM BUS 962490 TO BUS 934620 CKT 1   /*AG1-098 TAP  230.0 - AD1-088 TAP  230.0
 OPEN BUS 313802                                   /*6PRINCE EDW  230.0
 OPEN BUS 314268                                   /*6BRIERY      230.0
 OPEN BUS 314677                                   /*6BUCKING     230.0
 OPEN BUS 924032                                   /*AB2-045 E    230.0
 OPEN BUS 934620                                   /*AD1-088 TAP  230.0
 OPEN BUS 934621                                   /*AD1-088 MAIN 230.0
 OPEN BUS 934622                                   /*AD1-088 COL1  34.5
 OPEN BUS 934623                                   /*AD1-088 TER   13.8
 OPEN BUS 934624                                   /*AD1-088 COL2  34.5
 OPEN BUS 934625                                   /*AD1-088 C      0.7
 OPEN BUS 934626                                   /*AD1-088 E      0.7
END
Breaker DC 101.59 % 108.57 % 406.0 C 440.79 29.32
DVP AE2-291 TAP-3GRIT 115.0 kV Ckt 1 line
942750 to 314694 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 114.16 % 115.77 % 350.0 C 405.2 5.67
DVP AE2-291 TAP-3GRIT 115.0 kV Ckt 1 line
942750 to 314694 ckt 1
DVP_P4-2: 511T556
CONTINGENCY 'DVP_P4-2: 511T556'
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 114.16 % 115.77 % 350.0 C 405.19 5.67
DVP AE2-291 TAP-3GRIT 115.0 kV Ckt 1 line
942750 to 314694 ckt 1
DVP_P4-2: 556T591
CONTINGENCY 'DVP_P4-2: 556T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 114.16 % 115.77 % 350.0 C 405.18 5.67
DVP 3GRIT-3OTTER R 115.0 kV Ckt 1 line
314694 to 314712 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 113.29 % 114.9 % 350.0 C 402.16 5.67
DVP 3GRIT-3OTTER R 115.0 kV Ckt 1 line
314694 to 314712 ckt 1
DVP_P4-2: 511T556
CONTINGENCY 'DVP_P4-2: 511T556'
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 113.29 % 114.9 % 350.0 C 402.16 5.67
DVP 3GRIT-3OTTER R 115.0 kV Ckt 1 line
314694 to 314712 ckt 1
DVP_P4-2: 556T591
CONTINGENCY 'DVP_P4-2: 556T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 113.29 % 114.9 % 350.0 C 402.14 5.67
DVP 3OTTER R-3ALTVSTA 115.0 kV Ckt 1 line
314712 to 314666 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 110.28 % 111.92 % 342.0 C 382.78 5.67
DVP 3OTTER R-3ALTVSTA 115.0 kV Ckt 1 line
314712 to 314666 ckt 1
DVP_P4-2: 511T556
CONTINGENCY 'DVP_P4-2: 511T556'
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 110.28 % 111.92 % 342.0 C 382.78 5.67
DVP 3OTTER R-3ALTVSTA 115.0 kV Ckt 1 line
314712 to 314666 ckt 1
DVP_P4-2: 556T591
CONTINGENCY 'DVP_P4-2: 556T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 966360 TO BUS 314936 CKT 1   /*AG1-505 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 110.27 % 111.92 % 342.0 C 382.76 5.67
DVP AC1-105 TAP-3SEDGE HILL 115.0 kV Ckt 1 line
316115 to 314696 ckt 1
DVP_P4-2: 8432
CONTINGENCY 'DVP_P4-2: 8432'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker DC 108.02 % 114.96 % 406.0 C 466.73 29.38
DVP 3MT LREL-AC1-105 TAP 115.0 kV Ckt 1 line
314684 to 316115 ckt 1
DVP_P4-2: 8432
CONTINGENCY 'DVP_P4-2: 8432'
 OPEN BRANCH FROM BUS 314521 TO BUS 314713 CKT 1   /*3PAMPL_1     115.0 - 3PAMPLIN     115.0
 OPEN BRANCH FROM BUS 314691 TO BUS 314726 CKT 1   /*3FARMVIL     115.0 - 3WILLIS      115.0
 OPEN BRANCH FROM BUS 314713 TO BUS 314726 CKT 1   /*3PAMPLIN     115.0 - 3WILLIS      115.0
 OPEN BUS 314521                                   /*3PAMPL_1     115.0
 OPEN BUS 314691                                   /*3FARMVIL     115.0
 OPEN BUS 314726                                   /*3WILLIS      115.0
END
Breaker DC 96.68 % 103.62 % 406.0 C 420.69 29.38
CPLE/DVP 3KERR-3GW KING TAP 115.0 kV Ckt 1 line
314702 to 304102 ckt 1
DVP_P7-1: LN 22-90
CONTINGENCY 'DVP_P7-1: LN 22-90'
 OPEN BRANCH FROM BUS 314265 TO BUS 314584 CKT 1   /*3FIVEFORKSDP 115.0 - 3LITTLTN     115.0
 OPEN BRANCH FROM BUS 314265 TO BUS 314673 CKT 1   /*3FIVEFORKSDP 115.0 - 3PALMERSPRNG 115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314571 CKT 1   /*3CAROLNA     115.0 - 3EATON F     115.0
 OPEN BRANCH FROM BUS 314559 TO BUS 314585 CKT 1   /*3CAROLNA     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314571 TO BUS 316125 CKT 1   /*3EATON F     115.0 - AC1-054 TAP  115.0
 OPEN BRANCH FROM BUS 314584 TO BUS 314585 CKT 1   /*3LITTLTN     115.0 - 3L GASTN     115.0
 OPEN BRANCH FROM BUS 314702 TO BUS 316125 CKT 1   /*3KERR        115.0 - AC1-054 TAP  115.0
 OPEN BUS 314265                                   /*3FIVEFORKSDP 115.0
 OPEN BUS 314571                                   /*3EATON F     115.0
 OPEN BUS 314584                                   /*3LITTLTN     115.0
 OPEN BUS 314585                                   /*3L GASTN     115.0
 OPEN BUS 316125                                   /*AC1-054 TAP  115.0
 OPEN BUS 316126                                   /*AC1-054 MAIN 115.0
 OPEN BUS 316127                                   /*AC1-054 COL2  22.9
 OPEN BUS 316128                                   /*AC1-054 COL1  22.9
 OPEN BUS 316129                                   /*AC1-054 C      0.4
 OPEN BUS 925785                                   /*AC1-054 E      0.4
END
Tower AC 145.81 % 147.9 % 199.0 B 294.32 5.05

