Markets & Operations

Post Contingency Local Load Relief Warnings

The Post Contingency Local Load Relief Warnings tool is utilized in the coordination of post-contingency load shed plans between PJM and impacted transmission owners.

Sign In | Register

CEII requirements for requesting access

Acceptable Terms of Use
Data connections should not exceed 600 per minute.

Training

Sandbox: Sign In | Register

Videos

Date
Overview: Training Session
12.2.2014
Deficient Status
12.2.2014
Low Voltage PCLLRW
12.2.2014
Valid Status
12.2.2014