Clover-Rawlings 500 kV

300.0 MW Capacity / 500.0 MW Energy

Introduction

In accordance with Tariff Part VII, Subpart B, section 304, PJM performed load flow analysis (Transition Sort Retool) on all AE1 through AG1 projects that have met eligibility requirements according to Tariff, Part VII, Subpart B, section 303. The purpose of this study is to determine whether a project would be classified as eligible for the Expedited Process (Fast Lane) or if it would be reprioritized to be studied as part of Transition Cycle #1 (TC1) using the criteria from the Expedited Process Eligibility section of Tariff Part VII, section 304. This is not a System Impact Study report.

Below are the results of the study, details of how the study was performed, criterion used in the evaluation of the Expedited Process vs. TC1 determination, and next steps in the interconnection process for your project.

Transition Cycle #1:

The AF2-042 project has not met the Expedited Process Eligibility requirements in Tariff Part VII, Subpart B, section 304 and will therefore be reprioritized to Transition Cycle #1. Please see "Transition Cycle #1 Rules" below.

Transition Sort Retool Study Process and Criteria:

In order to determine Expedited Process vs. Transition Cycle #1 classification, projects which met the Transition Eligibility requirements from Tariff Part VII, Subpart B, section 303 were studied on the base case model that was used for the original System Impact Study analysis. Both a summer peak and light load load flow analysis were performed. Projects that have cost allocation eligibility or are identified as the first to cause a system violation which requires the need for a Network Upgrade with a total estimated cost greater than $5 million will be reprioritized to Transition Cycle #1. All other projects will be eligible for the expedited procedures set forth in Tariff Part VII, Subpart B, section 304 (B).

Expedited Process Eligibility: OATT Tariff Part VII, section 304:

A project is not eligible for the expedited process if it has cost allocation eligibility or is identified as the first to cause, as determined according to Tariff, Part VI, section 217.3, for a Network Upgrade which has a total estimated cost of greater than $5,000,000. Such cost estimate will be based on Transmission Provider's most recently available data.

Not considered in the Transition Sorting: The cost of the Interconnection Facilities is not considered when determining a project's eligibility for the expedited process. Affected Systems upgrade costs are also not considered in the evaluation.

Transition Sort Retool Results Provided:

This report includes a list of:

  1. the overloaded flowgates (overloaded facilities + contingency pair) that the project contributes towards
  2. other interconnection projects that may also contribute to the overloaded facility, and
  3. the total estimated cost for any required Network Upgrades.

Important Notes:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

Next Steps for your project:

Transition Cycle #1 Rules:

Refer to Tariff Part VII, Subpart B, section 304 (C) for the Transition Cycle #1 Project Rules.

Transition Cycle #1 will start no later than one year from the Transition Start Date (July 10, 2023). Transition Cycle #1 will run simultaneously with the expedited process, however Transition Cycle #1, Phase III will not begin until all expedited process projects have been completed.

Projects that are reprioritized to Transition Cycle #1 will not need to re-apply to the Interconnection Cycle Process. Therefore, there is no Application Review Phase for Transition Cycle #1. The cycle process for Transition Cycle #1 includes three Study Phases and three Decision Points:

  1. Phase I System Impact Study and Decision Point I; and
  2. Phase II System Impact Study and Decision Point II; and
  3. Phase III System Impact Study and Decision Point III

Refer to Tariff Part VII, Subpart D, section 307 for the Transition Cycle #1 study process.

General

The Interconnection Customer (IC), has proposed a Solar generating facility located in the Dominion zone — Halifax County, Virginia. The installed facilities will have a total capability of 500.0 MW with 300.0 MW of this output being recognized by PJM as Capacity.

Project Information
Queue Number AF2-042
Project Name Clover-Rawlings 500 kV
Developer Name Virginia Electric and Power Company
State Virginia
County Halifax
Transmission Owner Dominion
MFO 500.0 MW
MWE 500.0 MW
MWC 300.0 MW
Fuel Type Solar
Basecase Study Year 2023

Point of Interconnection

AF2-042 will interconnect with the Dominion on transmission system tapping the Clover 500 kV to Rawlings 500kV line. The IC is responsible for securing right-of-way, permits and constructing the proposed attachment line from the solar facility site to the existing switching station. Attachment 1 shows a one line diagram of the proposed interconnection facilities. The IC may not install any facilities on Dominion’s right-of-way without first obtaining the necessary approval from Dominion Energy.

