Planning

Cost Allocation

The cost allocation data below is provided as a supplement to the Open Access Transmission TariffPDF, schedule 12 – appendix. The cost allocations on this page are updated periodically and in a similar timeframe as when the cost allocations are filed with the Federal Energy Regulatory Commission.

Transmission zone short names are consistent with attachment J of the tariff.

Help  Info XLS  XML

Upgrade ID: Transmission Owner:
 
../../pub/account/gen-queues/sp_CostAllocationXML.xml
[["b0025","Convert the Bergen-Leonia 138 kV circuit to 230 kV circuit","PSEG","$25.00",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2008"],["b0074","Rebuild 12 miles of S. Akron – Berks 230 kV to double circuit, looping Met Ed’s S. Lebanon – S. Reading line into Berks; replacement of S. Reading 230 kV breaker 107252","PPL","$48.27",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%","0%"],"6.1.2008"],["b0090","Add 150 MVAR capacitor at Camden 230 kV","PSEG","$1.25",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0121","Add 150 MVAR capacitor at Aldene 230 kV","PSEG","$1.25",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0122","Bypass the Essex 138 kV series reactors","PSEG","$0.50",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0123","Add 180 MVAR of distributed capacitors. 65 MVAR in northern JCPL and 115 MVAR in southern JCPL","JCPL","$2.70",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"6.1.2005"],["b0124.1","Add a 72 MVAR capacitor at Kittatinny 230 kV","JCPL","$0.80",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"6.1.2005"],["b0124.2","Add a 130 MVAR capacitor at Manitou 230 kV","JCPL","$1.00",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"6.1.2006"],["b0125","Add Special Protection Scheme at Bridgewater to automatically open 230 kV breaker for outage of Branchburg – Deans 500 kV and Deans 500/230 kV #1 transformer","PSEG","$0.10",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0126","Replace wavetrap on Branchburg – Flagtown 230 kV","PSEG","$0.50",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0127","Replace terminal equipment to increase Brunswick – Adams – Bennetts Lane 230 kV to conductor rating","PSEG","$0.50",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2005"],["b0129","Replace wavetrap on Flagtown – Somerville 230 kV","PSEG","$0.50",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%"],"6.1.2006"],["b0130","Replace all derated Branchburg 500/230 kV transformers","PSEG","$20.00",["1.36%","0%","0%","0%","0%","0%","0.26%","0%","0%","0%","0%","0%","0%","0%","0%","47.63%","0%","0%","0%","0%","0%","0%","50.75%","0%","0%"],"6.1.2007"],["b0132","Reconductor Portland – Kittatinny 230 kV with 1590 ACSS","JCPL","$4.40",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","100%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"6.1.2007"],["b0134","Upgrade or Retension PSEG portion of Kittatinny – Newton 230 kVcircuit","PSEG","$20.00",["0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","51.11%","0%","0%","0%","0%","0%","0%","45.96%","2.93%","0%"],"6.1.2007"],["b0135","Build new Cumberland - Dennis 230 kV circuit which replaces Cumberland - Corson 138 kV","AEC","$17.05",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0136","Install Dennis 230/138 kV transformer, Dennis 150 MVAR SVC and 50 MVAR capacitor","AEC","$27.45",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0137","Build new Dennis – Corson 138 kV circuit","AEC","$1.16",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0138","Install Cardiff 230/138 kV transformer and a 50 MVAR capacitor at Cardiff","AEC","$8.07",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0139","Build new Cardiff – Lewis 138 kV circuit","AEC","$3.69",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0140","Reconductor Laurel – Woodstown 69 kV","AEC","$4.99",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0141","Reconductor Monroe – North Central 69 kV","AEC","$4.90",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0142","Reconductor Landis – Minotola 138 kV","AEC","$1.93",["100%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%","0%"],"12.1.2007"],["b0143","Reconductor Beckett – Paulsboro 69 kV","AEC","$1.63",["100%","0%","0%