This form is used for both electronic and hard copy submittal. Please fill in all the fields and submit. Upon submission, an electronic version of this form will be sent to PJM with all the information you entered. After the electronic version is sent to PJM, the next window will open with instructions for submitting the form to PJM you will see a button to print the document at the bottom of the instruction window use that button to print this document. After printing, sign the bottom of the form and mail to PJM according to the instructions along with any necessary payment. If you should have any questions with this form, please contact System Planning Department at (610) 666-3158.

Queue AC2 is a transitional five-month long queue that will conclude on March 31, 2017. Added costs associated with attachment submissions in Month 6 do not apply to this queue. On April 1, 2017, the queues will resume six-month durations.
* Required
 
E-mail:  
 
Phone Number:  

FORM OF
INTERCONNECTION SERVICE AGREEMENT FOR
CERTIFIED INVERTER-BASED GENERATING FACILITY
FROM ATTACHMENT BB OF THE PJM TARIFF

This Certified Inverter-Based Generating Facility Interconnection Service Agreement ("Agreement") is entered into between PJM Interconnection, L.L.C. ("Transmission Provider"), ("Interconnected Transmission Owner"), and ("Interconnection Customer").

     

1. Processing Fee
  Concurrent with tendering this Agreement to Transmission Provider, Interconnection Customer shall pay a non-refundable processing fee of $500.
2. Interconnection Customer
  Name:  
  Contact Person:  
  Address:  
   
  City:  
  State:    Zip:                  
  Telephone (day):
  Telephone (evening):
  Fax:
  E-mail:
     
 

Contact Information (if different from Interconnection customer)

  Name:
  Address:
   
  City:
  State:    Zip:
  Telephone (day):
  Telephone (evening):
  Fax:
  E-mail:
3.

Small Inverter Facility Information

 
a. Location of proposed facilities:
Address 1:
 
Address 2:
City:
State:
County:
    Zip Code:  
b. Electric Service Company:
c. Customer Account Number:
d. Inverter:
  Manufacturer:
  Model:
e. Nameplate Rating:
  (kW)    (kVA)    (AC Volts)
  Single Phase      Three Phase
f. System Design Capacity:
  (kW)    (kVA)  
g. Prime Mover:
Photovoltaic Reciprocating Engine Fuel Cell
Turbine Other (describe) 
h. Energy Source:
Solar Wind Hydro
Diesel Natural Gas
Oil Fuel
Other (describe)
i. Is the equipment UL1741 Listed?  

     If Yes, attach manufacturer’s cut-sheet showing UL1741 listing

Estimated Installation Date:
Estimated In-Service Date:
Owner of the Small Inverter Facility

(include % ownership by any electric utility):
4. Certification of Small Inverter Facility
 

The Interconnection Customer represents and warrants that the Small Inverter Facility which is the subject of this Agreement is no larger than 10 kW and it meets the codes, standards, and certification requirements of Attachments Z and AA of the PJM Open Access Transmission Tariff (“Tariff”) , or in lieu of such representation and warranty,  the Transmission Provider has reviewed the design or tested the proposed Small Inverter  Facility and is satisfied that it is safe to operate.

The following is a list of components of the Small Inverter Facility equipment package that are currently certified:

 
Equipment Type Certifying Entity
1.
2.
3.
4.
5.
5.

Authority and Incorporation of Tariff
This Agreement is entered into pursuant to Part IV of the Tariff.  Interconnection Customer has requested an Certified Inverter-Based Generating Facility Interconnection Service Agreement under the Tariff and Transmission Provider has determined that Interconnection Customer is eligible under the Tariff to obtain this Agreement.  The standard terms and conditions for interconnection of Small Inverter Facilities as set forth in section 112B the Tariff as of the date of this Agreement are attached as Appendix A to this Agreement and are hereby specifically incorporated as provisions of this Agreement.  Transmission Provider, Interconnected Transmission Owner and Interconnection Customer agree to and assume all of the rights and obligations of the Transmission Provider, Interconnected Transmission Owner and Interconnection Customer, respectively, as set forth in the appended provisions of section 112B.

6.

Effective Date
This Agreement shall become effective on the date it is executed by the Transmission Provider and shall terminate on such date as mutually agreed upon by the parties,

7.

Assumption of Tariff Obligations
Interconnection Customer agrees to abide by all rules and procedures pertaining to generation and transmission in the PJM Region, including but not limited to the rules and procedures concerning the dispatch of generation or scheduling transmission set forth in the Tariff, the Operating Agreement and the PJM Manuals.

8.

Waiver
No waiver by either party of one or more defaults by the other in performance of any of the provisions of this Agreement shall operate or be construed as a waiver of any other or further default or defaults, whether of a like or different character.

9.

Amendment
This Agreement  or any part thereof, may not be amended, modified, assigned, or waived other than by a writing signed by all parties hereto.

10.

Critical Infrastructure
Infrastructure security of electric system equipment and operations and control hardware and software is essential to ensure day-to-day reliability and operational security.  All Transmission Providers, Interconnected Transmission Owner, market participants, and Interconnection Customers interconnected with electric systems to comply with the recommendations offered by the President's Critical Infrastructure Protection Board and best practice recommendations from the electric reliability authority.  All public utilities are expected to meet basic standards for electric system infrastructure and operational security, including physical, operational, and cyber-security practices.

11.

PJM Queue Number
The PJM queue number associated with this Agreement is:

12.

Site Control
Concurrent with tendering this Agreement to Transmission Provider, Interconnection Customer shall submit documentation of site control.

Transmission Provider
By:
  Name Title Date
     
Interconnection Customer
By:
Name Title Date
     
Interconnected Transmisison Owner
By:
Name Title Date