 

Summer Peak Analysis

The Queue Project was evaluated as a 500.0 MW (Capacity 300.0 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential Summer peak period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
Summer Peak Analysis
Area Facility Description Contingency Name Contingency Type DC|AC Initial Loading Final Loading Rating (MVA) Rating Type MVA to Mitigate MW Contribution Details
DVP 6CARSON-6CHRL249 230.0 kV Ckt 1 line
314282 to 314285 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 145.64 % 151.16 % 684.0 C 1033.93 43.44
DVP 6CHRL249-6LOCKS 230.0 kV Ckt 1 line
314285 to 314316 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 142.81 % 148.32 % 684.0 C 1014.51 43.44
DVP 8CARSON-6CARSON 500.0/230.0 kV Ckt 1 transformer
314902 to 314282 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 140.5 % 148.9 % 1039.7 C 1548.11 85.34
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 101.12 % 123.12 % 684.0 C 842.14 147.73
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 101.11 % 123.12 % 684.0 C 842.14 147.73
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 100.52 % 121.99 % 699.0 C 852.71 147.7
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 100.52 % 121.94 % 699.0 C 852.36 147.7
DVP 6LOCKS-6HARR205 230.0 kV Ckt 1 line
314316 to 314301 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 113.9 % 119.26 % 541.0 C 645.2 34.09
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 56372
CONTINGENCY 'DVP_P4-2: 56372'
 OPEN BRANCH FROM BUS 314282 TO BUS 314902 CKT 1   /*6CARSON      230.0 - 8CARSON      500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
Breaker AC 119.6 % 120.51 % 3144.0 C 3788.83 117.29
DVP 8SURRY-8CHCKAHM 500.0 kV Ckt 1 line
314924 to 314903 ckt 1
DVP_P4-2: 563T576
CONTINGENCY 'DVP_P4-2: 563T576'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Breaker AC 110.23 % 110.74 % 3144.0 C 3481.67 104.71
DVP 6HARR205-6TYLER 230.0 kV Ckt 1 line
314301 to 314346 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 109.58 % 114.94 % 541.0 C 621.83 34.09
DVP 6HARROWG-6TYLER1 230.0 kV Ckt 1 line
314299 to 314263 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 108.03 % 113.09 % 541.0 C 611.82 31.97
DVP 6POE-6HARROWG 230.0 kV Ckt 1 line
314331 to 314299 ckt 1
DVP_P4-2: 562T563
CONTINGENCY 'DVP_P4-2: 562T563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
 OPEN BRANCH FROM BUS 314902 TO BUS 940640 CKT 1   /*8CARSON      500.0 - AE2-051 TAP  500.0
END
Breaker AC 107.99 % 113.06 % 541.0 C 611.65 31.97
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P4-2: 557T574
CONTINGENCY 'DVP_P4-2: 557T574'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1   /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 115.29 % 115.47 % 3637.0 C 4199.64 147.87
DVP AD1-088 TAP-6BRIERY 230.0 kV Ckt 1 line
934620 to 314268 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 89.57 % 112.35 % 699.0 C 785.33 158.67
DVP AD1-088 TAP-6BRIERY 230.0 kV Ckt 1 line
934620 to 314268 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 89.57 % 112.34 % 699.0 C 785.26 158.67
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: 557T574
CONTINGENCY 'DVP_P4-2: 557T574'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1   /*8CHCKAHM     500.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Breaker AC 113.54 % 114.36 % 3938.0 C 4503.5 154.02
DVP 8CARSON-8MDLTHAN 500.0 kV Ckt 1 line
314902 to 314914 ckt 1
DVP_P4-2: H2T557