Light Load Analysis

The Queue Project was evaluated as a 45.0 MW (Capacity 25.2 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

(No impacts were found for this analysis)

System Reinforcements

The table below lists all network upgrades which resolve the identified overloaded facilities in this report.

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
  3. Reinforcements previously identified by Transmission Owners for violations on lower voltage facilities are included in this report. Transmission Owner analysis will be updated as part of the Expedited Process and Transition Cycle 1 retools.
System Reinforcements
RTEP ID Title Total Cost
n8245 Reconductor 115 kV Line #31 $700,000
n6113 Add additional 230/115 kV transformer at Carolina substation. $6,000,000
n6114 Add additional 230/115 kV transformer at Clubhouse substation. Cost changed during facility study phase. $13,653,448
n6246 Add additional 230/115 kV transformer (#3) for Circuit 1 at Farmville substation $6,000,000
n7550 Add additional 230/115 kV transformer (#4) for Circuit 2 at Farmville substation. $6,000,000
n7016 Reconductor 3.9 miles of 115 kV Line 31 from Grit DP to Otter River with 768.2 ACSS 250 $2,340,000
n7015 Reconductor 8.5 miles of 115 kV Line 31 from Grit to AE2-291 Tap with 768.2 ACSS 250 C. $5,100,000
(TBD) Reconductor 20 miles with single 795 ACSS-TW per phase, replace breaker, disconnect switches, wave trap, line switch $60,000,000
s2614 For DEV portion, rebuild 4.7 miles of 115 kV Line 45 from Kerr Dam to GW King Tap with 768 ACSS. $6,123,000
n7667 Rebuild 115 kV Line #33 from Mt. Laurel -AC1-105 Tap -Sedge Hill. $16,590,000
n8257 Reconductor 115 kV line #1019 from Kerr Dam to Palmer Springs. $204,000
n7687 Add additional 230/115 kV transformer at Sedge Hill substation. $6,000,000
n7570 Wreck and Rebuild 230 kV Line #298 From Buckingham to Bremo $47,675,000
n6245 Rebuild 12.76 miles of 230 kV Line 298 from Buckingham to Farmville with 2-768.2 ACSS 250 C. Replace Line Lead, Line Switch, Relay (CT), Wave trap at Farmville terminal $19,710,000
(TBD) Reconductor 5 miles with double 795 ACSS-TW per phase, replace disconnect switches $22,500,000
n7083 For DEV portion, rebuild 2 miles of 230 kV Line 296 from AC1-221 Tap to Persons DEP with 2-795 ACSR. $3,000,000
n8320 Dominion and AEP build new Axton-Clover 765 kV line $600,000,000

Attachments

Conclusion

The Transition Sort load flow retool results indicate that AG1-342 is not eligible for the Expedited Process per PJM Tariff Part VII, Subpart B, section 304 (A) will be reprioritized to Transition Cycle #1. See next steps for your project in the "Introduction" section above.