CONTINGENCY 'DVP_P4-2: H2T557'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314218 TO BUS 314908 CKT 2   /*6ELMONT      230.0 - 8ELMONT      500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1   /*8CHCKAHM     500.0 - 8ELMONT      500.0
END
Breaker AC 106.93 % 107.76 % 3938.0 C 4243.59 150.18
DVP 6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
314268 to 313802 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 89.0 % 111.76 % 699.0 C 781.2 158.67
DVP 6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
314268 to 313802 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 88.99 % 111.76 % 699.0 C 781.2 158.67
DVP 6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
313802 to 314692 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 88.14 % 110.9 % 699.0 C 775.19 158.67
DVP 6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
313802 to 314692 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 88.14 % 110.89 % 699.0 C 775.12 158.67
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: 568T575
CONTINGENCY 'DVP_P4-2: 568T575'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 109.33 % 110.02 % 3938.0 C 4332.59 94.91
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: 57502
CONTINGENCY 'DVP_P4-2: 57502'
 OPEN BRANCH FROM BUS 314232 TO BUS 314918 CKT 1   /*6NO ANNA     230.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
Breaker AC 103.61 % 104.32 % 3938.0 C 4108.12 90.51
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P4-2: H1T575
CONTINGENCY 'DVP_P4-2: H1T575'
 OPEN BRANCH FROM BUS 314196 TO BUS 314911 CKT 1   /*6LADYSMITH   230.0 - 8LADYSMITH   500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
Breaker AC 102.71 % 103.35 % 3938.0 C 4069.92 90.13
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: SPOTS H1T594
CONTINGENCY 'DVP_P4-2: SPOTS H1T594'
 OPEN BRANCH FROM BUS 314755 TO BUS 314934 CKT 1   /*3SPOTSYL     115.0 - 8SPOTSYL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1   /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Breaker AC 104.34 % 105.01 % 3938.0 C 4135.29 85.93
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P4-2: H1T594
CONTINGENCY 'DVP_P4-2: H1T594'
 OPEN BRANCH FROM BUS 314063 TO BUS 314916 CKT 1   /*6MORRSVL     230.0 - 8MORRSVL     500.0
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1   /*8MORRSVL     500.0 - 8SPOTSYL     500.0
 OPEN BUS 314897                                   /*8MORRS_1     500.0
END
Breaker AC 100.42 % 101.09 % 3938.0 C 3980.92 82.51
DVP 6CLOVER-AD1-088 TAP 230.0 kV Ckt 1 line
314686 to 934620 ckt 1
DVP_P4-2: 511T591
CONTINGENCY 'DVP_P4-2: 511T591'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 942930 TO BUS 314936 CKT 1   /*AE2-313 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 79.96 % 102.47 % 699.0 C 716.27 158.67
DVP 6CLOVER-AD1-088 TAP 230.0 kV Ckt 1 line
314686 to 934620 ckt 1
DVP_P4-2: 556T591-A
CONTINGENCY 'DVP_P4-2: 556T591-A'
 OPEN BRANCH FROM BUS 314935 TO BUS 314936 CKT 1   /*8HERITAGE    500.0 - 8RAWLINGS    500.0
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Breaker AC 79.96 % 102.47 % 699.0 C 716.27 158.67
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P4-2: 568T575
CONTINGENCY 'DVP_P4-2: 568T575'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Breaker AC 102.94 % 103.73 % 3938.0 C 4084.89 96.85
DVP 6FARMVIL-6BUCKING 230.0 kV Ckt 1 line
314692 to 314677 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 96.13 % 112.0 % 559.3 B 626.42 88.44
DVP 6BUCKING-6BREMO 230.0 kV Ckt 1 line
314677 to 314747 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 95.25 % 110.73 % 571.52 B 632.84 88.42
DVP 6SEDGE HILL-AC1-221 TAP 230.0 kV Ckt 1 line
314697 to 927250 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 96.29 % 118.89 % 674.92 B 802.41 155.18
CPLE/DVP AC1-221 TAP-6PERSON230 T 230.0 kV Ckt 1 line
927250 to 304070 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 99.89 % 121.05 % 718.0 B 869.14 155.18
DVP 8CARSON-6CARSON 500.0/230.0 kV Ckt 1 transformer
314902 to 314282 ckt 1
DVP_P1-2: LN 563
CONTINGENCY 'DVP_P1-2: LN 563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
Single AC 121.86 % 126.22 % 903.9 B 1140.91 37.88
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 574
CONTINGENCY 'DVP_P1-2: LN 574'
 OPEN BRANCH FROM BUS 314908 TO BUS 314911 CKT 1   /*8ELMONT      500.0 - 8LADYSMITH   500.0
END
Single AC 123.22 % 126.73 % 2442.12 B 3094.9 83.65
DVP 8MDLTHAN-8NO ANNA 500.0 kV Ckt 1 line
314914 to 314918 ckt 1
DVP_P1-2: LN 557
CONTINGENCY 'DVP_P1-2: LN 557'
 OPEN BRANCH FROM BUS 314214 TO BUS 314903 CKT 1   /*6CHCKAHM     230.0 - 8CHCKAHM     500.0
 OPEN BRANCH FROM BUS 314903 TO BUS 314908 CKT 1   /*8CHCKAHM     500.0 - 8ELMONT      500.0
END
Single AC 106.0 % 108.89 % 2442.12 B 2659.22 80.75
DVP 6CARSON-6CHRL249 230.0 kV Ckt 1 line
314282 to 314285 ckt 1
DVP_P1-2: LN 563
CONTINGENCY 'DVP_P1-2: LN 563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
Single AC 124.36 % 127.45 % 559.3 B 712.83 20.02
DVP 6CHRL249-6LOCKS 230.0 kV Ckt 1 line
314285 to 314316 ckt 1
DVP_P1-2: LN 563
CONTINGENCY 'DVP_P1-2: LN 563'
 OPEN BRANCH FROM BUS 314902 TO BUS 314914 CKT 1   /*8CARSON      500.0 - 8MDLTHAN     500.0
END
Single AC 121.03 % 124.11 % 559.3 B 694.15 20.02
DVP AF2-397 TAP-6MTEAGLE 230.0 kV Ckt 1 line
961060 to 314765 ckt 1
314333 6POWHATN 230 933500 AC2-165 TAP 230 1
CONTINGENCY '314333 6POWHATN 230 933500 AC2-165 TAP 230 1'
 OPEN BRANCH FROM BUS 314333 TO BUS 933500 CKT 1   /*6POWHATN     230.0 - AC2-165 TAP  230.0
END
Single AC 105.13 % 108.57 % 661.76 B 718.47 23.34
DVP AF2-397 TAP-6MTEAGLE 230.0 kV Ckt 1 line
961060 to 314765 ckt 1
DVP_P1-2: LN 2027-B
CONTINGENCY 'DVP_P1-2: LN 2027-B'
 OPEN BRANCH FROM BUS 314310 TO BUS 314322 CKT 1   /*6JUDES F     230.0 - 6MDLTHAN     230.0
 OPEN BRANCH FROM BUS 314310 TO BUS 314333 CKT 1   /*6JUDES F     230.0 - 6POWHATN     230.0
 OPEN BRANCH FROM BUS 933500 TO BUS 314333 CKT 1   /*AC2-165 TAP  230.0 - 6POWHATN     230.0
 OPEN BUS 314310                                   /*6JUDES F     230.0
 OPEN BUS 314333                                   /*6POWHATN     230.0
 OPEN BUS 923862                                   /*AB2-026 E    230.0
END
Single AC 105.11 % 108.56 % 661.76 B 718.41 23.34
DVP AD1-152 TAP-6SEDGE HILL 230.0 kV Ckt 1 line
935170 to 314697 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 91.71 % 116.4 % 814.98 B 948.64 203.6
DVP 8MDLTHAN-6MDLTHAN 500.0/230.0 kV Ckt 1 transformer
314914 to 314322 ckt 1
DVP_P1-2: LN 576
CONTINGENCY 'DVP_P1-2: LN 576'
 OPEN BRANCH FROM BUS 314914 TO BUS 314918 CKT 1   /*8MDLTHAN     500.0 - 8NO ANNA     500.0
END
Single AC 102.42 % 105.52 % 1058.16 B 1116.57 31.76
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
314333 6POWHATN 230 933500 AC2-165 TAP 230 1
CONTINGENCY '314333 6POWHATN 230 933500 AC2-165 TAP 230 1'
 OPEN BRANCH FROM BUS 314333 TO BUS 933500 CKT 1   /*6POWHATN     230.0 - AC2-165 TAP  230.0
END
Single AC 101.33 % 104.78 % 661.76 B 693.39 23.34
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 2027-B
CONTINGENCY 'DVP_P1-2: LN 2027-B'
 OPEN BRANCH FROM BUS 314310 TO BUS 314322 CKT 1   /*6JUDES F     230.0 - 6MDLTHAN     230.0
 OPEN BRANCH FROM BUS 314310 TO BUS 314333 CKT 1   /*6JUDES F     230.0 - 6POWHATN     230.0
 OPEN BRANCH FROM BUS 933500 TO BUS 314333 CKT 1   /*AC2-165 TAP  230.0 - 6POWHATN     230.0
 OPEN BUS 314310                                   /*6JUDES F     230.0
 OPEN BUS 314333                                   /*6POWHATN     230.0
 OPEN BUS 923862                                   /*AB2-026 E    230.0
END
Single AC 101.32 % 104.76 % 661.76 B 693.26 23.34
DVP 6MTEAGLE-6CHARLVL 230.0 kV Ckt 1 line
314765 to 314749 ckt 1
DVP_P1-2: LN 2027-A
CONTINGENCY 'DVP_P1-2: LN 2027-A'
 OPEN BRANCH FROM BUS 313868 TO BUS 314747 CKT 1   /*6CARTERV     230.0 - 6BREMO       230.0
 OPEN BRANCH FROM BUS 313868 TO BUS 933500 CKT 1   /*6CARTERV     230.0 - AC2-165 TAP  230.0
 OPEN BUS 313868                                   /*6CARTERV     230.0
END
Single AC 96.91 % 100.36 % 661.76 B 664.14 23.34
DVP AD1-087 TAP-AD1-152 TAP 230.0 kV Ckt 1 line
934610 to 935170 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 87.63 % 112.23 % 814.98 B 914.65 203.6
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
DVP_P1-2: LN 2027-B
CONTINGENCY 'DVP_P1-2: LN 2027-B'
 OPEN BRANCH FROM BUS 314310 TO BUS 314322 CKT 1   /*6JUDES F     230.0 - 6MDLTHAN     230.0
 OPEN BRANCH FROM BUS 314310 TO BUS 314333 CKT 1   /*6JUDES F     230.0 - 6POWHATN     230.0
 OPEN BRANCH FROM BUS 933500 TO BUS 314333 CKT 1   /*AC2-165 TAP  230.0 - 6POWHATN     230.0
 OPEN BUS 314310                                   /*6JUDES F     230.0
 OPEN BUS 314333                                   /*6POWHATN     230.0
 OPEN BUS 923862                                   /*AB2-026 E    230.0
END
Single AC 107.85 % 111.63 % 661.76 B 738.72 25.57
DVP 6BREMO-6BREMODIST 230.0 kV Ckt 1 line
314747 to 313867 ckt 1
314333 6POWHATN 230 933500 AC2-165 TAP 230 1
CONTINGENCY '314333 6POWHATN 230 933500 AC2-165 TAP 230 1'
 OPEN BRANCH FROM BUS 314333 TO BUS 933500 CKT 1   /*6POWHATN     230.0 - AC2-165 TAP  230.0
END
Single AC 107.83 % 111.61 % 661.76 B 738.59 25.57
DVP 6FORK UNION-AF2-397 TAP 230.0 kV Ckt 1 line
313707 to 961060 ckt 1
314333 6POWHATN 230 933500 AC2-165 TAP 230 1
CONTINGENCY '314333 6POWHATN 230 933500 AC2-165 TAP 230 1'
 OPEN BRANCH FROM BUS 314333 TO BUS 933500 CKT 1   /*6POWHATN     230.0 - AC2-165 TAP  230.0
END
Single AC 105.15 % 108.62 % 661.76 B 718.8 23.34
DVP 6FORK UNION-AF2-397 TAP 230.0 kV Ckt 1 line
313707 to 961060 ckt 1
DVP_P1-2: LN 2027-B
CONTINGENCY 'DVP_P1-2: LN 2027-B'
 OPEN BRANCH FROM BUS 314310 TO BUS 314322 CKT 1   /*6JUDES F     230.0 - 6MDLTHAN     230.0
 OPEN BRANCH FROM BUS 314310 TO BUS 314333 CKT 1   /*6JUDES F     230.0 - 6POWHATN     230.0
 OPEN BRANCH FROM BUS 933500 TO BUS 314333 CKT 1   /*AC2-165 TAP  230.0 - 6POWHATN     230.0
 OPEN BUS 314310                                   /*6JUDES F     230.0
 OPEN BUS 314333                                   /*6POWHATN     230.0
 OPEN BUS 923862                                   /*AB2-026 E    230.0
END
Single AC 105.14 % 108.6 % 661.76 B 718.67 23.34
DVP AD1-088 TAP-6BRIERY 230.0 kV Ckt 1 line
934620 to 314268 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 91.83 % 108.31 % 571.52 B 619.01 95.03
DVP 6BRIERY-6PRINCE EDW 230.0 kV Ckt 1 line
314268 to 313802 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 91.12 % 107.6 % 571.52 B 614.96 95.03
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
DVP_P1-2: LN 2027-B
CONTINGENCY 'DVP_P1-2: LN 2027-B'
 OPEN BRANCH FROM BUS 314310 TO BUS 314322 CKT 1   /*6JUDES F     230.0 - 6MDLTHAN     230.0
 OPEN BRANCH FROM BUS 314310 TO BUS 314333 CKT 1   /*6JUDES F     230.0 - 6POWHATN     230.0
 OPEN BRANCH FROM BUS 933500 TO BUS 314333 CKT 1   /*AC2-165 TAP  230.0 - 6POWHATN     230.0
 OPEN BUS 314310                                   /*6JUDES F     230.0
 OPEN BUS 314333                                   /*6POWHATN     230.0
 OPEN BUS 923862                                   /*AB2-026 E    230.0
END
Single AC 105.56 % 109.33 % 661.76 B 723.5 25.57
DVP 6BREMODIST-6FORK UNION 230.0 kV Ckt 1 line
313867 to 313707 ckt 1
314333 6POWHATN 230 933500 AC2-165 TAP 230 1
CONTINGENCY '314333 6POWHATN 230 933500 AC2-165 TAP 230 1'
 OPEN BRANCH FROM BUS 314333 TO BUS 933500 CKT 1   /*6POWHATN     230.0 - AC2-165 TAP  230.0
END
Single AC 105.54 % 109.31 % 661.76 B 723.37 25.57
DVP 6PRINCE EDW-6FARMVIL 230.0 kV Ckt 1 line
313802 to 314692 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 90.08 % 106.55 % 571.52 B 608.95 95.03
DVP 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
DVP_P1-2: LN 573
CONTINGENCY 'DVP_P1-2: LN 573'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Single AC 103.2 % 104.81 % 2738.22 B 2869.93 50.38
DVP 8LADYSMITH-8CHANCE 500.0 kV Ckt 1 line
314911 to 314905 ckt 1
DVP_P1-2: LN 594
CONTINGENCY 'DVP_P1-2: LN 594'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1   /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Single AC 102.94 % 104.47 % 2738.22 B 2860.62 48.16
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 575
CONTINGENCY 'DVP_P1-2: LN 575'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
Single AC 108.45 % 110.22 % 3218.56 B 3547.5 54.03
DVP 8SPOTSYL-8MORRSVL 500.0 kV Ckt 1 line
314934 to 314916 ckt 1
DVP_P1-2: LN 568
CONTINGENCY 'DVP_P1-2: LN 568'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 103.22 % 104.65 % 3218.56 B 3368.22 52.97
DVP 6CLOVER-AD1-088 TAP 230.0 kV Ckt 1 line
314686 to 934620 ckt 1
DVP_P1-2: LN 556-B
CONTINGENCY 'DVP_P1-2: LN 556-B'
 OPEN BRANCH FROM BUS 945810 TO BUS 314936 CKT 1   /*AF1-246 TAP  500.0 - 8RAWLINGS    500.0
END
Single AC 83.95 % 100.31 % 571.52 B 573.29 95.03
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 573
CONTINGENCY 'DVP_P1-2: LN 573'
 OPEN BRANCH FROM BUS 314918 TO BUS 314934 CKT 1   /*8NO ANNA     500.0 - 8SPOTSYL     500.0
END
Single AC 99.5 % 101.21 % 3218.56 B 3257.5 51.87
DVP 8NO ANNA-8LADYSMITH 500.0 kV Ckt 1 line
314918 to 314911 ckt 1
DVP_P1-2: LN 594
CONTINGENCY 'DVP_P1-2: LN 594'
 OPEN BRANCH FROM BUS 314916 TO BUS 314934 CKT 1   /*8MORRSVL     500.0 - 8SPOTSYL     500.0
END
Single AC 100.11 % 101.73 % 3218.56 B 3274.24 49.38
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 575
CONTINGENCY 'DVP_P1-2: LN 575'
 OPEN BRANCH FROM BUS 314911 TO BUS 314918 CKT 1   /*8LADYSMITH   500.0 - 8NO ANNA     500.0
END
Single AC 102.88 % 104.68 % 3218.56 B 3369.19 55.54
DVP 8NO ANNA-8SPOTSYL 500.0 kV Ckt 1 line
314918 to 314934 ckt 1
DVP_P1-2: LN 568
CONTINGENCY 'DVP_P1-2: LN 568'
 OPEN BRANCH FROM BUS 314911 TO BUS 314922 CKT 1   /*8LADYSMITH   500.0 - 8POSSUM      500.0
END
Single AC 99.1 % 100.56 % 3218.56 B 3236.58 53.88

Light Load Analysis

The Queue Project was evaluated as a 500.0 MW (Capacity 300.0 MW) injection in the Dominion area. Project was evaluated for compliance with applicable reliability planning criteria (PJM, NERC, NERC Regional Reliability Councils, and Transmission Owners). Potential light load period network impacts are listed below:

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.

(No impacts were found for this analysis)

System Reinforcements

The table below lists all network upgrades which resolve the identified overloaded facilities in this report.

Important to Note:

Note for Uprate Projects: Per Tariff Part VII, Subpart B, section 304 (B), if a project is an uprate (project relies on the Interconnection Facilities of a prior project) whose base project does not qualify for the expedited process, the uprate also will not qualify for the expedited process, regardless of analysis results.

Notes regarding Results displayed:

  1. Some flowgate overloads that a New Service Request contributes to, but does not contribute enough to meet cost allocation eligibility (per Manual 14A, Attachment B.3), may be reported in this Transition Sort report. These types of flowgates do not affect the classification of the New Service Request as either Expedited Process or Transition Cycle #1 because cost allocation eligibility has not been met.
  2. For projects that were determined to not meet Expedited Process eligibility and are being reprioritized to Transition Cycle #1, not all reinforcements in excess of $5,000,000 may be shown in this report. This report may only display a subset of those reinforcements determined to be in excess of $5,000,000 which would classify the project as not meeting Expedited Process Eligibility. This is not a formal System Impact Study.
  3. Reinforcements previously identified by Transmission Owners for violations on lower voltage facilities are included in this report. Transmission Owner analysis will be updated as part of the Expedited Process and Transition Cycle 1 retools.
System Reinforcements
RTEP ID Title Total Cost
n5873 Rebuild 0.16 miles of Line 2028 from Bremo to Bremo Dist with 2-636 ACSR. $500,000
n6219 Rebuild 15.51 miles of 230 kV Line 298 from Buckingham to Bremo with 2-636 ACSR. $23,265,000
n6245 Rebuild 12.76 miles of 230 kV Line 298 from Buckingham to Farmville with 2-768.2 ACSS 250 C. Replace Line Lead, Line Switch, Relay (CT), Wave trap at Farmville terminal $19,710,000
b3694.8 Partial wreck and rebuild 10.34 miles of 230 kV line #249 Carson-Locks to achieve a minimum summer emergency rating of 1047 MVA. $15,365,000
b3694.7 Energize in-service spare 500-230 kV Carson Tx#1 $1,000,000
n6379 Rebuild 6.47 miles of 230 kV Line 2028 from Mt Eagle to Charlottesville with 2-636 ACSR. $16,175,000
n7019 Rebuild 33.36 miles of 230 kV line 235 from Clover to AD1-088 Tap with 2-636 ACSR. $50,040,000
n7567 Rebuild 1.63 miles of 230 kV Line 2028 from Fork Union to Bremo Dist with 2-795 ACSR (26/7) 150 C $2,445,000
n6185.2 Rebuild 17.42 miles of 230 kV Line 2028 from Fork Union to Mount Eagle with 2-636 ACSR. $26,130,000
s2609.8 Rebuild approximately 10 miles segment of 230kV Line #205 from Locks to Tyler and upgrade the terminal equipment. The minimum summer normal rating of the line segment will be 1572MVA. $27,000,000
n6179 Rebuild 12.3 miles of 230 kV Line 2003 from Poe to Harrowgate with 2-636 ACSR. $30,750,000
n8152 Add additional 500/230 kV transformer at Midlothian Substation $22,000,000
(TBD) Dominion Rating Update $0
(TBD) Reconductor 5 miles with double 795 ACSS-TW per phase, replace disconnect switches $22,500,000
n7181 Rebuild 5.7 miles of 230 kV Line 235 from Briery to Prince EDW with 2-636 ACSR. $8,550,000
n7180 Rebuild 7.2 miles of 230 kV Line 235 from Prince EDW to Farmville with 2-636 ACSR. $10,800,000
(TBD) Upgrade is not needed in Dominion End. Need to coordinate with Duke. $0
n6514 Rebuild 16.71 miles of 230 kV Line 2068 from AD1-087 Tap to Sedge Hill with 2-795 ACSR. $25,065,000
n6178 Rebuild 4.5 miles of 230 kV Line 2003 from Harrowgate to Tyler with 2-636 ACSR. $11,250,000
n6172 Rebuild 37.41 miles of 500 kV Line 563 from Carson to Midlothian with 3-1351.5 125C ACSR. $115,971,000
b3021 PJM baseline upgrade b3021: Rebuild 500kV Line #581 Ladysmith to Chancellor - 15.2 miles long. $0
n6324 Replace Terminal Equipment at Surry and Chickahominy Substations $4,000,000
n6574 Rebuild 14.53 miles of 500 kV Line 575 from North Anna to Ladysmith with 3-1351.5 113C ACSR. $45,043,000
n6055 Replace Wave traps at Midlothian and North Anna 500kV substations $300,000
n5609 Rebuild 41.13 miles of 500 kV Line 576 from Midlothian to North Anna with 3-1351.5 125C ACSR. $127,503,000
n6160 Rebuild 18.75 miles of 500 kV Line 594 from Spotsylvania to Morrisvile with 3-1351.5 113C ACSR. $58,125,000
n6132 Rebuild 14.02 miles of 500 kV Line 573 from North Anna to Spotsylvania with 3-1351.5 113C ACSR. $43,462,000
n7020 Rebuild 5.8 miles of 230 kV line 235 from AD1-088 Tap to Briery with 2-636 ACSR. $8,700,000

Attachments

Attachment 1: Single Line Diagram for Queue Project AF2-042.

AF2-042.PNG

Export to CSV Download all tables in report

Conclusion

The Transition Sort load flow retool results indicate that AF2-042 is not eligible for the Expedited Process per PJM Tariff Part VII, Subpart B, section 304 (A) will be reprioritized to Transition Cycle #1. See next steps for your project in the "Introduction" section above.